37-105-21699

Well Details

Well ID: 37-105-21699
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Hector Township
Operator Name: TRIANA ENERGY LLC
Well Pad ID: 149474
Farm/Lease Name: TRIANA YOUNG PAD A 6H
License Status: INACTIVE
Spud Date: 2011-06-07
Permit Date: 2010-08-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.864192
Longitude: -77.6827

For data sources see[1][2][3]

Well History

Date Event
DEVIATED
2010-08-02 New Permit Application
2011-06-07 Performed Spud Operation
2011-07-22 Drilling Completion
2019-02-25 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2011 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2012 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2013 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2014 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2015 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2016 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0
2019 TRIANA ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 TRIANA ENERGY LLC Drill Cuttings 612.00 Tons LANDFILL 101397
2011 TRIANA ENERGY LLC Drill Cuttings 758.00 Tons LANDFILL 100361

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2011396 Primary Facility 2011-10-12 Routine/Complete Inspection No Violations Noted On Oct. 12, 2011 a routine inspection was conducted at the Triana Young Pad A well site. The site ID sign, E&S plan, E&S controls and perimeter of the site were observed. The access road and associated controls were installed and well maintained. The freshwater impoundment was installed and partially fenced. The pad surface was constructed and partially lined. The perimeter BMPs were installed and maintained. All slopes were stabilized. No violations were cited during this inspection. - MRN
2040928 Primary Facility 2012-02-02 Routine/Complete Inspection No Violations Noted
2062315 Primary Facility 2012-04-25 Routine/Complete Inspection No Violations Noted
2100733 Primary Facility 2012-09-05 Administrative/File Review Violation(s) Noted
2182179 Primary Facility 2013-07-10 Routine/Partial Inspection No Violations Noted site stabilized, no puddles screened exhibited elevated conductance, no issues noted
2464356 Primary Facility 2016-03-08 Routine/Complete Inspection No Violations Noted The pad size measures ~300’x 350’. The main liner is still visible, along with smaller pieces of liner collecting rainwater around the perimeter of the pad. Puddles were observed on the east and west corners of the pad with conductivity measuring ~250 µs/cm. Three wells were visible on the pad. Each well/cellar has been covered by a large steel plate. The cellars appeared full of water. No well ID tags were visible. Bubbling was observed in the cellars of both the middle and eastern wells on the pad. The OGI inspector supervisor was notified. The outslopes of the pad surface appear stable, mostly rocky with patches of vegetation. Silt sock was observed around the toe of the slope.

An application to terminate a portion of the ESCGP-1 permit and re-permit the site under an ESCGP-2 was received by the NCRO on 9/28/15. This site is now permitted under an ESCGP-2, permit# ESX10-105-0013(02) No violations are issued at this time. Please contact me with any questions. I departed the site @ 1330.

2619159 Primary Facility 2017-07-19 Routine/Complete Inspection No Violations Noted On 7/19/17 at 1230 hrs I conducted an inspection at the Triana Young Pad A well site. No one was present during my inspection. It was mostly sunny and 83 degrees F.

The site consists of a well pad, impoundment and access road. It was originally permitted by an ESCGP-1 on 7/30/10; the permit was amended on 11/5/10 for the construction of the impoundment. On 12/14/15, the permit was amended again upon issuance of an ESCGP-2.

The freshwater impoundment is located along the access road, before the well pad. The impoundment is protected with a fence, had adequate freeboard and no holes were observed in the liner (Photo #4).

The 2H, 4H and 6H wells were drilled in 2011 and placed on inactive status on 1/16/14 (Photo #1). No new well permits have been issued for the location. The cellars were filled with water and bubbling was noted around the 2H and 6H wellheads. This information was passed along to the Oil and Gas Inspector Supervisor. The wells are connected to a poly tank, which appeared to contain a minimal

2627444 Primary Facility 2017-08-17 Compliance Evaluation No Violations Noted On 8/17/17 at 0914 hrs I conducted an inspection at the Triana Young Pad A well site. No one was present during my inspection. It was mostly sunny and 62 degrees F.

The purpose of the inspection was to follow up on violations cited against the 2H permit (105-21697) during the 7/19/17 inspection. Documentation of routine E&S inspections and a copy of the ESCGP-2 were not found in the site mailbox during the 7/19/17 inspection. Triana provided copies of the routine E&S inspections upon request, demonstrating that they are being completed. The violation was resolved upon receipt of the inspection documentation. In addition, old permits and paperwork were removed from the site mailbox and replaced with copies of the E&S inspections and the ESCGP-2. A lock was placed on the mailbox to prevent theft of the contents.

It was also noted during the last inspection that the well site did not appear to be restored and post construction stormwater management (PCSM) BMPs installed. In response, Triana's consultant prov

2628813 Primary Facility 2017-08-24 Administrative/File Review No Violations Noted On 8/24/17 I reviewed and acknowledged the Triana Young Pad A Well Site Restoration Report (WSRR). The report was submitted electronically on 8/22/17.

Site conditions were verified during inspections conducted on 7/19/17 and 8/17/17; the associated inspection reports document that post construction stormwater management practices are installed and the site is permanently stabilized.

No violations are cited in association with this administrative inspection. TLT

2640830 Primary Facility 2017-08-29 Routine/Complete Inspection No Violations Noted This well is listed as Regulatory Inactive Status. The well pad and well area are neat and clean. The well annulus ( 9 5/8" x 5 1/2" ) is vented to a small tank at the end of the well area. Bubbling was noted from the cellar of this well which had water to the top of the cellar. The bubbling appears to be coming from the vent pipe where it is plumbed to the annulus then to the small tank at the well area. Ed Grey, a company rep said he would contact me with a date as to when the cellar would be vacuumed out so access to the pipe would be possible to make a determination as to the cause of the bubbling and decide a course of action once this was done. A follow up inspection will be scheduled.
2838186 Primary Facility 2019-02-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this wells status was Regulatory Inactive Status. This inspection is for a status extension. At the time of this inspection this well has been drilled to total depth in 2011 but was not completed. This wells conductor, surface casing, intermediate and production strings (casings) are all vented together ( commingled) and are vented to a poly tank at the end of the row of wells. This poly tank has a vent and the vent was tested for combustible gas with an Altair 5 X Multi - Gas Meter that was calibrated on 2-4-19. The results of this testing was 100% LEL (lower explosion limit) and 45% METHANE. No violations were noted at this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2100733 649490 09/05/2012 2012-09-05 78.122 - Drillers Log not on site Administrative overdue well records

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
649490 288649 CACP - Consent Assessment of Civil Penalty Comply/Closed 2012-09-05 2012-09-05 $500.00 $500.00

For data sources see[7]