X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-01286

Well Details

Well ID: 37-125-01286
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Blaine Township
Operator Name: DALLAS ENERGY LLC
Well Pad ID:
Farm/Lease Name: JOSEPH LEECH
License Status: Plugged and Abandoned
Spud Date:
Permit Date:
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.199306
Longitude: -80.366972

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
1919-06-06 Drilling Completion
1986-04-18 Drilled Deeper
1986-04-18 Old Well
2016-06-29 Begin Plugging
2016-07-22 Finished Plugging
2019-05-03 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1993 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1996 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1997 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1998 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
1999 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2000 PENNZOIL PROD CO 0.00 0 0.00 0 0.00 0
2001 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2002 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2003 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2005 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2006 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2007 EAST RESOURCES INC 0.00 0 0.00 0 0.00 0
2008 EAST RESOURCES INC 0.00 0 243.00 365 0.00 0
2010 EAST RESOURCES MGMT LLC 0.00 0 0.00 0 0.00 0
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2509476 Primary Facility 2016-06-28 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ rigging up to begin plugging.
2509479 Primary Facility 2016-07-11 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ preparing to run CBL, loading hole. Top of cement plug @ 2085 feet.
2509487 Primary Facility 2016-07-20 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ has hole loaded. No activity at time of inspection.
2509493 Primary Facility 2016-07-21 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ installing new wireline on rig.
2509499 Primary Facility 2016-07-22 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ spotted cement plug to surface, shut down.
2509507 Primary Facility 2016-07-25 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ rigged down (well plugged to surface).
2509515 Primary Facility 2016-08-03 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ set subsurface marker, graded, seeded and mulched site.

For data sources see[6]

References