If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26486 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.831847,"lon":-78.642972,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Ferguson Township | |
Operator Name: VEC ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: THOMSON 150 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2007-07-03 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.831847 | |
Longitude: -78.642972 |
Date | Event |
---|---|
2007-07-03 | New Permit Application |
2007-09-21 | Performed Spud Operation |
2007-09-25 | Drilling Completion |
2007-10-07 | Perforation |
2009-09-09 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | VICTORY ENERGY CORP | 2125.23 | 208 | 0.00 | 0 | 0.00 | 0 |
2010 | VICTORY ENERGY CORP | 1,761.50 | 266 | 0.00 | 0 | 0.00 | 0 |
2011 | VICTORY ENERGY CORP | 1,893.28 | 322 | 0.00 | 0 | 0.00 | 0 |
2012 | VICTORY ENERGY CORP | 1,594.57 | 184 | 0.00 | 0 | 0.00 | 0 |
2013 | VICTORY ENERGY CORP | 1,408.50 | 208 | 0.00 | 0 | 0.00 | 0 |
2014 | VICTORY ENERGY CORP | 1,311.31 | 236 | 0.00 | 0 | 0.00 | 0 |
2015 | VICTORY ENERGY CORP | 1,221.22 | 272 | 0.00 | 0 | 0.00 | 0 |
2016 | VICTORY ENERGY CORP | 992.05 | 340 | 0.00 | 0 | 0.00 | 0 |
2017 | VICTORY ENERGY CORP | 763.00 | 322 | 0.00 | 0 | 0.00 | 0 |
2018 | VEC ENERGY LLC | 623.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | VICTORY ENERGY CORP | Brine | 136.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | VICTORY ENERGY CORP | Brine | 94.00 Bbl | Road Spreading | |
2010 | VICTORY ENERGY CORP | Produced Fluid | 85.00 Bbl | Road Spreading | |
2011 | VICTORY ENERGY CORP | Produced Fluid | 295.00 Bbl | Road Spreading | |
2013 | VICTORY ENERGY CORP | Produced Fluid | 15.00 Bbl | Road Spreading | |
2014 | VICTORY ENERGY CORP | Produced Fluid | 125.00 Bbl | Road Spreading | |
2015 | VICTORY ENERGY CORP | Produced Fluid | 140.00 Bbl | Road Spreading |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1631807 | Primary Facility | 2007-06-14 | Routine/Complete Inspection | No Violations Noted | WETLAND WAIVER REVIEW. PLAN ACCEPTABLE. LOCATION STAKED. |
1741100 | Primary Facility | 2008-10-07 | Routine/Complete Inspection | No Violations Noted | Well drilled-tagged. Vegetation started. E&S controls Ok. |
2680622 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | Routine site inspection of Victory Energy Corporation's (VEC) conventional well 033-26486 (Thomas 150) on January 9, 2018. There is one producing conventional well, a separator, a produced fluids tank, and a metering system located onsite. The produced fluids tank was about 1/2 full. The ground was snow covered. I did not observe any E&S issues during my inspection nor did I smell any odors during my inspection. |
For data sources see[7]