If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21864 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.800212,"lon":-77.959567,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Sweden Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: 153661 | |
Farm/Lease Name: REESE HOLLOW 117 1HU | |
License Status: | |
Spud Date: | |
Permit Date: 2016-05-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.800212 | |
Longitude: -77.959567 |
Date | Event |
---|---|
2016-05-06 | New Permit Application |
2016-07-23 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-21 | 2017-06-30 | 10,945 | 15,557,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KFR-23 | Keane | Friction Reducer | Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00161188 | 2398.42 |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 45 | 0.0362672 | 53964.4 | ||||
oleic acid diethanolamide | 93-83-4 | 2 | 0.00161188 | 2398.42 | ||||
copolymer of 2-propenamide | Proprietary | 10 | 0.00805939 | 11992.1 | ||||
KAI-12 | Keane | Acid Inhibitor | Fatty imidazoline | 61790-69-0 | 5 | 0.00008093 | 120.418 | |
isoproyl alcohol | 67-63-0 | 5 | 0.00008093 | 120.418 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001619 | 24.084 | ||||
Methanol | 67-56-1 | 90 | 0.00145671 | 2167.53 | ||||
xylene | 1330-20-7 | 5 | 0.00008093 | 120.418 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00008093 | 120.418 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00008093 | 120.418 | ||||
Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.2521 | 129,828,000.0 | |
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 11.9039 | 17,712,600.0 | |
Hydrochloric Acid (7.5%) | Keane | Acid Inhibitor | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0568894 | 84649.5 | |
Water | 7732-18-5 | 92.5 | 0.701636 | 1,044,010.0 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | ethylbenzene | 100-41-4 | 1 | 0.00001619 | 24.084 | |
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00008093 | 120.418 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00008093 | 120.418 | ||||
xylene | 1330-20-7 | 5 | 0.00008093 | 120.418 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00008093 | 120.418 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00008093 | 120.418 | ||||
oleic acid diethanolamide | 93-83-4 | 2 | 0.00161188 | 2398.42 | ||||
copolymer of 2-propenamide | Proprietary | 10 | 0.00805939 | 11992.1 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00161188 | 2398.42 | ||||
Water | 7732-18-5 | 92.5 | 0.701636 | 1,044,010.0 | ||||
Citric acid | 77-92-9 | 40 | 0.00131235 | 1952.73 | ||||
KFEAC-30 | Keane | Iron Control | acetic acid | 64-19-7 | 60 | 0.00196852 | 2929.09 | |
Citric acid | 77-92-9 | 40 | 0.00131235 | 1952.73 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | JKLM ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | JKLM ENERGY LLC | 381,561.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2018 | JKLM ENERGY LLC | 1,957,850.00 | 318 | 0.00 | 0 | 0.00 | 0 |
2019 | JKLM ENERGY LLC | 1,243,434.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 127.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | JKLM ENERGY LLC | Produced Fluid | 26.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | JKLM ENERGY LLC | Drill Cuttings | 1,585.75 Tons | LANDFILL | 301358 |
2016 | JKLM ENERGY LLC | Produced Fluid | 352.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 2,435.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | JKLM ENERGY LLC | Drilling Fluid Waste | 668.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 380.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 116.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 2,334.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Produced Fluid | 56.73 Tons | LANDFILL | 301358 |
2017 | JKLM ENERGY LLC | Produced Fluid | 128.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2017 | JKLM ENERGY LLC | Produced Fluid | 24,964.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 1,435.75 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Drilling Fluid Waste | 1,456.50 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Drill Cuttings | 569.50 Tons | LANDFILL | 301358 |
2017 | JKLM ENERGY LLC | Synthetic Liner Materials | 37.75 Tons | LANDFILL | 301358 |
2017 | JKLM ENERGY LLC | Produced Fluid | 4,822.50 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Produced Fluid | 208.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | JKLM ENERGY LLC | Produced Fluid | 8,072.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | JKLM ENERGY LLC | Produced Fluid | 19,737.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 361.07 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Produced Fluid | 12,428.44 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | JKLM ENERGY LLC | Produced Fluid | 111.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | JKLM ENERGY LLC | Produced Fluid | 656.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | JKLM ENERGY LLC | Produced Fluid | 2,045.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | JKLM ENERGY LLC | Produced Fluid | 219.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | JKLM ENERGY LLC | Produced Fluid | 714.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | JKLM ENERGY LLC | Produced Fluid | 4.11 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Waste Water Treatment Sludge | 3.23 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Produced Fluid | 2,643.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | JKLM ENERGY LLC | Synthetic Liner Materials | 10.09 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,912.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | JKLM ENERGY LLC | Produced Fluid | 690.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | JKLM ENERGY LLC | Synthetic Liner Materials | 3.13 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 17.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | JKLM ENERGY LLC | Produced Fluid | 124.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | JKLM ENERGY LLC | Waste Water Treatment Sludge | 57.84 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,418.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | JKLM ENERGY LLC | Produced Fluid | 262.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | JKLM ENERGY LLC | Produced Fluid | 702.50 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 550.00 Bbl | REUSE (AT WELL PAD) | |
2019 | JKLM ENERGY LLC | Produced Fluid | 892.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2492243 | Primary Facility | 2016-06-10 | Routine/Partial Inspection | No Violations Noted | Preconstruction meeting for the Reese Hollow 117 well site. JKLM, New Growth Resources and J.L. Watts were present. New Growth Resources will be conducting logging/chipping operations and J.L. Watts is the construction contractor. The site will consist of improvement of a 6,000' pre-existing access road, a 350' x 500' well pad and two sediment traps. Four wells have been permitted (Reese Hollow 117 1HU - 4HU). Logging operations are anticipated to begin in the near term. TLT |
2504106 | Primary Facility | 2016-07-22 | Preoperation Inspection | No Violations Noted | Pre-spud inspection. Drainage controls in place. Soil temporarily stabilized. |
2513826 | Primary Facility | 2016-08-25 | Routine/Complete Inspection | No Violations Noted | |
2548296 | Primary Facility | 2016-12-29 | Routine/Partial Inspection | No Violations Noted | Partial inspection. Site was snow covered. The H&P 500 rig was drilling the 1HU well and will move onto the 4HU well next. The 2HU and 3HU wells have been drilled to total depth. Equipment and materials were staged on containment. Housekeeping appeared to be good. No violations noted during the inspection. TLT |
2561586 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | |
2601557 | Primary Facility | 2017-05-17 | Routine/Complete Inspection | No Violations Noted | |
2613301 | Primary Facility | 2017-06-06 | Routine/Complete Inspection | No Violations Noted | |
2613336 | Primary Facility | 2017-06-20 | Routine/Complete Inspection | No Violations Noted | |
2626404 | Primary Facility | 2017-08-10 | Routine/Complete Inspection | No Violations Noted | |
2633254 | Primary Facility | 2017-08-22 | Routine/Complete Inspection | No Violations Noted | 20x13 vented/conductor x surface = 0 LEL and 0 METHANE/volume
13x9 vented/ intermediate x surface = 0 LEL and 0 METHANE/ volume 9x5 vented / intermediate x production = 12 LEL and 0 METHANE/ volume |
2705622 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. All annulus vents , flow lines, and fittings were tested for gas . Results of this testing was that no gas was detected on the wellhead assembly or the well area. |
2721123 | Primary Facility | 2018-04-19 | Routine/Complete Inspection | No Violations Noted | Minimal activity on site when I arrived. I met Sean Bacha, production consultant for JKLM. AST present on the site, filled to within 8-10' of the top. Secondary tank contained little to no water. Puddles on the pad and around the tank showed conductance from .19-.38 mS/cm. Puddles immediately in front of the offloading area for the tank were slightly higher (.85-2.15 mS/cm). A bank of Baker tanks was also present on the site; Sean informed me that the produced water from the pad had been going to SWEPI, but at present they are not taking any. Overall, site looked good; however, I was unable to locate any well tags on the wells. I recommend that tags be affixed ASAP, or if they were present, that they be made more visible and obvious. |
2742322 | Primary Facility | 2018-06-14 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 117 on 6/14/2018 @1245 hours. The weather was 70 degrees, 38% humidity, winds WNW 20 mph. The well site is currently in production.
The site was last inspected by company personnel on 6/14/2018 with the comment “elevated conductivity readings recorded in two areas outside of containment.” A puddle was observed along the edge of containment in front of the AST load/offload area. The puddle had a field measured conductivity of 2.9 -3.5 mS/cm (see photo #2). Fluid inside the larger containment was measured at 9.04 mS/cm (photo #3) and “Or” in the smaller duck pond containment (photo #4 and #5). A smaller duck pond containment was laying adjacent to the AST with a field measured conductivity of “Or” or over range (photo #7). A puddle was observed on the pad surface in front of the tank battery with a field measured conductivity of 3.73mS/cm (photo #9 and #10). A vac truck driver was located onsite. I informed him of the areas with elevated cond |
2746432 | Primary Facility | 2018-06-27 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. No violations were noted at the time of this inspection. |
2765801 | Primary Facility | 2018-08-20 | Routine/Complete Inspection | No Violations Noted | I arrived on the site and met Sean Bacha, consultant for JKLM. Little activity was occurring on the pad. Puddles around the offloading area for the MASS showed low conductance (.53-.75 mS/cm); water in the containment itself was slightly higher (.87 mS/cm), and was within 2-3" of the top of the berm. A vac truck was already on location, and Sean informed me that it would be vaccing this containment. The MASS was fairly full, with approximately 3-3 1/2' of freeboard, and the secondary containment had no standing water. On the remainder of the pad, all puddles showed low conductance (.33-.68 mS/cm). |
2768248 | Primary Facility | 2018-08-28 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. A digital gauge on the 3" production line leaving the well head assembly and going to the production equipment read 1039 psi (pounds per square inch) at this inspection. No violations noted at this inspection. |
2803135 | Primary Facility | 2018-11-14 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. Annulus vent surface x intermediate (20" x 13 3/8") was noted venting 100% LEL (lower explosion limit) and 7% METHANE at this inspection. No other annulus vents were noted venting at this inspection. Combustible gas detected at this annulus indicates potential defective cement. JKLM should monitor this annulus on a monthly basis and report any significant changes to the Department as soon as possible. The Department will continue to monitor all annulus vents at this well during future inspections. No violations noted at the time of this inspection. |
2814173 | Primary Facility | 2018-12-11 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection conducted a routine inspection of the JKLM Reese Hollow 117 Well pad located in Sweden Twp, Potter Co on 12/11/2018 @1245 hours. The weather was 25 degrees, parlty sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. Sean Bacha, JKLM representative was present onsite during the inspection.
The well site appears to be setup for production. Four wells are listed as in "active" status. The Aboveground Storage Tank (AST) appears to have been removed. A large pile of gravel was observed in it's place. Mr. Bacha stated the waste containers staged onsite are from the removal of the AST. The secondary containment around the production tanks and the tank battery were inspected. No staining or puddles were observed on the ground surface. No fluid was observed in the secondary containment. The onsite E&S inspection log states the site was last inspected on 12/7/2018. No violations are noted at this time. I departed the site at 1415. |
For data sources see[8]