37-125-01901

Well Details

Well ID: 37-125-01901
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Cecil Township
Operator Name: CANONSBURG SUPPLY & EQUIP CO
Well Pad ID:
Farm/Lease Name: CANONSBURG SUPPLY 5
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date:
Well Type: UNDETERMINED
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.292731
Longitude: -80.208644

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
1998-07-10 OLD WELL
2010-10-22 Drilling Completion
2011-07-20 FULLY PLUGGED

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1913813 Primary Facility 2010-09-14 Plugging(Includes Plugged/Mined Through) No Violations Noted WELL WAS REGISTERED IN 1994 WITH THE REST OF THE WELLS ON 9-4 AND ARE EQUIPED WITH EXACTLY THE SAME HARDWARE AS THE OTHER CANONSBURG SUPPLY WELLS IN THE AREA. WELL IS JUST OVER THE HILL FROM HYDROCARBON'S RIG AND SHOULD BE ADDED TO 9-4.
1931669 Primary Facility 2010-10-22 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is restoring location. Trash pick up and dozer restoration
1931670 Primary Facility 2010-09-27 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon building a road in to location and installing a culvert under the access road. E&S controls are extensive due to the hillside location above the stream.
1931671 Primary Facility 2010-09-28 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon rigging up. They may pick up tools today or tomorrow at the latest.
1931673 Primary Facility 2010-10-06 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon tripping pipe and preparing to run cement
1931674 Primary Facility 2010-10-08 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon stage cementing
1931675 Primary Facility 2010-10-13 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is pulling 4 1/2. Casing is hanging up, hole may be caving in on the backside. I've advised Hydrocarbon not to pull any more than 120% of the stringwt and play it safe.
1931676 Primary Facility 2010-10-14 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is tripping pipe, getting ready to run cement
1931678 Primary Facility 2010-10-19 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is stage cementing. 110-120 sacks. hands are slaving at the hopper. site is clean
1931679 Primary Facility 2010-10-20 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is tagging plug, getting ready to trip and set final plug.
1931681 Primary Facility 2010-10-21 Plugging(Includes Plugged/Mined Through) No Violations Noted Hydrocarbon is rigging down
1937720 Primary Facility 2010-12-17 Plugging(Includes Plugged/Mined Through) No Violations Noted Well Plugged, site restored