If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22127 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.89775,"lon":-75.699,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: New Milford Township | |
Operator Name: SWN PROD CO LLC | |
Well Pad ID: 150219 | |
Farm/Lease Name: HUMBERT III 2H | |
License Status: Active | |
Spud Date: 2017-10-17 | |
Permit Date: 2015-12-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.897750 | |
Longitude: -75.6990 |
Date | Event |
---|---|
2015-12-09 | New Permit Application |
2016-02-06 | Perforation |
2016-11-14 | Permit Renewal Application |
2017-10-16 | Performed Spud Operation |
2017-12-15 | Drilling Completion |
2018-02-02 | Perforation |
2018-02-02 | Performed Stage 1 of Stimulation |
2018-02-02 | Performed Stage 2 of Stimulation |
2018-02-02 | Performed Stage 3 of Stimulation |
2018-02-02 | Performed Stage 4 of Stimulation |
2018-02-03 | Perforation |
2018-02-03 | Performed Stage 5 of Stimulation |
2018-02-03 | Performed Stage 6 of Stimulation |
2018-02-03 | Performed Stage 7 of Stimulation |
2018-02-03 | Performed Stage 8 of Stimulation |
2018-02-04 | Perforation |
2018-02-04 | Performed Stage 10 of Stimulation |
2018-02-04 | Performed Stage 11 of Stimulation |
2018-02-04 | Performed Stage 12 of Stimulation |
2018-02-04 | Performed Stage 13 of Stimulation |
2018-02-04 | Performed Stage 9 of Stimulation |
2018-02-05 | Perforation |
2018-02-05 | Performed Stage 14 of Stimulation |
2018-02-05 | Performed Stage 15 of Stimulation |
2018-02-05 | Performed Stage 16 of Stimulation |
2018-02-05 | Performed Stage 17 of Stimulation |
2018-02-06 | Perforation |
2018-02-06 | Performed Stage 18 of Stimulation |
2018-02-06 | Performed Stage 19 of Stimulation |
2018-02-06 | Performed Stage 20 of Stimulation |
2018-02-06 | Performed Stage 21 of Stimulation |
2018-02-06 | Performed Stage 22 of Stimulation |
2018-02-06 | Performed Stage 23 of Stimulation |
2018-02-06 | Performed Stage 24 of Stimulation |
2018-02-07 | Perforation |
2018-02-07 | Performed Stage 25 of Stimulation |
2018-02-07 | Performed Stage 26 of Stimulation |
2019-01-17 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-02 | 2018-02-07 | 638 | 7,025,330 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Southwestern Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 83.7141 | 58,591,300.0 |
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.859387 | 601483 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.199806 | 139843 | ||||
K-BAC 1005 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.76 | 0.001758 | 1230.41 | |
Polyethylene Glycol | 25322-68-3 | 50 | 0.006973 | 4880.57 | ||||
Water | 7732-18-5 | 44.3 | 0.005516 | 3860.88 | ||||
WFRA-2000 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.024527 | 17166.2 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.020112 | 14076.3 | ||||
Water | 7732-18-5 | 60 | 0.049054 | 34332.4 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 15.1077 | 10,573,900.0 | |
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Ethylene Glycol | 107-21-1 | 40 | 0.000286 | 200.36 | |
Polyether | 60828-78-6 | 10 | 0.00005000 | 35.028 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00002500 | 17.514 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.000103 | 72.4379 | ||||
Formic acid | 64-18-6 | 20 | 0.0001 | 70.056 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00009000 | 63.1205 | ||||
LT FLUSH SYSYTEM I | U.S. Well Services, LLC | Other | Mineral oil, petroleum distillates, hrdotreated light naphthenic |
64742-53-6 | 100 | 0.001762 | 1232.99 | |
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.006836 | 4784.79 | |
Proprietary Scale Inhibitor | Proprietary | 10 | 0.001829 | 1279.85 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-02-02 | 1 | White Sand | 7,025,332 | 7,980 | 8,611 |
2018-02-02 | 2 | White Sand | 7,025,332 | 8,114 | 6,541 |
2018-02-02 | 3 | White Sand | 7,025,332 | 8,026 | 6,646 |
2018-02-02 | 4 | White Sand | 7,025,332 | 8,059 | 6,707 |
2018-02-03 | 5 | White Sand | 7,025,332 | 7,901 | 6,442 |
2018-02-03 | 6 | White Sand | 7,025,332 | 7,766 | 6,681 |
2018-02-03 | 7 | White Sand | 7,025,332 | 7,706 | 6,293 |
2018-02-03 | 8 | White Sand | 7,025,332 | 8,023 | 6,255 |
2018-02-04 | 9 | White Sand | 7,025,332 | 7,627 | 6,872 |
2018-02-04 | 10 | White Sand | 7,025,332 | 7,884 | 6,593 |
2018-02-04 | 11 | White Sand | 7,025,332 | 7,987 | 6,517 |
2018-02-04 | 12 | White Sand | 7,025,332 | 8,054 | 6,436 |
2018-02-04 | 13 | White Sand | 7,025,332 | 8,012 | 6,689 |
2018-02-05 | 14 | White Sand | 7,025,332 | 7,614 | 6,459 |
2018-02-05 | 15 | White Sand | 7,025,332 | 7,937 | 6,598 |
2018-02-05 | 16 | White Sand | 7,025,332 | 8,437 | 6,694 |
2018-02-05 | 17 | White Sand | 7,025,332 | 7,949 | 7,002 |
2018-02-06 | 18 | White Sand | 7,025,332 | 7,584 | 6,494 |
2018-02-06 | 19 | White Sand | 7,025,332 | 7,671 | 6,645 |
2018-02-06 | 20 | White Sand | 7,025,332 | 7,573 | 6,797 |
2018-02-06 | 21 | White Sand | 7,025,332 | 7,893 | 6,614 |
2018-02-06 | 22 | White Sand | 7,025,332 | 7,697 | 7,223 |
2018-02-06 | 23 | White Sand | 7,025,332 | 8,003 | 7,977 |
2018-02-06 | 24 | White Sand | 7,025,332 | 7,525 | 6,635 |
2018-02-07 | 25 | White Sand | 7,025,332 | 7,482 | 5,685 |
2018-02-07 | 26 | White Sand | 7,025,332 | 7,416 | 6,288 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SWN PROD CO LLC | 2,160,685.00 | 294 | 0.00 | 0 | 0.00 | 0 |
2019 | SWN PROD CO LLC | 1,378,858.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SWN PROD CO LLC | Synthetic Liner Materials | 1.48 Tons | LANDFILL | 101247 |
2017 | SWN PROD CO LLC | Drilling Fluid Waste | 515.92 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Produced Fluid | 168.54 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Other Oil & Gas Wastes | 179.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017 | SWN PROD CO LLC | Drill Cuttings | 1,147.23 Tons | LANDFILL | 101247 |
2018 | SWN PROD CO LLC | Produced Fluid | 9,686.33 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Drilling Fluid Waste | 533.33 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Unused Fracturing Fluid Waste | 7.34 Tons | LANDFILL | 100933 |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 131.25 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018 | SWN PROD CO LLC | Produced Fluid | 80.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | SWN PROD CO LLC | Produced Fluid | 38.30 Tons | LANDFILL | 301358 |
2018 | SWN PROD CO LLC | Produced Fluid | 823.00 Bbl | REUSE (AT WELL PAD) | |
2018 | SWN PROD CO LLC | Other Oil & Gas Wastes | 205.23 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018 | SWN PROD CO LLC | Synthetic Liner Materials | 32.00 Tons | LANDFILL | 101247 |
2018 | SWN PROD CO LLC | Filter Socks | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2018 | SWN PROD CO LLC | Produced Fluid | 4,903.41 Bbl | SURFACE IMPOUNDMENT | 826342 |
2019 | SWN PROD CO LLC | Other Oil & Gas Wastes | 38.79 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 1,224.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019 | SWN PROD CO LLC | Produced Fluid | 265.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
2019 | SWN PROD CO LLC | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2648487 | Primary Facility | 2017-10-17 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection. Minichi Contracting Group was on site to drill and set the conductor pipe on the Watts 1H, 2H, and Humbert lll 2H wells. I met with driller Keith Bowman. The rig is a dual rotary rig and was on the Humbert lll 2H. The proposed depth for the Humbert 2H well is 75'. The Watts 1H was drilled to a depth of 75'. The Watts 2H was drilled to a depth of 72'. The drill cuttings were being put into rolloff containers and hauled to the Keystone landfill. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2668739 | Primary Facility | 2017-12-08 | Drilling/Alteration | No Violations Noted | At time of the inspection.
Met with company man Tom Howard. SDC 44 was on site and drilling the hole for the production casing. The proposed depth for the well is 12,103'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2694071 | Primary Facility | 2018-02-12 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
Met with company man Lonterian Epps. They just set the plug and perf after stage 15 on the Watts 1H and was pulling the wire line out of the hole when I arrived. There were 15 stages completed out of 63 on the Watts 1H. The Watts 2H was completed with 24 stages. The Humbert lll 2H was completed with 26 stages. The water was being pump to the location from the Young fresh water impoundment. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2732528 | Primary Facility | 2018-05-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was recently completed and put in production. The cellar was set up with a corrugated pipe around the well for inspection access. The (20x13) and (13x9) annuli were below the water level and there was no bubbling noticed. There were empty 500bbl tanks on containment at two separate locations on the pad. The containment at one location appeared to be in good condition and at the other location the containment was ripped and propped up to form a berm so fluid couldn't run off the containment to the ground. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2732661 | Primary Facility | 2018-05-21 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted. |
2771454 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted. |
2830373 | Primary Facility | 2019-01-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was set up with a plastic corrugated pipe around the well for inspection access. The cellar was full of water and there was no bubbling noticed. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]