37-015-23191

Well Details

Well ID: 37-015-23191
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Monroe Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148630
Farm/Lease Name: JOHNSON BRA
License Status: Inactive
Spud Date:
Permit Date: 2015-03-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.668647
Longitude: -76.4611

For data sources see[1][2][3]

Well History

Date Event
2015-03-09 New Permit Application
2015-04-28 New Permit Application
2015-07-10 Performed Spud Operation
2016-11-01 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 173.25 Tons LANDFILL 8-4630-00010/00
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 721.24 Tons LANDFILL 8-0728-0004/013
2015 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 60.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Drill Cuttings 1,237.43 Tons LANDFILL THR029
2015 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 12,609.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 278.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.10 Tons CENT WASTE TRT FAC NPDES PAG034815
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.10 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 33.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.80 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 11.45 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 84.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2406144 Primary Facility 2015-08-25 Routine/Complete Inspection No Violations Noted Nomac Drilling Rig #75 is currently drilling the Johnson Bra 4H well at (6,762) feet. The Johnson Bra 2H and 5H wells were in production, but are currently shut in. The Johnson Bra 3H has been drilled to total depth relatively recently. Water accumulated in the pad surface next to the containment for the flare stack was (2.5) milliSiemens/cm³ in conductivity and (4) milliSiemens/cm³ in conductivity on containment in the backyard near the containment berm next to the site perimeter berm. The water is discolored and appears to contain drill cuttings mixed with lime as part of the Pug mill process, either overtopping the containers storing the cuttings or the cuttings being transported out of the containers by wind and mixing with rain water. Lime is utilized as a drying agent for the cuttings. It as appears as if calcium chloride powder has been spilled to containment and close to edge of containment and the ground surface in the chemical storage area.
2406862 Primary Facility 2015-09-11 Routine/Complete Inspection No Violations Noted Arrived @ 14:00. Weather was sunny and warm following rain the previous day. There were 4 wells spudded on the pad. The 2H and 5H, producing wells, were shut-in. The 3H was recently drilled. Nomac 75 was working on the 4H. I met with company man Darryl Smith. At the time of my inspection NOMAC 75 was conducting an open-hole sidetrack in the lateral. Prior to the inspection the drill string had gotten stuck in the lateral at approximately 17,297’ (TD: 18,854’). The drill string had been severed at 12,200’ and the open- hole sidetrack was at 10,545’.
2513045 Primary Facility 2016-08-22 Routine/Complete Inspection No Violations Noted
2710547 Primary Facility 2018-03-23 Drilling/Alteration No Violations Noted Stimulation activities being conducted by Nine and BJ energy services. Wood and steel rig matting in place above polyurethane liner. Secondary containment in place. No leaks detected.
2716530 Primary Facility 2018-04-10 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:24. The weather conditions are sunny skies, with a slight breeze and temperatures in the mid to upper 40's. CHK submitted a Stimulation Notification per 58 Pa. C.S. 3211(f)(2) to the Department on 3/15/18. The notification indicated that CHK would commence stimulation operations on the Johnson Bra 3H well between 5 PM on 3-16-18 and 8 PM on 3-7-18. Shortly after I arrived, I met with Deismond Bufford, site company man, completions consultant of CHK in the company man trailer. BJ Energy Services, LLC is the CHK subcontractor at the site in the process of conducting hydraulic fracturing (stimulation) opearations. Mr. Bufford provided me with the following details regarding site activities. "The Johnson Bra 3H is being stimulated. The Johnson 2H and 5H were in in production, but are currently shut in. We started here last week or weekend. We are on stage (32) currently and (55) stages will be the max with (6) frac stages a day for this well. There are (2) AST's storing water used for

For data sources see[7]

References