If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22228 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.660794,"lon":-75.997296,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 147620 | |
Farm/Lease Name: MARIS SUS 25H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-11-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.660794 | |
Longitude: -75.997296 |
Date | Event |
---|---|
2016-11-18 | New Permit Application |
2016-11-18 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-07-28 | 2017-08-13 | 7,503 | 10,986,200 | 1,038,930 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 17.7027 | 0 |
HCL 5.1 - 7.5 | BJ SERVICES | Acid | Water | 007732-18-5 | 93 | 0.6926 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.05616 | 0 | ||||
CI-14, FERROTROL 300L | BJ SERVICES | Corrosion Inhibitor, Iron Control Agent | Modified Thiourea Polymer | 068527-49-1 | 7 | 0.00011 | 0 | |
Proprietary Olefin | Trade Secret | 5 | 0.00008000 | 0 | ||||
Muriatic Acid Hydrogen Chloride | 7647-01-0 | 1 | 0.00002000 | 0 | ||||
Proprietary Polyoxyalkylenes | Trade Secret | 20 | 0.00031 | 0 | ||||
Water | 007732-18-5 | 100 | 0.00636 | 0 | ||||
Proprietary Fatty Acids | Trade Secret | 10 | 0.00015 | 0 | ||||
Formaldehyde (impurity) | 50-00-0 | 1 | 0.00002000 | 0 | ||||
Water | 007732-18-5 | 1 | 0.00002000 | 0 | ||||
SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 2 | 0.00011 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0 | 0 | |
FERROTROL 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 50 | 0.00259 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 8.68607 | 0 | |
SC-82 | X CHEM | Scale Inhibitor | Water | 7732-18-5 | 100 | 0.00163 | 0 | |
Sodium Chloride | 7647-14-5 | 1 | 0.00002000 | 0 | ||||
Sodium Hydroxide | 001310-73-2 | 5 | 0.00008000 | 0 | ||||
Bishexamethylenetriamine pentamethylene phosphonic acid | 034690-00-1 | 30 | 0.00049 | 0 | ||||
MAXPERM 30 | BJ SERVICES | Friction Reducer | Oxyalkylated alcohol | Trade Secret | 5 | 0.00297 | 0 | |
Acrylamide modified polymer | Trade Secret | 50 | 0.02968 | 0 | ||||
Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.01187 | 0 | ||||
CI-14 | BJ SERVICES | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 68 | 0.00085 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 5 | 0.00006000 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 70.8583 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 2,028,044.00 | 111 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 2,905,338.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,614,363.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 24.43 Tons | LANDFILL | 301626 |
2016 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 453.46 Tons | LANDFILL | 8-4630-00010/00 |
2016 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 604.62 Tons | LANDFILL | THR029 |
2016 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 266.71 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 33.40 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 223.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 762.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 289.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 700.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,703.70 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 16.22 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 6.20 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 36.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 2.60 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 388.80 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 182.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 20.40 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 322.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 36.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.35 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 39.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2539547 | Primary Facility | 2016-11-23 | Drilling/Alteration | No Violations Noted | |
2542204 | Primary Facility | 2016-12-06 | Routine/Complete Inspection | No Violations Noted | |
2542897 | Primary Facility | 2016-12-05 | Drilling/Alteration | No Violations Noted | |
2545472 | Primary Facility | 2016-12-15 | Drilling/Alteration | Pending | |
2621275 | Primary Facility | 2017-07-31 | Complaint Inspection | Pending | The complainant reported activity at the site was impacting their quality of life by way of noise, vehicular traffic, and dust. Hydraulic fracturing operations had commenced at the site on or about 25JUL2017. Upon arrival I met with Oze Pruitt, the on-site Company Man, to notify and discuss the complaint I was investigating. Mr. Pruitt acknowledged that he understood my concerns and observations. He explained the silos were filled after each stage of the frack and were currently on stage ten of forty-nine. Mr. Pruitt informed me that he would coordinate with his immediate supervisor to address the issue as promptly as possible. I will conduct a follow-up inspection. |
2624915 | Primary Facility | 2017-08-10 | Complaint Inspection | Pending | I conducted the inspection accompanied by Jon Sassi, EPS. Upon arrival, we met with Mr. Deismond Bufford, Company Man on site. Mr. Bufford informed us the Hydraulic Fracturing (Frac) operations were currently between stages and 39 of 49 stages have been completed. Mr. Bufford informed us the expected conclusion and departure of the fracing operation should occur on or about 13AUG2017. A completions crew would arrive on site shortly after departure of the fracing equipment. I explained to Mr. Bufford I was conducting an ongoing complaint investigation concerning dust being generated by activity related to the operations. The findings of this inspection are previously listed in this report. If there are any questions, please contact me. - Invalid Complaint Id. - 328527 |
2639169 | Primary Facility | 2017-09-22 | Complaint Inspection | No Violations Noted | Upon arrival I met with Farrell Deslatte, on-site consultant representing Chesapeake Energy. Mr. Deslatte explained he was overseeing the installation of the flow lines to the GPUs (Gas Production Unit) and sand separators from the well. The installation was being conducted by Wood Group. Mr. Deslatte expected the work will completed by 27SEP2017. At the conclusion of my inspection I departed from the site. - Invalid Complaint Id. - 328527 |
2714745 | Primary Facility | 2018-04-05 | Site Restoration | No Violations Noted | I inspected the Maris well site on April 5, 2017. The access road was very solid, and the pad surface was solid as well. The cut and fill slopes were solid and rocky. The wells were labeled correctly. Vegetation was prominent wherever it was possible for it to grow. There were no temporary BMPs left on site. There were no erosional issues noted. There were no observed violations. The wells associated with this site are as follows:
115-20925 115-22228 115-22227 |
2782155 | Primary Facility | 2018-10-01 | Routine/Complete Inspection | No Violations Noted | The well access road was firm and solid with no erosional issues. While on site I was approached by the landowner who seemed satisfied with the construction and maintenance of the well pad. The pad surface had some puddling from recent rains but was otherwise solid. The slopes around the well site were stable, but most of the area was simply too rocky to support growth. Where the vegetation was able to grow, it was perennial and exceeded the Department 70% standard. The PCSMs were all in place and the temporary BMPs surrounding the site were all removed. The wells were properly labeled.
There were no violations noted. |
For data sources see[8]