X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-21128

Well Details

Well ID: 37-021-21128
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Allegheny Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: M DIEHL 4
License Status:
Spud Date:
Permit Date: 2009-03-30
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.534547
Longitude: -78.633823

For data sources see[1][2][3]

Well History

Date Event
2009-03-30 New Permit Application
2009-05-22 Performed Spud Operation
2009-06-01 Drilling Completion
2009-06-11 Perforation
2010-04-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 TEXAS KEYSTONE INC 1908.00 97 0.00 0 0.00 0
2010 TEXAS KEYSTONE INC 989.00 215 0.00 0 0.00 0
2011 TEXAS KEYSTONE INC 1,701.00 159 0.00 0 0.00 0
2012 TEXAS KEYSTONE INC 532.00 250 0.00 0 0.00 0
2013 TEXAS KEYSTONE INC 217.00 100 0.00 0 0.00 0
2014 TEXAS KEYSTONE INC 280.00 136 0.00 0 0.00 0
2015 TEXAS KEYSTONE INC 111.00 57 0.00 0 0.00 0
2016 DIVERSIFIED OIL & GAS LLC 36.00 9 0.00 0 0.00 0
2017 DIVERSIFIED OIL & GAS LLC 52.00 11 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 212.00 122 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 TEXAS KEYSTONE INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1800130 Primary Facility 2009-05-22 Routine/Complete Inspection No Violations Noted Well site was properly identified. No visible E&S concerns at the time of inspection. E&S plan and Site ID sign located at entrance of access road. DEP met Tom Hill from Falcon Drilling stated that drilling will start later part of May 22, 2009 to set conductor pipe (40' fbg). Pit will be aligned with 20 mil plastic. Work will resume on May 26, 2009. Site was in the process of drilling setting up. Water coming from pond near Kimball's property along Loretto Road. Piping and water trucks coming from Diehl #3 well site across road.
1803963 Primary Facility 2009-06-08 Routine/Complete Inspection No Violations Noted Well site has been restored. There are no signs of erosion and sedimentation on the access road and well site. Brine tank is in sound condition. Operator should continue to monitor the well site and access road until final restoration activities are complete.
1817891 Primary Facility 2009-08-03 Routine/Complete Inspection No Violations Noted Well site has been regraded, seeded and mulched. The diversion ditch should be stabilized with erosion matting, rip-rap, or some other material to minimize erosion and sedimentation until the vegatation takes hold. Brine tank is in sound condition. Well is equipped for production. Operator should continue to monitor the well site and access road until final restoration activities are complete.
2040790 Primary Facility 2012-01-31 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.
2334693 Primary Facility 2014-12-30 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.
2465378 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted no issues. gas well was not in production.
2655428 Primary Facility 2017-11-01 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References