X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28311

Well Details

Well ID: 37-125-28311
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Bethlehem Township
Operator Name: EQT PROD CO
Well Pad ID: 154372
Farm/Lease Name: HUNTER AMT113H8
License Status:
Spud Date:
Permit Date: 2017-10-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.031810
Longitude: -80.140840

For data sources see[1][2][3]

Well History

Date Event
2017-10-13 New Permit Application
2018-07-27 Performed Spud Operation
2018-09-13 MOD

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-01 2019-03-13 7,780 12,475,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MX-8-4543 HES Multi-Chem Bacteria Treatment Listed Below
MX-5-3886 HES Multi-Chem Bacteria Treatment Listed Below
Unihib-G Universal Acid Corrosion Inhibitor Listed Below
Hydrotreated light petroleum distilate 64742-47-8 60 0.000304191 370.999
Contains no hazardous substances Proprietary 100 0.00252089 3074.54
Sodium chloride 7647-14-5 5 0.000439749 536.329
Formaldehyde 0000067-56-1 5 0.00000296 3.613
Thiourea 0000050-00-0 1 0.00000059 0.723
Amines, polyethylenepoly-, ethoxylated,
phosphonomethylated, sodiumsalts
70900-16-2 30 0.0026385 3217.97
Calcium nitrate.4H2O 13477-34-4 100 0.0373234 45520.5
Thiourea 0000050-00-0 1 0.00000059 0.723
Hydrochloric Acid 7647-01-0 15 0.0112885 13767.7
Calcium nitrate.4H2O 13477-34-4 100 0.0373234 45520.5
Silica Substrate 14808-60-7 100 14.4568 17,631,800.0
Poly(oxy-1,2-ethanediyl),.alpha.-tridecyl-.omega.-hydroxy-,branche
d
69011-36-5 5 0.00276727 3375.03
Methanol 67-56-1 30 0.0026385 3217.97
Methanol 0068002-97-1 50 0.00002962 36.127
Hydrotreated light petroleum distilate 64742-47-8 60 0.000304191 370.999
Ethoxylated alcohol Proprietary 5 0.00276727 3375.03
Contains no hazardous substances Proprietary 100 0.00252089 3074.54
Formaldehyde 0000067-56-1 5 0.00000296 3.613
Butyl diglycol 0000112-34-5 75 0.00004443 54.19
Methanol 0068002-97-1 50 0.00002962 36.127
Butyl diglycol 0000112-34-5 75 0.00004443 54.19
Hydrotreated light petroleum distilate 64742-47-8 30 0.0166036 20250.2
Hydrochloric Acid (15%) Universal Acidizing Listed Below
LD-2950 HES Multi-Chem Friction reducer Listed Below
LD-2515 HES Multi-Chem Friction reducer Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
MX-2-2822 HES Multi-Chem Scale Inhibitor Listed Below
Sand (Proppant) EQT Proppant Listed Below
Water Universal Carrier/Base Fluid Water 7732-18-5 100 85.3634 104,111,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 EQT PROD CO 560,918.00 73 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 EQT PROD CO Drill Cuttings 1,027.74 Tons LANDFILL 100172
2018 EQT PROD CO Drill Cuttings 493.31 Tons LANDFILL 100419
2018 EQT PROD CO Other Oil & Gas Wastes 135.01 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Drilling Fluid Waste 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Drilling Fluid Waste 230.00 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 2.47 Tons LANDFILL 100172
2019 EQT PROD CO Soil Contaminated by Oil 100.00 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 EQT PROD CO Produced Fluid 36.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 95.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Synthetic Liner Materials 3.14 Tons LANDFILL 100277
2019 EQT PROD CO Other Oil & Gas Wastes 3.72 Tons LANDFILL 100419
2019 EQT PROD CO Waste Water Treatment Sludge 8.03 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2019 EQT PROD CO Produced Fluid 34.48 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 EQT PROD CO Other Oil & Gas Wastes 25.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 EQT PROD CO Produced Fluid 63.45 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Soil Contaminated by Oil & Gas Related Spills 100.00 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 EQT PROD CO Other Oil & Gas Wastes 910.63 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 EQT PROD CO Produced Fluid 16.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 1.15 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 EQT PROD CO Produced Fluid 219.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 EQT PROD CO Other Oil & Gas Wastes 565.90 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 919.80 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 92.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 EQT PROD CO Produced Fluid 17.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 EQT PROD CO Synthetic Liner Materials 4.96 Tons LANDFILL 100419
2019 EQT PROD CO Produced Fluid 16.40 Bbl INJECTION DISPOSAL WELL 34-119-28776

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2757313 Primary Facility 2018-07-30 Drilling/Alteration No Violations Noted Cellar Tech/NOV auger rig drilled a 30" well bore and set 26" conductor casing at 40 ft. on 7/27/18.
2795960 Primary Facility 2018-10-25 Drilling/Alteration No Violations Noted Falcon Drilling Rid #25 moved onto this well on 10/17/18 and resumed drilling at 53 ft. KB. The 18 5/8" casing was set at 511 ft. on 10/18/18 and cemented to surface with 42 bbls returned. The 13 3/8" casing was set at 758 ft. on 10/20/18 and cemented to surface with 30 bbls returned. Coal was found from 708 ft. to 714 ft. The 9 5/8" casing was set at 2445 ft. on 12/22/18 and cemented to surface with 60 bbls returned. Currently at 5635 ft. working tight well bore.
2797842 Primary Facility 2018-11-02 Drilling/Alteration No Violations Noted Precision Drilling Rig #539 moved onto this well on 10/29/18. Air rig drilled to 5635 ft. and got stuck in well bore. Drill pipe was removed. Operator was unable to fish out BHA with air rig. Precision #539 attempted to fish out BHA but was unsuccessful. There is 130 ft. of BHA including MWD tool left in hole. Operator set cement kick plug from 5464 ft. to 4943 ft. Currently rigging down cementers and preparing to sidetrack.
2803125 Primary Facility 2018-11-14 Drilling/Alteration No Violations Noted Precision Drilling Rig #539 started sidetrack 4925 ft. Lower curve was started at 8164 ft. EOB was at 9354 ft. MD (7653 ft. TVD). TD was at 16,835 ft. MD (7773 ft. TVD) on 11/9/18. The 5 1/2" casing was set at 16,821 ft. Estimated TOC at 3446 ft.
2833798 Primary Facility 2019-01-30 Routine/Complete Inspection No Violations Noted On 1/30/2019 at approximately 12:45, I conducted an incident response inspection of the Hunter Well site located in West Bethlehem Township, Washington County. I met with DJ Hardy and Marc Strini (EQT) to discuss the incident and associated remediation.

On 1/26/2019, production fluid spilled onto the ground at the Hunter Well site. The operator determined that a valve on the flow-back tank was left in the open position when a brine truck driver attempted to connect in order to discharge to the tank resulting in approximately 15 gallons of production water releasing to the ground. Due to the cold temperatures and frozen ground conditions, the fluid did not have a chance to saturate the ground in the area. All water was vacuumed up from the ground and inside the containment. A remediation contractor was dispatched to the location and used a skid steer and excavator to remove the impacted material. The impacted material was placed into 55 gallon drums and removed from the site to an approved disposal location.

For data sources see[8]

References