If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20256 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.650756,"lon":-76.042531,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148546 | |
Farm/Lease Name: HOLTAN 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-12-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.650756 | |
Longitude: -76.042531 |
Date | Event |
---|---|
2009-12-17 | New Permit Application |
2010-06-01 | Performed Spud Operation |
2010-08-10 | Drilling Completion |
2010-09-03 | Perforation |
2010-09-03 | Performed Stimulation |
2011-12-09 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-09-03 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 613,958.00 | 84 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 3,094,596.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 3,488,312.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 2,422,168.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 1,219,644.00 | 296 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 1,454,272.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 1,166,276.00 | 340 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,071,846.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 904,729.00 | 356 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 9,024.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 292.20 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 564.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 51.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 527.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 198.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 257.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 55.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1900336 | Primary Facility | 2010-07-22 | Drilling/Alteration | No Violations Noted | Patterson 259. Schlumberger completed cement job on July 19th on 9 5" surface string. Bumpedd plug at 12:41 am on 7/20. Report showed 4 bbls return of good cement to surface. Drillers log on site and up to date. |
2100264 | Primary Facility | 2012-09-17 | Routine/Complete Inspection | Pending | The site is currently in production. There was no activity occurring at the site during the inspection. I reviewed the on-site E & S Plan, the weekly/post-storm inspection reports, and the current conditions of the site. |
2405180 | Primary Facility | 2015-09-08 | Routine/Partial Inspection | No Violations Noted | |
2713302 | Primary Facility | 2018-04-02 | Routine/Complete Inspection | No Violations Noted | I inspected the Holtan well site on April 2, 2018. The access road and pad surface were solid and stable, despite the recent snowfall. The cut slope was rocky and stable. The fill slope was vegetated to the point of even having woody vegetation present. There were no erosional issues observed.
The wells associated with this site are as follows: 115-20257 115-20256. There were no violations noted. |
For data sources see[8]