If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21924 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.857329,"lon":-77.73506,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Ulysses Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: 154230 | |
Farm/Lease Name: HEADWATERS 146-3HU | |
License Status: | |
Spud Date: | |
Permit Date: 2018-07-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.857329 | |
Longitude: -77.735060 |
Date | Event |
---|---|
2018-07-26 | New Permit Application |
2018-10-03 | Performed Spud Operation |
2019-01-14 | MOD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | JKLM ENERGY LLC | 391,030.00 | 37 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | JKLM ENERGY LLC | Produced Fluid | 52.50 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Drill Cuttings | 622.91 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,854.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | JKLM ENERGY LLC | Produced Fluid | 525.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | JKLM ENERGY LLC | Soil Contaminated by Oil & Gas Related Spills | 27.11 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 7,857.50 Bbl | REUSE (AT WELL PAD) | |
2019 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 398.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | JKLM ENERGY LLC | Produced Fluid | 465.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 535.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | JKLM ENERGY LLC | Produced Fluid | 461.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | JKLM ENERGY LLC | Soil Contaminated by Oil | 27.11 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Drill Cuttings | 713.66 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 520.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | JKLM ENERGY LLC | Waste Water Treatment Sludge | 31.60 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Synthetic Liner Materials | 27.32 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 4,570.00 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2751570 | Primary Facility | 2018-07-02 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of the JKLM headwaters 146 well pad located in you Ulysses Township, Potter County on July 2, 2018 at 1115 hrs. The weather was 85 degrees, sunny, humidity 58%, winds SSW 10 mph.
The access road to the well pad is 9700 feet long. The most of the rock-lined ditch, along the access road, appears to be installed. JL Watts was observed spreading topsoil and working on completing the access road. E.J. Breneman LP was soil cementing the pad surface. Sediment Trap 1 (ST-1) was observed off the southwest pad corner and Sediment Trap 2 (ST-2) was observed off the southeast pad corner. Sumps will be installed in the southeast and southwest corners after completion of the pad surface. Ditches surrounding the pad surface are rough graded and draining to the installed sediment traps. Topsoil will need to be laid before the TRM matting can be installed, and the ditches completed. The topsoil stockpile adjacent to the pad was observed stabilized with mulch. New Growth Resources p |
2756277 | Primary Facility | 2018-07-25 | Preoperation Inspection | No Violations Noted | The DEP conducted a routine inspection of the JKLM headwaters 146 well pad located in you Ulysses Township, Potter County on July 2, 2018 at 1145 hrs. The weather was 85 degrees, sunny, humidity 58%, winds SSW 10 mph.
The access road to the well pad is 9700 feet long. The most of the rock-lined ditch, along the access road, appears to be installed. JL Watts was observed spreading topsoil and working on completing the access road. E.J. Breneman LP was soil cementing the pad surface. Sediment Trap 1 (ST-1) was observed off the southwest pad corner and Sediment Trap 2 (ST-2) was observed off the southeast pad corner. Sumps will be installed in the southeast and southwest corners after completion of the pad surface. Ditches surrounding the pad surface are rough graded and draining to the installed sediment traps. Topsoil will need to be laid before the TRM matting can be installed, and the ditches completed. The topsoil stockpile adjacent to the pad was observed stabilized with mulch. New Growth Resources p |
2756317 | Primary Facility | 2018-07-25 | Preoperation Inspection | No Violations Noted | The DEP conducted a PREOP inspection of the JKLM – Headwaters 146 well pad located in Ulysses Twp, Potter Co. on 7/25/2018 @1230 hours. The weather was 72 degrees, light rain, Humidity 86%, winds SSW 6mph. Potter County has received approximately 6 inches of rain since Sunday, 7/22/2018. JKLM has just completed construction of the HW 146 well pad and requested a Pre-spud inspection. John Watts, JL Watts (contractor) and Jeff Long, JKLM were present onsite.
The site consists of a minor road crossing (GP-07-5329-17-001) of Cushing hollow at the base of the access road. The access road then travels ~9700 feet up to the top of the ridge where a 350’ x 500’ well pad has been constructed with two sediment traps. ST-1 is located beyond the southwest pad corner and ST-2 is off the southeast pad corner. The permit also covers 5,560 feet of gathering pipeline which connects the HW 146 well pad to the HW 143 well pad. The ROW has been cut at this time, but not grubbed. The original plan was to HDD the pipeline under |
2817664 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM Headwaters 146 well pad located in Ulysses Twp, Potter Co. on 1213/2018 @1330 hours. The weather was 29 degrees, overcast, 2-4" of snow on the ground, winds SSE@8mph, humidity 89%.
JKLM Company man Ron Burdick was present onsite for the inspection. Onsite activity consisted of the falcon rig "batch drilling" two wells onsite. The rig is currently drilling the 1st intermediate string casing of the 2HU well at a depth of 1,491'. The containment around the rig and berms appeared to be intact and functional. No staining or melted areas were observed around the perimeter of the containment. No violations are noted at this time. I departed the site at 1500 hours. |
2822972 | Primary Facility | 2019-01-07 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was vertical drilled only. The conductor casing that is 20" x 120' was set on 10-4-18 thru 10-5-18. The surface casing that is 13 3/8" x 559' was set on 11-18-18 thru 12-9-18. The 1st intermediate that is 10 3/4" x 2621' was set on 11-25-18. The 2nd intermediate that is 7 5/8" x 8428' was set on 12-7-18. No violations were noted at this inspection. |
2848263 | Primary Facility | 2019-03-04 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was top holed only ( vertically drilled ). Well has not been laterally drilled. The conductor that is 20" in diameter by 120' in length was drilled and set starting on 10-4-18 and completed on 10-5-18. The surface casing that is 13 3/8" diameter and 559' in length was completed on 11-20-18. The 1st intermediate that is 10 3/4" in diameter and 2,624' in length was completed on 11-27-18. The 2nd intermediate that is 7 5/8" in diameter and 8,429' in length was completed on 12-8-18. The conductor by surface casing is the only annulus vent that is vented to surface. The other annulus have vent valves attached but are not vented outside of the casing. No violations noted at this inspection. |
For data sources see[7]