If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21804 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.765503,"lon":-77.933225,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Sweden Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 147735 | |
Farm/Lease Name: ARCH POT 5H | |
License Status: INACTIVE | |
Spud Date: | |
Permit Date: 2011-08-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.765503 | |
Longitude: -77.933225 |
Date | Event |
---|---|
2011-08-25 | New Permit Application |
2011-11-02 | Performed Spud Operation |
2011-12-08 | New Permit Application |
2012-02-06 | Drilling Completion |
2012-06-13 | DEVIATED |
2019-03-20 | Inactive Well Request Granted |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004797 | Primary Facility | 2011-09-22 | Routine/Complete Inspection | No Violations Noted | A routine site inspection was conducted at the Arch Pot pad on 9/22/2011 at 1247. The E&S plan, E&S controls and perimeter of the site were observed. The access road and associated rock lined ditches were installed. The cut and fill slopes adjacent to the road and pad were vegetated and stabilized. The pad was constructed and stable with three cellars installed at the time of this inspection. All erosion control BMPs specified on the plans appeared to be installed. No violations were cited during this inspection. MRN |
2044359 | Primary Facility | 2012-02-17 | Routine/Complete Inspection | No Violations Noted | |
2044692 | Primary Facility | 2012-02-21 | Follow-up Inspection | Pending | On Feb. 21, 2012 an inspection was conducted at the Arch Pot location in Sweden Township, Potter County. The purpose of this visit was to follow up on an inspection conducted on Feb. 17, 2012 were several issues resulting from poor housekeeping were observed. Samples of an unknown liquid were collected previously by another inspector from the pad surface and submitted for analysis. Violations are pending the results of this analysis. The issues noted in this inspections and the inspection conducted the Department on Feb. 17, 2012 indicate poor housekeeping procedures. The Department recommends you review your procedures regarding washing equipment prior to transporting it off-site to ensure it is in compliance with existing regulations. It is also a recommendation you review the protection the liner provides under the activity it is subjected to. |
2044836 | Primary Facility | 2012-02-17 | Complaint Inspection | Pending | drilling mud, grease, and cuttings on ground |
2049951 | Primary Facility | 2012-03-13 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | Violations were cited based on the results received for the sample collected 2/17/12 (0935 125). The pollutional material has been remediated. |
2165825 | Primary Facility | 2013-05-13 | Routine/Partial Inspection | No Violations Noted | An inpsection of the Arch POT pad in Sweden Township, Potter Co. was conducted on May 13, 2013. A 4H well is permitted , but not yet drilled and the 5H well has been drilled. The access road is stable and the slopes adjacent to the acces road are well vegetated. The slopes adjacent to the pad are well vegetated; the site is more than 70% vegetated at this time. No new violations were cited during this inspection. |
2361824 | Primary Facility | 2015-04-15 | Routine/Complete Inspection | No Violations Noted | |
2453865 | Primary Facility | 2016-02-26 | Routine/Complete Inspection | No Violations Noted | Routine inspection. 5H well was drilled from 11/3/11 - 2/6/12. The 4H well has not been drilled. The 4H permit was renewed on 3/19/15. Interim restoration of the site has not been completed. Site is permanently stabilized and no temporary E&S controls remain. TLT |
2553559 | Primary Facility | 2017-01-19 | Routine/Complete Inspection | No Violations Noted | |
2642821 | Primary Facility | 2017-10-02 | Routine/Complete Inspection | No Violations Noted | On 10/2/17 at 1319 hrs I conducted a routine inspection of the Arch well site. It was sunny and 70 degrees F. No one was present during the inspection.
The site, which consists of the access road and a 300' x 400' well pad, was idle. The 5H well has been drilled and was placed on inactive status on 3/26/14. An ESCGP-2 (ESG29-105-17-0007) was issued on 7/27/17; this replaces the original ESCGP-1 (ESX11-105-0006), issued on 7/5/11, which authorized construction of the existing well pad. Chesapeake submitted a two-year extension request to the restoration requirements on 6/20/16. E&S controls are in place and the site is permanently stabilized. New flagging, stakes and silt sock were present in locations where infiltration BMPs are to be installed. In total, six infiltration areas will be constructed-four along the access road and two adjacent to the well pad. No violations were cited during this inspection. I concluded the inspection at 1505 hrs. TLT |
2843599 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was not in production. The well is in Regulatory Inactive Status and this inspection was done because of a Regulatory Inactive Status extension application requested by the operator. Well has two (2) annulus vents that are vented to surface and are identified by tags indicating the annulus size. A gauge on the top of the well head assembly indicated a psi (pounds per square inch) of 0. Each annulus vent also has a pressure gauge on the vent and both gauges indicated a pressure of 0. No violations noted at this inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2049951 | 634043 | 03/13/2012 | 2012-03-13 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
2049951 | 634045 | 03/13/2012 | 2012-03-13 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | |
2049951 | 634046 | 03/13/2012 | 2012-03-13 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[6]