X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27723

Well Details

Well ID: 37-125-27723
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: EQT PROD CO
Well Pad ID: 145213
Farm/Lease Name: R SMITH 593775
License Status:
Spud Date:
Permit Date: 2015-09-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.164806
Longitude: -79.944422

For data sources see[1][2][3]

Well History

Date Event
2015-09-18 New Permit Application
2016-12-01 New Permit Application
2016-12-03 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-06 2017-05-02 7,705 16,834,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water FTS International Carrier/Base Fluid Water 7732-18-5 100 89.4301 140,485,000.0
HVG-1 4.0 FTS International Water Gelling Agent Listed Below
CI-150 FTS International Acid Corrosion Inhibitor Listed Below
LD-2550 Multi-Chem Group Additive Listed Below
APB-1 FTS International Gel Breaker Listed Below
CS-500 SI FTS International Scale Inhibitor Listed Below
MC MC 5-2349 Multi-Chem Group Friction Reducer Breaker Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
Hydrochloric Acid (15%) FTS International Acidizing Listed Below
Quaternary ammonium compound Proprietary 10 0.00005364 84.268
Guar gum 9000-30-0 50 0.000187842 295.079
Polyacrylate Proprietary 30 0.0201804 31701.2
Alkyl Alcohol Proprietary 10 0.00002779 43.661
Sodium nitrate 7631-99-4 5 0.00046847 735.916
Ethylene Glycol 107-21-1 13 0.00006263 98.383
Inner salt of alkyl amines Proprietary 60 0.00790616 12419.7
Hydrochloric Acid 7647-01-0 15 0.0417783 65629.3
Sodium chloride 7647-14-5 5 0.0033634 5283.54
Alkyl Alcohol Proprietary 10 0.00002779 43.661
Calcium nitrate.4H2O 13477-34-4 100 0.103083 161932
Oxyalkylated alcohol A Proprietary 5 0.00001390 21.831
Calcium nitrate.4H2O 13477-34-4 100 0.103083 161932
Oxyalkylated alcohol A Proprietary 5 0.00001390 21.831
Guar gum 9000-30-0 50 0.000187842 295.079
Ethylene Glycol 107-21-1 10 0.00230157 3615.53
Ethylene Glycol 107-21-1 30 0.00016093 252.803
Isopropanol 67-63-0 30 0.00016093 252.803
Hydrotreated Light Distillate 64742-47-8 30 0.00008338 130.983
Ammonium persulfate 7727-54-0 95 0.00000484 7.6
Quartz 14808-60-7 4 0.00001503 23.606
Polyacrylate Proprietary 30 0.0201804 31701.2
Aromatic aldehyde Proprietary 10 0.00005364 84.268
Sodium nitrate 7631-99-4 5 0.00046847 735.916
Hydrotreated Light Distillate 64742-47-8 30 0.00008338 130.983
Ammonium persulfate 7727-54-0 13 0.00006263 98.383
Sodium chloride 7647-14-5 5 0.0033634 5283.54
Raffinates, Sorption Process 64741-85-1 55 0.000206626 324.587
Ammonium persulfate 7727-54-0 95 0.00000484 7.6
Inner salt of alkyl amines Proprietary 60 0.00790616 12419.7
Quartz 14808-60-7 4 0.00001503 23.606
Fatty nitrogen derived amides Proprietary 5 0.0033634 5283.54
Sodium chloride 7647-14-5 10 0.00131769 2069.96
Raffinates, Sorption Process 64741-85-1 55 0.000206626 324.587
Isotridecanol, ethoxylated 9043-30-5 2 0.00000751 11.803
Silica Substrate 14808-60-7 100 10.0738 15,824,800.0
Dimethylformamide 68-12-2 10 0.00005364 84.268
Sodium chloride 7647-14-5 100 0.0093694 14718.3
Sodium chloride 7647-14-5 100 0.0093694 14718.3
Ethoxylated alcohol Proprietary 5 0.0033634 5283.54
Isotridecanol, ethoxylated 9043-30-5 2 0.00000751 11.803
Sodium chloride 7647-14-5 10 0.00131769 2069.96
Ethylene Glycol 107-21-1 13 0.00006263 98.383
Organic amine resin salt Proprietary 30 0.00016093 252.803
Hydrotreated light petroleum distillate 64742-47-8 30 0.0201804 31701.2
Ammonium persulfate 7727-54-0 13 0.00006263 98.383
FRW-900 FTS International Friction Reducer Listed Below
MC MX 5-3886 Multi-Chem Group Specialty Brine Listed Below
MC MX 8-2544 Multi-Chem Group Live Culture - Nitrate Reducing Bacteria Listed Below
LD-2250 Multi-Chem Group Friction Reducer Listed Below
Sand (Proppant) FTS International Proppant Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 1,382,619.00 153 0.00 0 0.00 0
2018 EQT PROD CO 2,691,028.00 337 0.00 0 0.00 0
2019 EQT PROD CO 1,605,080.00 321 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EQT PROD CO Drill Cuttings 273.70 Tons LANDFILL 100172
2017 EQT PROD CO Produced Fluid 373.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 1,100.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Synthetic Liner Materials 2.31 Tons LANDFILL 100277
2017 EQT PROD CO Waste Water Treatment Sludge 43.24 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 EQT PROD CO Drill Cuttings 1,027.54 Tons LANDFILL 100663
2017 EQT PROD CO Produced Fluid 107.84 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 EQT PROD CO Produced Fluid 19.23 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 EQT PROD CO Drilling Fluid Waste 2,075.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 4,185.38 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drilling Fluid Waste 2,030.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Drill Cuttings 213.48 Tons LANDFILL 100592
2017 EQT PROD CO Produced Fluid 140.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 EQT PROD CO Produced Fluid 85.48 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 EQT PROD CO Other Oil & Gas Wastes 10.45 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 EQT PROD CO Other Oil & Gas Wastes 10.45 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 1,484.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 586.51 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 91.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 148.98 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Other Oil & Gas Wastes 71.58 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EQT PROD CO Produced Fluid 48.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 2,342.16 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 25.39 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 EQT PROD CO Other Oil & Gas Wastes 5.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 2.89 Bbl INJECTION DISPOSAL WELL 34-167-28462
2019 EQT PROD CO Produced Fluid 31.84 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Other Oil & Gas Wastes 19.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 EQT PROD CO Produced Fluid 11.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Produced Fluid 20.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Other Oil & Gas Wastes 257.95 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2402154 Primary Facility 2015-08-14 Compliance Evaluation No Violations Noted On 8/14/15, I inspected the Robert Smith site as a compliance evaluation inspection in response to the remediation report for a spill occurring on 1/31/15 and made the following observations:
2542751 Primary Facility 2016-12-07 Drilling/Alteration No Violations Noted Cellar Tech auger rig

Drilled a 30” wellbore and set 26” conductor casing at 65 ft. on 12/7/16.

2544081 Primary Facility 2016-09-14 Incident- Response to Accident or Event No Violations Noted On 9/14/16 I performed an incident response inspection at the Robert Smith Site in response to an operator reported spill (CTS ID: 322335) and made the following observations:

•On 9/6/16 EQT Corey Giles reported a spill of 100 gallons of produced fluids to the well pad. The spill was forwarded to the WQS on 9/14/16. This constitutes a violation of 25 Pa. Code § 78.57(a) and 25 Pa. Code § 78.54 for failing to control brine and other fluids resulting in discharge to the ground and failure to prevent pollution to the Waters of the Commonwealth. •The spill was cleaned up at the time of inspection with the only observed indicator of the spill location being an area of new gravel on the pad near the production units. No violation. •Well drilling was ongoing at the time of inspection. •During general pad inspection it was noted that multiple production tanks had orange streaking running down their sides from the top of the tanks. The gravel of the pad surface near the containment displayed matching orange stai

2553250 Primary Facility 2017-01-12 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #277

The 18 5/8” casing was set at 307 ft. on 1/8/17 and cemented to surface with 45 bbls returned. The 13 3/8” casing was set at 462 ft. on 1/9/17 and grouted to surface above a basket. A mine was found from 366 ft. to 373 ft. A basket was set at 352 ft. Currently at 1586 ft. and drilling ahead.

2557430 Primary Facility 2017-01-26 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #277

The 9 5/8” casing was set at 1712 ft. on 1/12/17 and cemented to surface with 39 bbls returned. KOP was at 2300 ft. EOB was at 9173 ft. MD (7307 ft. TVD). Currently at 18,205 ft. Drill string became stuck in the wellbore at approximately 4:00 a.m. today. Currently waiting on wireline to determine free point of drill string.

2560625 Primary Facility 2017-02-09 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #277

Operator worked tight hole, cleaned and circulated to free drill string on 1/26/17. Resumed drilling on 2/3/17. TD was at 20,994 ft. MD (7252 ft. TVD) on2/4/17. The 5 ½” casing was set at 20,986 ft. and cemented to surface with 30 bbls returned.

2614170 Primary Facility 2017-05-05 Incident- Response to Accident or Event In Compliance with Policy On 5/5/17 an INCDT inspection of the R. Smith well site was conducted in response to CTS ID: 326715. The following was observed:

>> Site was undergoing fracking at time of inspection.

>>The spill in question involved roughly 10 gallons of produced water being sprayed from from an overfilled accessory tank on the pad. Affected pad materials were collected and placed in a waste box on pad for disposal. No violation, site appears to be in compliance with policy.

>>Streaking was again noted on the outside of multiple production tanks similar to streaking noted in previous inspections.

2660168 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted On 11/10/17 a routine complete inspection of the R. Smith well site was conducted in response to notification additional drilling on site. The following was observed:

>>A box tank was found near the impoundment with no containment. Remediation recommended, no violation.

>>A new top soil stock pile was noted on site. It was stabilized with straw at the time of inspection.

>>The soil stock pile was noted to not have any functional controls below it other than an adequate vegetated strip. Decomposed CFS should be removed, repaired, or replaced. No violation.

>>Drilling was ongoing at the site at the time of inspection.

2691611 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Well has been fracked and is producing.
2705666 Primary Facility 2018-03-13 Routine/Partial Inspection No Violations Noted On 3/14/18 a routine complete inspection of the R. Smith Well Site was conducted in response to a notification of proposed construction activity on the pad. The following was observed:

>>The site was in a high activity phase at the time of inspection drilling appeared to be completed and the site was in apparent transition to post drilling activities. No drilling rig was present on site at the time of inspection.

>>Construction of a proposed AST had not begun at the time of inspection.

>>Many water trucks were present on site in association with the attached impoundment.

2738526 Primary Facility 2018-05-16 Incident- Response to Accident or Event No Violations Noted On 5/16/18 an incident inspection of the R. Smith well site was conducted in response to a spill reported by the operator on 5/14/18. The following was observed:

>>The operator reported that roughly 35 gallons of mixed rain water and produced water was spilled to the pad when a section of containment was moved without being drained first. Fluids were spread over a large area of the pad along the area in front of the production units per discussion with Mike Cromley at the time of inspection. This does constitute a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents prevents pollution to the ground or Waters of the Commonwealth however, the violation is regarded as immediately corrected.

>>Site inspection found no residual evidence of the spill. The operator reported that all visibly impacted gravel from the spill area had been removed (roughly two clamshell dumpsters).

2747201 Primary Facility 2018-06-29 Routine/Partial Inspection No Violations Noted On 6/29/18 a routine partial inspection of the R. Smith Well Site was conducted in response to concerns about runoff raised by a nearby resident. The following was observed:

>>An unstabilized soil pile near the corner of the pad with a newly improved drain. Controls below the pile were absent though the vegetation was sufficient. No violation, remediation recommended.

>>Another only partially stabilized soil pile with no controls below the pile was located along the accessory pad access road. No controls beyond vegetation were present below the soil pile. No violation, monitoring recommended.

>>An AST was present on the accessory pad.

>>The pad was active at the time of inspection with drilling preparations ongoing. A sound wall was present around the pad perimeter.

2761873 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted On 8/2/18 a complaint response inspection was conducted of the R Smith well site in response to reported concerns of inappropriate drainage from the pad. WQSS John Carson accompanied. The following was observed:

>>A top soil pile on the access road to the accessory pad remained lacking vegetation and with spotty temporary stabilization. The vegetative strip below remains in good condition. Remediation recommended, no violation.

>>Emptying partially filled containment is encouraged to aid in identifying any possible leaks. No violation.

>>No evidence of excessive or unpermitted runoff from the pad was found.

>>Box in containment appears to be collecting emergency blowdown. If so it should be properly marked. No violation.

For data sources see[8]

References