37-115-20182

Well Details

Well ID: 37-115-20182
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 147805
Farm/Lease Name: BENSCOTER 1H
License Status:
Spud Date:
Permit Date: 2009-06-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.710945
Longitude: -76.083931

For data sources see[1][2][3]

Well History

Date Event
2009-06-30 New Permit Application
2009-07-18 Performed Spud Operation
2009-08-20 Drilling Completion
2009-12-27 Perforation
2009-12-27 Performed Stimulation
2011-01-25 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-12-27 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2010 CHESAPEAKE APPALACHIA LLC 1,315,472.00 269 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 973,287.00 363 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 602,706.00 361 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 484,565.00 365 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 498,317.00 365 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 116,719.00 210 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 547,887.00 335 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 335,339.00 325 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 299,275.00 355 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 262,196.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 1,780.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 551.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 262.90 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 310.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 254.38 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 42.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 52.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 54.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 106.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 108.50 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.50 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 47.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 0.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1815065 Primary Facility 2009-07-22 Follow-up Inspection No Violations Noted On July 21, a call was received from Chesapeake with a report of fluid seeping out of the bank of the reserve pit. Chesapeake collected samples of the fluid which was reported to visibly be clear and odorless, and was likely groundwater seeping below the pit liner. As a precaution, the fluid was pumped out of the pit to determine if there was a tear in the pit liner.
1819287 Primary Facility 2009-08-07 Follow-up Inspection No Violations Noted At time of inspection, I met with Company Man Bill Canon. The drilling rig on site is Nomac Rig 112. Mr. Canon indicated that drilling depth was at 5997¿ which is the approximate depth of the horizontal kickoff point. Drilling was being performed using air. Mr. Canon provided the charts of the BOP tests. Based on a review of the charts, it appeared that the appropriate tests were performed and the BOP is in working condition. During an inspection of the well pad, I observed some drilling mud on the pad surface near the base of the substructure next to the water tank. There was also an excessive amount of drilling mud on the pad between the substructure and the shaker units. I notified Mr. Canon of the areas of concern, and requested the mud to be cleaned up, and to implement some measures to keep the site as clean as possible and prevent further spills of this nature.
2002267 Primary Facility 2011-08-30 Routine/Complete Inspection No Violations Noted Witnessed setup of 48 hour shut in pressure builld up tests on surface casing. 2 String well. 3.23# psi on 9 5/8. 1200 psi on production string.
2415777 Primary Facility 2015-10-15 Routine/Complete Inspection No Violations Noted
2712138 Primary Facility 2018-03-29 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection on the Benscoter well pad on March 29, 2018. The well pad was stable as was the access road. The cut and fill slopes as well as the infiltration basin were all well vegetated. The wells were properly and clearly labeled. The wells associated with this site are as follows: 115-20068, 115-20182.

There were no erosional issues apparent.

There were no violations noted.

For data sources see[8]