37-063-00115

Well Details

Well ID: 37-063-00115
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Conemaugh Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: T M GUIHER 87A 1
License Status: ACTIVE
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.530843
Longitude: -79.374925

For data sources see[1][2][3]

Well History

Date Event
1949-06-20 Drilling Completion
1986-06-25 OLD WELL

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 PEOPLES TWP LLC 2293.00 365 0.00 0 0.00 0
1992 PEOPLES TWP LLC 2679.00 366 0.00 0 0.00 0
1993 PEOPLES TWP LLC 2775.00 365 0.00 0 0.00 0
1994 PEOPLES TWP LLC 2807.00 365 0.00 0 0.00 0
1995 PEOPLES TWP LLC 2655.00 365 0.00 0 0.00 0
1996 PEOPLES TWP LLC 1936 365 0.00 0 0.00 0
1997 PEOPLES TWP LLC 1931 365 0.00 0 0.00 0
1998 2960 251 0.00 0 0.00 0
1999 PEOPLES TWP LLC 1930 365 0.00 0 0.00 0
2000 CONSOL GAS CO 3579 365 0.00 0 0.00 0
2001 PEOPLES TWP LLC 1931 365 0.00 0 0.00 0
2002 PEOPLES TWP LLC 1931 365 0.00 0 0.00 0
2003 PEOPLES TWP LLC 1448 365 0.00 0 0.00 0
2004 PEOPLES TWP LLC 1448 365 0.00 0 0.00 0
2005 PEOPLES TWP LLC 965 365 0.00 0 0.00 0
2006 TW PHILLIPS GAS SUPPLY CORP 632.00 243 0.00 0 0.00 0
2007 TW PHILLIPS GAS SUPPLY CORP 1653.00 365 0.00 0 0.00 0
2008 TW PHILLIPS GAS SUPPLY CORP 56.00 58 0.00 0 0.00 0
2010 TW PHILLIPS GAS SUPPLY CORP 40.00 53 0.00 0 0.00 0
2011 TW PHILLIPS GAS SUPPLY CORP 155.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 1,212.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 1,153.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 1,548.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 2,296.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 772.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 481.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 1,519.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2480588 Primary Facility 2016-04-26 Routine/Partial Inspection In Compliance with Policy On-site meeting as requested by Operator representative Kenny Radzieta to review E&S plans for the transfer of a gathering pipeline. XTO representative Gordon Bish and Mountain Gathering representative Jerry also present.

According to Mr. Radzieta, PENNDOT is replacing a bridge where XTO’s gathering pipeline is installed under the stream that this bridge crosses. In order for the bridge replacement to be completed, the gathering pipeline must be removed. The Operator is planning to replace this gathering pipeline a short distance from its former location and intends to underground bore for the pipeline installation. The gathering pipeline is to be installed under an agricultural field. Mr. Radzieta inquired as to whether a temporary road is necessary for the work required for this project. As the Operator has hired a consultant to develop an E&S plan for this project, the Department recommended that the Operator implement the E&S plan as outlined in accordance with current regulations. The representatives

2563245 Primary Facility 2017-02-07 Routine/Complete Inspection In Compliance with Policy On-site meeting as requested by Operator representative Marc Maestra to review E&S plans for the transfer of a gathering pipeline. Operator representative Mike Purdom and Department WQSS April Weiland also present.

Per Mr. Purdom, the Operator intends to underground bore for the installation of the new pipeline. The gathering pipeline is to be installed under an agricultural field and one stream. The bore is to occur 30 feet under the stream. The Department reviewed the E&S plan for the project. The Department recommends that additional temporary E&S BMPs are installed as necessary in order to prevent any potential pollution events from occurring. The Operator shall install the temporary E&S BMPs prior to conducting any earth disturbance. The Operator anticipates commencing this pipeline bore within the week and will notify the Department prior to doing so. Operator appears to be in compliance with current policy at this time.

2563309 Primary Facility 2017-02-15 Routine/Complete Inspection No Violations Noted At time of inspection, operations for underground bore in process. Operator representative Mike Purdom and contractors on-site.

E&S plan on-site. Temporary E&S BMPs appear to be installed in accordance with E&S plan. No accelerated erosion and/or sedimentation issues observed during this inspection. Per Mr. Purdom: Boring operations commenced yesterday (2/14/17). At this time, the bore is on the threshold of crossing underneath the stream. There have been no issues with the bore to date. Mr. Purdom will notify the Department of any issues and/or concerns that may arise with this project and will notify the Department when boring operations have been completed. WQSS A. Weiland present during inspection.