37-115-22547

Well Details

Well ID: 37-115-22547
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148859
Farm/Lease Name: MCGAVIN 21H
License Status:
Spud Date: 2018-10-15
Permit Date: 2018-08-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.652528
Longitude: -76.032956

For data sources see[1][2][3]

Well History

Date Event
Deviated
2018-08-17 New Permit Application
2018-10-13 Performed Spud Operation
2019-02-21 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CHESAPEAKE APPALACHIA LLC 4,417,299.00 203 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 4.03 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Drill Cuttings 160.39 Tons LANDFILL THR029
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 113.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 CHESAPEAKE APPALACHIA LLC Drill Cuttings 608.82 Tons LANDFILL 100933
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 10.89 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.66 Tons LANDFILL 8-0728-0004/013
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 245.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 78.45 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,708.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 12.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 20.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 172.47 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,313.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.06 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 1,160.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2834415 Primary Facility 2019-01-30 Drilling/Alteration No Violations Noted Arrived on location at 12:45. Weather: 10 degs., recent snowfall ~ 6". Upon arrival I met with CALLC's Co. Man, Terry Hooper. Patterson #572 rig was rigged up over the 23H well. Presently, rig is drilling production hole, on oil base mud, at a depth of 16,395' to a projected TD of 17,788'. Anticipate TD being reached later today. Should be running 5.5" prod. casing and cementing same tomorrow evening. This will be the 2nd of (3) new wells being drilled on this pad. The McGavin 2H has been drilled and cased to a TD of 13,455'. The McGavin 21H has had conductor set. Rig will be skidding to 21H to resume drilling upon completion of drilling on the 23H. The (2) existing wells on this pad, the McGavin 4H & 5H wells have been shut in and temp. P&A'd in preparation for drilling of new wells on pad.
  - Overall, location and Rig were found in good condition at time of inspection. No Drilling violations were noted.  (See McGavin 23H inspection for further details.) Left location at 14:45.
2843392 Primary Facility 2019-02-08 Drilling/Alteration No Violations Noted I arrived at the site at 10:37. The weather conditions are partly sunny skies and very windy, with a temperature of 45 degrees Fahrenheit. Patterson UTI Drilling Rig #572 is on the location. The most recent Drilling Resumption After Break of 30 days more notification to the Department on 2/2/19. The notification indicates drilling of the McGavin 21H would commence at 1AM on 2/3/19. Glen Wolf, consultant of CHK, is the company man on the location. The current drilling depth of the McGavin 21H well is (5,303 feet.) Mr. Wolf informed me the following information in relation to site activities. "We are on the McGavin 21H well. The surface and intermediate sections of the well have been cemented. The well will be drilled to total depth at (18,200) feet. The well is being drilled with diesel oil based drilling mud in the vertical section. The 2H and 23H have been drilled to total depth. The wells that were in production are shut in."

The McGavin 4H well, Permit # 115-20268, and the McGavin 5H well, P

For data sources see[7]