Well Details

Well ID: 37-059-26832
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 151352
Farm/Lease Name: HILDEBRAND 592626
License Status:
Spud Date:
Permit Date: 2015-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.978397
Longitude: -80.094086

For data sources see[1][2][3]

Well History

Date Event
2015-03-12 New Permit Application
2015-06-16 Performed Spud Operation
2015-09-01 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-14 2016-04-20 7,865 7,480,240 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC MX 5-3886 Multi-Chem Group Specialty Brine Calcium nitrate.4H2O 13477-34-4 100 0.109708 76490.5
Hydrochloric Acid (15%) C and J Energy Services Acidizing Hydrochloric Acid 7647-01-0 15 0.0297758 20760.3
FR-18 C and J Energy Services Anionic Friction Reducer Ethylene Glycol 107-21-1 10 0.00795131 5543.8
Distillates (petroleum), Hydrotreated Light 64742-47-8 45 0.0357809 24947.1
MC MX 8-2544 Multi-Chem Group Live Culture - Nitrate Reducing Bacteria Sodium chloride 7647-14-5 100 0.0097382 6789.66
Sodium nitrate 7631-99-4 5 0.00048691 339.483
Water C and J Energy Services Carrier/Base Fluid Water 7732-18-5 100 89.5309 62,422,600.0
Sand (Proppant) C and J Energy Services Proppant Silica Substrate 14808-60-7 100 10.0456 7,004,000.0
Cl-3 C and J Energy Services Corrosion Inhibitor 4-nonylphenol, Branched, Ethoxylated 127087-87-0 5 0.00001985 13.84
Triethyl Phosphate 78-40-0 2.5 0.00000993 6.92
Cinnamaldehyde 104-55-2 15 0.00005955 41.521
Dimethylformamide 68-12-2 20 0.00007940 55.361
1-octanol 111-87-5 2.5 0.00000993 6.92
1-decanol 112-30-1 5 0.00001985 13.84
Ethylene Glycol 107-21-1 40 0.000158805 110.721
2-butoxyethanol 111-76-2 15 0.00005955 41.521
Isopropanol 67-63-0 2.5 0.00000993 6.92
Tar bases, Quinoline Derivs., Benzyl Chloride-quaternized 72480-70-7 15 0.00005955 41.521
SI-6 C and J Energy Services Scale Inhibitor Trade Secret Proprietary 7 0.00179366 1250.58
Monoethanolamine hydrochloride 2002-24-6 2 0.000512475 357.307
Methanol 67-56-1 1 0.000256237 178.654
Ammonium Chloride 12125-02-9 2 0.000512475 357.307

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 1,545,044.00 246 0.00 0 0.00 0
2017 EQT PROD CO 1,128,220.00 361 0.00 0 0.00 0
2018 EQT PROD CO 834,616.00 357 0.00 0 0.00 0
2019 EQT PROD CO 536,120.00 299 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 EQT PROD CO Drilling Fluid Waste 5,469.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracing Fluid Waste 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Fracturing Fluid Waste 24.61 Tons LANDFILL 100277
2015 EQT PROD CO Drill Cuttings 1,266.52 Tons LANDFILL 100419
2015 EQT PROD CO Fracing Fluid Waste 1,230.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Servicing Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Drilling Fluid Waste 3,510.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 1,782.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Synthetic Liner Materials 4.10 Tons LANDFILL 100419
2016 EQT PROD CO Produced Fluid 705.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Fracturing Fluid Waste 435.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 155.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 EQT PROD CO Synthetic Liner Materials 12.50 Tons LANDFILL 100277
2016 EQT PROD CO Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016 EQT PROD CO Drill Cuttings 110.62 Tons LANDFILL 100419
2016 EQT PROD CO Waste Water Treatment Sludge 19.57 Tons LANDFILL 100277
2016 EQT PROD CO Other Oil & Gas Wastes 16.96 Tons LANDFILL 100419
2016 EQT PROD CO Produced Fluid 755.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 13,584.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 47.16 Bbl LANDFILL 101571
2017 EQT PROD CO Other Oil & Gas Wastes 34.02 Tons LANDFILL 100277
2017 EQT PROD CO Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 299.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 1,761.81 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 47.13 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 711.92 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 26.45 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 164.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 98.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 68.57 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 732.09 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2395462 Primary Facility 2015-06-29 Drilling/Alteration Violation(s) Noted Horizontal Marcellus, Notification of casing cementing on (6/28/2015) by phone message. Prior to cementing 13 3/8" (combination water and coal casing) operator addressed concerns about potential circulation issues Notification by phone from operator after cementing verified (no circulation) during cementing job.The backside was grouted.The well is being drilled through ( Pittsburgh Seam ) coal removed ,78.83 regulations apply. Drilling through pillar a 4"stream of mine water was discharged to surface.This mine is known to be flooded with water.The Department has concerns of co-mingling mine water with fresh water zones. Pursuant to regulation (78.71)(a) (2) Prevent the migration of gas or other fluids into sources of fresh groundwater.
2511696 Primary Facility 2016-07-26 Routine/Complete Inspection No Violations Noted

On 07/26/16 at approximately 1330 hours I conducted an incident response inspection at the EQT Hildebrand well pad in response to a BMP blowout at the site. The Act 9 sign was in place and all required documents were present.

The site was being restored at the time of the BMP failure. A large rainfall event had occurred, overwhelming the sediment trap and causing the downslope wall of the sediment trap to fail. The resulting water, rock, and sediment broke through multiple silt socks leaving the LOD and entering a stream. A large amount of rock and gravel was found in the stream bed approximately 150’ from the sediment trap failure (see photographs). A pond approximately 200-250’ downstream was discolored from the sediment released from the BMP failure. At the time of inspection an excavator was repairing the breach in the sediment trap wall. EQT was advised to apply for an emergency 105 permit to repair the section of the stream that was impacted by the BMP failure.

The following violations resulted fro

2547890 Primary Facility 2016-10-14 Compliance Evaluation No Violations Noted

On 10/14/16 at approximately 1100 hours I conducted a compliance evaluation inspection at the EQT Hildebrand. The Act 9 sign was in place and all required documents were present at the site. In July 2016 the site had a sediment trap blowout, resulting in rock and sediment breaking through multiple silt socks and impacting a nearby stream. An emergency 105 permit was obtained by EQT and the material was removed from the stream. The sediment trap and erosion had been repaired at the time of inspection and the site was exhibiting new vegetation. There were no violations observed at the time of inspection.

2569666 Primary Facility 2017-03-07 Complaint Inspection No Violations Noted

On 03/06/16 a complaint was received by the Department alleging BMP failures at the Hildebrand well site. On 03/07/17 at approximately 1330 hours I, along with Water Quality Specialist Supervisor John Carson, conducted a complaint inspection of the site. The Act 9 sign was in place and all required documents were present.

Gravel from the site was found across Bowser Road. This is a violation of 102.5(m)(4) for impacts outside of the limits of disturbance.

A black corrugated pipe that was not shown on the E&S plans was observed on the right side of the access road immediately upon entry to the site. It is requested that EQT provide information on this pipe in the NOV response.

The rain garden was not functioning as designed and is at risk of failure. Water was bypassing the riser structure and draining through the soils between the rain garden toward the channel near the stilling well. A significant amount of sediment was observed in the rain garden and sediment laden water was observed in the stilling

2595660 Primary Facility 2017-04-05 Follow-up Inspection No Violations Noted On 04/05/17 at approximately 1200 hours I along with WQSS John Carson and Environmental Engineer Donna Davis conducted a follow up inspection of the Hildebrand site in response to an NOV issued on 03/07/17.

The leak around the riser structure in the rain garden had been repaired. The rain garden appears to contain sediment from poorly stabilized adjacent slopes. The slopes appeared to be failing, depositing sediment into the rain garden and causing a loss of volume. Additionally, erosion was occurring along the southwestern rip rap channel into the rain garden. It is recommended that this be repaired to prevent further erosion and volume loss. It is requested that EQT contact Donna Davis to discuss maintenance of the BMP. It is requested that EQT contact Donna Davis regarding the cross drain causing erosion into the pond on UNT to Castile Run.

The silt socks that were previously undercut or overtopped had been maintained to prevent undercutting, but sediment was still close to or at the top of the silt soc

2638145 Primary Facility 2017-09-20 Site Restoration No Violations Noted A site inspection was conducted in response to EQT requesting a meeting to discuss site vegetation and silt sock removal. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated. The erosion channel from near the access road to the location of the removed sediment trap was vegetated. It is recommended that the erosion channel be repaired to original grade, seeded, and mulched. The rain garden appeared to be in good condition. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2692715 Primary Facility 2018-01-29 Site Restoration No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site entrance exhibited signs of access road erosion (see photographs). It appeared water was overflowing the culvert and removing material from the access road near the Act 9 sign.

The site did not exhibit uniform 70% vegetative cover. Areas of poor or no vegetative cover were observed. Erosion was occurring along the access road below the check dams in the location of the removed sediment trap (see photographs).

The site does not meet the requirements for permit termination. The NOT is denied.

2760152 Primary Facility 2018-07-19 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT Production Co. The Act 9 sign was in place and all required documents were present.

Erosion of the access road was observed at the site entrance. Metal grates were in place over a large channel in the access road (see photographs). The channel continued off the site parallel to Bowser Road heading South. Erosion of the access road along the right side was also observed (see photographs). Erosion was observed adjacent to the left side of the access road below a neighboring pond, exposing a black pipe.

Poorly vegetated soil and accelerated erosion were observed where silt sock was removed in the area of the restored sediment trap. Multiple small erosion rills were observed in the vegetated area upslope. It appeared the rills existed and were not repaired prior to the vegetation grew and covered the rills. It is recommended the accelerated erosion is repaired.

The site does not meet the requirements for permit terminatio

2809722 Primary Facility 2018-11-14 Site Restoration No Violations Noted A meeting was requested by EQT to evaluate the site for NOT criteria. The Act 9 sign was in place and all required documents were present at the site. PCSM was installed and appeared to be functioning. Site vegetation met the requirement of 70% uniform vegetative cover. The site meets the requirements for permit termination. The NOT is approved.
2849648 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted On 02/25/19 at approximately 1220 hours I conducted an inspection of the site. It appeared recent heavy rains had caused the pit collecting water for the culvert to overflow at the site entrance, causing wash out of the access road. Ice was present on Bowser road and appeared to have been caused by water leaving the well site.

Water from the adjacent private pond was eroding through the pond bank along the pipe leading to the culvert inlet. The inlet from the pond was clogged with debris, causing water to divert around the pipe and erode alongside it.

The culvert appeared to be functioning at the time of inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2395462 731626 06/29/2015 2015-06-29 78.83_(c) - CASING AND CEMENTING - SURFACE AND COAL PROTECTIVE CASING AND CEMENTING PROCEEDURES - Operator set surface casing more than 200 feet below the deepest fresh groundwater. Surface casing seat was not set in consolidated rock. Environmental Health & Safety
2395462 731627 06/29/2015 2015-06-29 78.83(d) - CASING AND CEMENTING - SURFACE AND COAL PROTECTIVE CASING AND CEMENTING PROCEEDURES - Operator failed to permanently cement the surface casing by placing the cement in the casing and displacing it into the annular space between the wall of Environmental Health & Safety
2395462 731628 06/29/2015 2015-06-29 78.83(h) - CASING AND CEMENTING - SURFACE AND COAL PROTECTIVE CASING AND CEMENTING PROCEEDURES - For wells drilled thru a coal seam(s) where the coal has been removed or when drilled thru a coal pillar, the operator failed to follow requirements for Environmental Health & Safety
2395462 731629 06/29/2015 2015-06-29 78.83(g) - CASING AND CEMENTING - SURFACE AND COAL PROTECTIVE CASING AND CEMENTING PROCEEDURES - Operator failed to set and cement a coal protective string of casing thru workable coal seams. Failure to install base of coal protective casing at leas Environmental Health & Safety
2395462 731630 06/29/2015 2015-06-29 78.81(a)2 - CASING AND CEMENTING - GENERAL PROVISIONS - Operator conducted casing and cementing activities that failed to prevent migration of gas or other fluids into sources of fresh groundwater. Environmental Health & Safety
2395462 731631 06/29/2015 2015-06-29 78.81(b) - CASING AND CEMENTING - GENERAL PROVISIONS - The operator failed to drill through fresh groundwater zones with diligence and as efficiently as practical to minimize drilling disturbance and commingling of groundwaters. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
731626 328293 NOV - Notice of Violation
731626 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00
731627 328293 NOV - Notice of Violation
731627 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00
731628 328293 NOV - Notice of Violation
731628 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00
731629 328293 NOV - Notice of Violation
731629 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00
731630 328293 NOV - Notice of Violation
731630 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00
731631 328293 NOV - Notice of Violation
731631 348896 CACP - Consent Assessment of Civil Penalty Comply/Closed 2016-11-23 2016-11-23 $18,750.00 $18,750.00