X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-24147

Well Details

Well ID: 37-063-24147
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: South Mahoning Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: D W RARAIGH 3253
License Status: ACTIVE
Spud Date: 1940-01-04
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.807822
Longitude: -79.214574

For data sources see[1][2][3]

Well History

Date Event
1940-02-23 Drilling Completion
1978-03-02 OLD WELL

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 EQUITRANS INC 5325.00 363 0.00 0 0.00 0
1992 EQUITRANS INC 1091.00 330 0.00 0 0.00 0
1993 EQUITRANS INC 3043.00 332 0.00 0 0.00 0
1994 EQUITRANS INC 2914.00 363 0.00 0 0.00 0
1995 EQUITRANS INC 2099.00 365 0.00 0 0.00 0
1996 EQUITRANS INC 1580 365 0.00 0 0.00 0
1997 EQUITRANS INC 2119 365 0.00 0 0.00 0
1998 EQUITRANS INC 2508 365 0.00 0 0.00 0
1999 EQUITRANS LP 1963 365 0.00 0 0.00 0
2000 EQUITRANS INC 1414 365 0.00 0 0.00 0
2001 EQUITABLE PROD EASTERN STATES EXPLORATION INC 1171 365 0.00 0 0.00 0
2003 EQT PROD CO 1166 365 0.00 0 0.00 0
2005 EQUITRANS INC 1166 365 0 365 0.00 0
2010 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2011 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2012 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2013 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2014 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2015 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2016 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2017 EQUITRANS INC 0.00 0 0.00 0 0.00 0
2018 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2764644 Primary Facility 2018-08-17 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives.

2764648 Primary Facility 2018-08-16 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.
2765013 Primary Facility 2018-08-20 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location.

2766031 Primary Facility 2018-08-22 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues.

2770087 Primary Facility 2018-08-30 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom

2770375 Primary Facility 2018-09-04 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom. 9/4/18 - last cmt. plug came up into 3" csg. 700'. Going to start drilling cmt. out 9/5/18.

2776276 Primary Facility 2018-09-18 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom. 9/4/18 - last cmt. plug came up into 3" csg. 700'. Going to start drilling cmt. out 9/5/18. 9/18/18 - loading hole to bond log tomorrow.

2776865 Primary Facility 2018-09-19 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom. 9/4/18 - last cmt. plug came up into 3" csg. 700'. Going to start drilling cmt. out 9/5/18. 9/18/18 - loading hole to bond log tomorrow. 9/19/18 - Timco logged well, pipe appears to be free. Going to shoot 3" csg. around 1492'.

2780008 Primary Facility 2018-09-26 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom. 9/4/18 - last cmt. plug came up into 3" csg. 700'. Going to start drilling cmt. out 9/5/18. 9/18/18 - loading hole to bond log tomorrow. 9/19/18 - Timco logged well, pipe appears to be free. Going to shoot 3" csg. around 1492'. 9/26/18 - Cmt. well to surface.

2782316 Primary Facility 2018-10-02 Plugging(Includes Plugged/Mined Through) No Violations Noted 8/16/18 - Location built, rig not on pad.

8/17/18 - Penn Mechanical preparing well before rig arrives. 8/20/18 - Plugging operation has not started yet. No equipment on location. 8/22/18 - discussed with Penn Mechanical well head issues. 8/30/18 - called attainable bottom @ 2613'. Set cmt. plug on bottom. 9/4/18 - last cmt. plug came up into 3" csg. 700'. Going to start drilling cmt. out 9/5/18. 9/18/18 - loading hole to bond log tomorrow. 9/19/18 - Timco logged well, pipe appears to be free. Going to shoot 3" csg. around 1492'. 9/26/18 - Cmt. well to surface. 10/2/18 - Rig moved off location. Well plugged, monument attached.

2782650 Primary Facility 2018-09-27 Routine/Complete Inspection No Violations Noted Inspection conducted in response to a NOI to Plug a Well received by Department on 6-22-18.

E and S plan on site. No activity taking place on site at this time. At time of inspection well appears to be plugged. Temporary BMP's appear installed as per the E and S plan and appear to be functioning as intended. Department recommends operator continue to monitor and maintain BMP's due to the severe topography surrounding this site. Three roll off boxes on site. Wooden platform and equipment remain on site (photo #1).

For data sources see[6]

References