If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20426 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.708803,"lon":-76.014911,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 145475 | |
Farm/Lease Name: KIPAR 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.708803 | |
Longitude: -76.014911 |
Date | Event |
---|---|
2010-08-11 | New Permit Application |
2010-09-14 | Performed Spud Operation |
2010-10-31 | Drilling Completion |
2011-09-25 | Perforation |
2011-09-25 | Performed Stimulation |
2012-08-17 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-10-09 | 2011-10-09 | 7,377 | 6,154,848 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Carrier/Base Fluid | 76.57 | |||||
Biocide - Bactron K 139 | Champion Technologies | Antibacterial Agent | Ethanol | 64-17-5 | 5.00 | 0.00150000 | ||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10.00 | 0.00299000 | |||||
Glutaraldehyde | 111-30-8 | 5.00 | 0.00150000 | |||||
10.1 - 15 HCL | Frac Tech Services (FTS) | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.06 | ||
Water | 7732-18-5 | 85.00 | 0.36 | |||||
FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Agent | No Hazardous Components | 0.00 | ||||
Sand (Proppant) | Proppant | 13.23 | ||||||
Recycled Produced Water | Carrier/Base Fluid | 9.65 | ||||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No Hazardous Components | 0.00 | ||||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Corrosion Inhibitor | Quaternary Ammonium Compounds | 10.00 | 0.00010000 | |||
Organic Amineresin Salt | 30.00 | 0.00030000 | ||||||
Isopropanol | 67-63-0 | 60.00 | 0.00060000 | |||||
Aromatic Aldehyde | 10.00 | 0.00010000 | ||||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00010000 | |||||
Scale Inhibitor - Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10.00 | 0.00112000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-09-25 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 1,652,967.00 | 285 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 2,021,796.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 2,020,009.00 | 270 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 1,774,075.00 | 286 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 1,594,576.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 876,686.00 | 242 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,758,973.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 872,066.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,142.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 757.46 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 52.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 624.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 192.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 57.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 317.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 1.40 Tons | CENT WASTE TRT FAC NPDES | PAG034815 |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 1.40 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | PAG034815 |
2017 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 24.60 Tons | LANDFILL | 301626 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 288.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 54.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 406.80 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 0.50 Tons | LANDFILL | 8-0728-0004/013 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 2.60 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 1.80 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | PAG034815 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 315.30 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 83.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 67.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 18.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 1.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 1.80 Tons | CENT WASTE TRT FAC NPDES | PAG034815 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 4.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 345.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 17.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1918695 | Primary Facility | 2010-10-07 | Drilling/Alteration | No Violations Noted | Patterson 26 MIRU secondary plastic was torn around 4 of the corners and service company was there repairing plastic. reentered, Spud , hole w/ 17-1/2" Tricone . company man said they will try to use 40mm plastic on next well. And Gas block will be used in cement mixture. |
1926661 | Primary Facility | 2010-11-01 | Drilling/Alteration | No Violations Noted | TD 13339. Running 51/2 possibly 11-2-2010. Cement. |
1955202 | Primary Facility | 2011-03-03 | Routine/Complete Inspection | Violation(s) Noted | Water bubbling in cellar (3 string design). Uncontrolled release of gas. Brass vent on 13 3/8" annuli. Further investigation required. |
1964450 | Primary Facility | 2011-04-07 | Follow-up Inspection | Violation(s) Noted | Water bubbling in cellar. Uncontrolled release of gas. 3 string design. |
1966058 | Primary Facility | 2011-04-07 | Follow-up Inspection | No Violations Noted | Obtained isotopach sample. Constant bubbling in cellar around 13 3/8 and 20. |
2318024 | Primary Facility | 2014-10-29 | Drilling/Alteration | No Violations Noted | |
2417268 | Primary Facility | 2015-10-06 | Routine/Complete Inspection | No Violations Noted | |
2447916 | Primary Facility | 2016-02-09 | Routine/Complete Inspection | No Violations Noted | |
2478792 | Primary Facility | 2016-03-28 | Routine/Complete Inspection | No Violations Noted | |
2712658 | Primary Facility | 2018-03-30 | Routine/Complete Inspection | No Violations Noted | I inspected the Rylee and Kipar well pad on March 30, 2018. A RTNC inspection was performed. The access road was somewhat muddy due to an ongoing timber harvest and recent heavy rains, although all was still solid enough that no mud was being tracked off site. The cut and fill slopes of the Rylee pad were well vegetated and stable and the pad surface was muddy. The cut and fill slopes of the Kipar were stable and well vegetated and the pad was muddy as well. There were no erosional issues noted.
The wells associated with this site are as follows: 115-20424 115-20426 115-21851 115-21852 115-21853 115-21854 115-20592 115-20593 115-21702 115-21703 There were no violations observed. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1955202 | 606035 | 03/03/2011 | 2011-03-03 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
1964450 | 608446 | 04/07/2011 | 2011-04-07 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative |
For data sources see[9]