Well ID: 37-105-21880 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.837188,"lon":-77.731925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Ulysses Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: 153961 | |
Farm/Lease Name: HEADWATERS 145 6HU | |
License Status: Active | |
Spud Date: 2017-02-14 | |
Permit Date: 2016-10-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.837188 | |
Longitude: -77.731925 |
Date | Event |
---|---|
2016-10-18 | New Permit Application |
2017-02-11 | Performed Spud Operation |
2017-08-30 | Drilling Completion |
2018-03-05 | Perforation |
2018-03-06 | Perforation |
2018-03-07 | Perforation |
2018-03-09 | Perforation |
2018-03-10 | Perforation |
2018-03-11 | Perforation |
2018-03-17 | Perforation |
2019-07-23 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-05 | 2018-03-12 | 11,249 | 4,739,530 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFRC 2200 | U.S. Well Services, LLC | Friction Reducer | Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00564563 | 2650.71 |
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30 | 0.0338738 | 15904.2 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Formic acid | 64-18-6 | 20 | 0.00004301 | 20.195 | |
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00001075 | 5.049 | ||||
Polyether | 60828-78-6 | 10 | 0.00002151 | 10.097 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00004301 | 20.195 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00004301 | 20.195 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00008602 | 40.39 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 14.6492 | 6,878,040.0 | |
In-situcide Promoter | Silver Creek Services | Biocide | Hypochlorous Acid, Sodium Salt | 7681-52-9 | 12.5 | 0.0021435 | 1006.41 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Phosphino carboxylic acid polymer | 71050-62-9 | 20 | 0.00126193 | 592.495 | |
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 5 | 0.00564563 | 2650.71 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00004301 | 20.195 | ||||
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) | 34690-00-1 | 20 | 0.00126193 | 592.495 | ||||
Polyethelene glycol | 25322-68-3 | 50 | 0.00008887 | 41.725 | ||||
Formic acid | 64-18-6 | 20 | 0.00004301 | 20.195 | ||||
Polyether | 60828-78-6 | 10 | 0.00002151 | 10.097 | ||||
Water | 7732-18-5 | 95 | 0.926479 | 434996 | ||||
Water | 7732-18-5 | 30 | 0.00005332 | 25.035 | ||||
DETA phosphonate | 15827-60-8 | 20 | 0.00126193 | 592.495 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00001075 | 5.049 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 30 | 0.0018929 | 888.743 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00004301 | 20.195 | ||||
HCL Acid (5% to 7.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 95 | 0.926479 | 434996 | |
Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0731431 | 34341.8 | ||||
Water | JKLM Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.2387 | 39,551,300.0 | |
K-BAC1020 | Silver Creek Services | Biocide | Polyethelene glycol | 25322-68-3 | 50 | 0.00008887 | 41.725 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.00003732 | 17.525 | ||||
Water | 7732-18-5 | 30 | 0.00005332 | 25.035 | ||||
SI-117LF | Silver Creek Services | Scale Inhibitor | Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 30 | 0.0018929 | 888.743 | |
Ethylene glycol | 107-21-1 | 10 | 0.000630965 | 296.248 | ||||
DETA phosphonate | 15827-60-8 | 20 | 0.00126193 | 592.495 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 20 | 0.00126193 | 592.495 | ||||
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) | 34690-00-1 | 20 | 0.00126193 | 592.495 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | JKLM ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | JKLM ENERGY LLC | 1,056,503.00 | 187 | 0.00 | 0 | 0.00 | 0 |
2019 | JKLM ENERGY LLC | 626,296.00 | 331 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 1,595.00 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Synthetic Liner Materials | 42.33 Tons | LANDFILL | 301358 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Produced Fluid | 8.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Produced Fluid | 352.00 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Drill Cuttings | 1,710.00 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Produced Fluid | 719.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | JKLM ENERGY LLC | Produced Fluid | 44.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | JKLM ENERGY LLC | Produced Fluid | 761.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | JKLM ENERGY LLC | Produced Fluid | 3,822.00 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Produced Fluid | 20,076.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | JKLM ENERGY LLC | Synthetic Liner Materials | 13.80 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Produced Fluid | 66.31 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Produced Fluid | 22,159.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 32.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | JKLM ENERGY LLC | Produced Fluid | 4,598.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | JKLM ENERGY LLC | Produced Fluid | 21.67 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
2019 | JKLM ENERGY LLC | Produced Fluid | 34.17 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | JKLM ENERGY LLC | Produced Fluid | 2,025.52 Bbl | REUSE (AT WELL PAD) | |
2019 | JKLM ENERGY LLC | Produced Fluid | 3,922.34 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,695.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | JKLM ENERGY LLC | Produced Fluid | 61.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,185.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | JKLM ENERGY LLC | Soil Contaminated by Oil | 1.52 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,002.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24099 |
2019 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 16.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | JKLM ENERGY LLC | Produced Fluid | 197.50 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | JKLM ENERGY LLC | Produced Fluid | 188.33 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | JKLM ENERGY LLC | Soil Contaminated by Oil & Gas Related Spills | 1.52 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 5.13 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Synthetic Liner Materials | 11.22 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,439.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2525114 | Primary Facility | 2016-10-04 | Preoperation Inspection | No Violations Noted | The Department of Environmental Protection attended a preconstruction meeting for the JKLM Headwaters 145 Pad (ESG29-105-15-0007), located in Ulysses Township, Tioga Co on 10/4/2016 @ 1100 hours. Present for the meeting were myself; Adam Blint, JKLM Land Manager; John Watts, J.L. Watts excavating; Jim Fowler and Al Pence, New Growth Resources. The weather was 65° partly sunny.
The Headwaters 145 Pad is an unconventional well site that will be constructed southeast of the existing Headwaters 143 well site. The permit also encompasses a natural gas gathering line that will connect the HW 145 to the HW 143 well site. As of today’s meeting, the 6 unconventional well permits submitted for the HW 145 pad do not show an issuance date in eFACTS. JKLM must have a valid well permit in hand before earth disturbance activities can commence. The start date for the project has not been scheduled at this time. Please contact the WQS when a valid well permit has been issued and a start date for the project has been schedul |
2547834 | Primary Facility | 2016-12-27 | Preoperation Inspection | No Violations Noted | The Department of Environmental Protection conducted a pre-spud inspection at the JKLM Headwaters 145 Pad (ESG29-105-15-0007), located in Ulysses Township, Tioga Co on 12/27/2016 @ 1300 hours. The weather was 35°, sun/clouds, snow and ice on the ground melting rapidly. A site ID sign was observed at the entrance to the access road. A copy of the well permits, E&S plan and E&S inspection log was located in the mailbox onsite. The site was last inspected by company personnel on 12/14/2016 with the following comments “Access road and location being constructed. Signs in place, permits in box, MRP in box. Snow covered. No flowing or standing water. Access and location culverts being installed.”
The Headwaters 145 Pad is an unconventional well site that will be constructed southeast of the existing Headwaters 143 well site. The permit also encompasses a natural gas gathering line that will connect the HW 145 to the HW 143 well site. As of today’s inspection perimeter BMP’s consist of chipped material berms. The |
2564379 | Primary Facility | 2017-02-23 | Routine/Complete Inspection | No Violations Noted | |
2573341 | Primary Facility | 2017-03-20 | Routine/Complete Inspection | No Violations Noted | The DEP inspected the JKLM Headwaters 145 well site on 3/20/2017 @ 1100 hours. Ron Burdick was the company rep onsite for JKLM. The HAD rig is currently onsite to drill the top hole portions of the 1HU-6HU wells. The rig has completed the drilling on the 1HU well and has skidded over onto the 2HU well. They were rigging up and preparing to drill on the 2HU at the time of this inspection. Mr. Burdick stated The HAD rig should be onsite until mid April. JKLM plans to bring the H&P 500 rig on location mid-Sept. to drill the horizontal portions of the wells. No violations are noted at this time. I departed the site at 1345 hours. |
2580110 | Primary Facility | 2017-04-06 | Routine/Complete Inspection | No Violations Noted | |
2590687 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | |
2609609 | Primary Facility | 2017-06-14 | Routine/Complete Inspection | No Violations Noted | |
2626460 | Primary Facility | 2017-08-01 | Drilling/Alteration | No Violations Noted | |
2635141 | Primary Facility | 2017-09-07 | Routine/Complete Inspection | No Violations Noted | I met John Manuel of JKLM when I arrived. H&P Flex Rig 500 on location, drilling at 6500' on the 5HU well. Containments were in good condition, and chemical storage areas were clean. Permit numbers were posted at site entrance. |
2658644 | Primary Facility | 2017-11-07 | Routine/Complete Inspection | No Violations Noted | A routine inspection of the of the JKLM Headwaters 145 well pad was conducted on 11/7/2017 @ 1330 hours. The weather was 32 degrees and snowing. JKLM is in the process of drilling the 3HU well. The rig was at a depth of 11,517' at the time of this inspection. The 4HU, 5HU and 6HU wells were drilled between 9/2/2017 10/19/2017. The 1HU and the 2HU have yet to be drilled. Mr. Joe Huston and Mr. Tyler Regan were present onsite during the inspection.
Fluid with an elevated conductivity was discovered in the NW corner of the rig containment below the rig mats. The field conductivity was measured between 3-4.5 mS/cm using an Oakton Multi-parameter PCSTesr 35. Mr. Huston and Mr. Regan were advised to remove the fluid with a vac truck as soon as possible. No elevated readings were detected outside of containment. The source of the fluid was not determined. No other accumulated fluid was found within the perimeter of the rig containment. Additional E&S control along the access road may be needed to prevent sedime |
2663121 | Primary Facility | 2017-11-21 | Drilling/Alteration | No Violations Noted | This well was already drilled at the time of this inspection. Drilling was started on 7/25/17 and completed on 9/1/17. No issues or problems were reported during the drilling of this well. |
2667421 | Primary Facility | 2017-12-05 | Routine/Complete Inspection | No Violations Noted | Weather is 38 Deg. F., rainy and cloudy at time of inspection. Routine inspection of JKLM LLC, Headwaters 145 Pad on December, 5 2017.
There are total of 6 wells on location. Currently advancing 5-1/2" production casing on the 2HU well. The 1HU has not been drilled to completion as of this inspection. Drilled wells on location: 6HU drilling started on 07/25/17 and finished on 09/01/17; 5HU drilling started on 09/02/17 and finished on 09/29/17; 4HU drilling started on 09/30/17 and finished on 10/19/17; 3HU drilling started on 10/20/17 and finished on 11/16/17. We physically inspected the pad and the rig. The pad was looking neat and well organized. At the time of this inspection the 6HU drilling has been completed. DEP representatives - Ulyana Trynovich and Lester Taylor. JKLM representative - Travis Houston - Drilling Consultant and Joe Ziemba - Drilling Consultant. |
2692021 | Primary Facility | 2018-02-06 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection hydraulic fracturing had not yet started on this well. Prep and set up were ongoing at the time of this inspection. |
2704877 | Primary Facility | 2018-03-13 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection Scott West was present. This well was complete at this time |
2714882 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | I arrived onsite with Elizabeth Niles, WQS and met Scott West of JKLM. A coil tubing rig was on location; Scott informed us that they had finished drilling out plugs on the 6H and shut it in, and had just moved over to the 5H to begin drilling plugs on that well. Recent heavy rain had accumulated in containments and on the pad surface. Although the water in containment showed varied conductance (.60-11.1 mS/cm), puddles on the pad were consistently in the 2.2-3.1 mS/cm range. We noted a containment near the AST that had 20-40 gallons on fluid with elevated conductance (10.5 mS/cm); although water on the pad in proximity shower low conductance (.5-1.1 mS/cm), we did note that the containment had been constructed without a corner berm, and the liner had sagged into the corner. This created a potential path for this water to leave containment; I strongly recommend that JKLM utilize these corner berms, as it was exactly this type of berm construction that caused a release on the Reese Hollow 115 pad recentl |
2715768 | Primary Facility | 2018-04-03 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection the hydraulic fracturing on this well was complete . A coil tubing company was on location setting up to clean out the wells after the plugs were drilled out. |
2720045 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection the hydraulic fracturing and the coil tubing has been completed. The well was being set up for production. |
2731604 | Primary Facility | 2018-05-18 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of the JKLM Headwaters 145 well pad located in Ulysses Twp., Potter Co. on 5/17/18 @1100 hours. The weather was 72 degrees and sunny.
Due to recent rain events the pad surface was muddy with numerous puddles. Field Conductivity on the pad surface was screened and found to vary between 400 µS/cm – 4 mS/cm. The puddles exhibiting elevated conductivity were mostly located on the NE quadrant of the pad (see attached pictures). It is recommended the puddles exhibiting elevated conductivity be removed with a vac truck. The puddles around the AST were with in normal range. Activity onsite consisted of installation of separators, production tanks and well tags. The site was last inspected by company personnel on 5/10/2018 with no issues noted. Containment around the well heads appeared intact and in good shape. Waste Management containers were located in the eastern corner of the pad and were tarped. Sediment traps appeared dry and not discharging. Additional silt sock has |
2748777 | Primary Facility | 2018-07-02 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. Combustable gas was detected on the 9 5/8" x 13 3/8" annulus at this inspection. After a conversation with Jake Long (Engineer for JKLM) he informed me that this was not uncommon directly after flow back( a process of cleaning out the wells of hydraulic fracturing fluids). The cleaning out of the wells is under high pressure and temperatures during this process. On going monitoring will be conducted by JKLM until the wells have stabilized after the flow back process is completed and for an unspecified time there after. |
2803545 | Primary Facility | 2018-11-15 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. Annulus vent intermediate two (2) x intermediate one (1) (13 3/8" x 9 5/8" ) was noted venting 72%LEL (lower explosion limit) and 0% METHNE combustible gas at this inspection. Although the Intermediate 2 casing was not cemented to surface under an approved alternate method, combustible gas detected at this annulus indicates potential defective cement. JKLM should monitor combustible gas levels at this annulus on a monthly basis and report any significant changes to the Department as soon as possible. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection. |
2838391 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was in production. A gauge on the production/ flow line indicated a psi (pounds per square inch) of 1500. The 9" x 5" (intermediate x production) casing string is connected by a flexible approximate 2" vent line that is connected to the same size annulus on the other 5 wells on this well pad on all 6 vent into a poly vent tank at the end of the row of wells. No violations were noted at this inspection. |
2840284 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of the JKLM Headwaters 145 well pad located in Ulysses Twp, Potter Co. on /2/14/2019 @1145 hours. The weather was mostly sunny, 29 degrees, winds SSW @10mph, humidity 48%. Onsite activity consists of 6 wells that appear to be in production. An Above-ground Storage Tank (AST) was observed ~60% full of impaired fluid.
Poly tanks onsite, in containment, do not appear to be in use and are not labeled. No violations are noted at this time. I departed the site 1230 hours. |