If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20013 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.458236,"lon":-75.972972,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Northmoreland Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: SKORONSKI 1 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: 2009-08-28 | |
Permit Date: 2009-06-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.458236 | |
Longitude: -75.972972 |
Date | Event |
---|---|
2009-06-12 | New Permit Application |
2009-08-27 | Performed Spud Operation |
2009-10-08 | Drilling Completion |
2012-07-11 | Drilling Completion |
2014-06-12 | Fully Plugged |
2014-06-12 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1813775 | Primary Facility | 2009-07-01 | Routine/Complete Inspection | No Violations Noted | |
1813852 | Primary Facility | 2009-07-15 | Routine/Complete Inspection | No Violations Noted | |
1833485 | Primary Facility | 2009-09-29 | Drilling/Alteration | No Violations Noted | Nomac Rig 236 on site. Drilling into the Oriskany formation. At time of inspection, coring had just been completed. Driller going back in hole to ream and clean out to TD or 9350', at which depth 7" casing will be installed and cemented to surface. |
1841683 | Primary Facility | 2009-10-18 | Routine/Complete Inspection | No Violations Noted | |
1852635 | Primary Facility | 2009-11-13 | Routine/Complete Inspection | No Violations Noted | |
1962573 | Primary Facility | 2011-04-01 | Routine/Complete Inspection | No Violations Noted | cellar full of water |
1962837 | Primary Facility | 2011-04-04 | Routine/Complete Inspection | Violation(s) Noted | |
1964973 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Met with Rick Hall of Chesapeake to discuss issues with site. Majority of filter sock will be removed however a length will remain to control the southeast corner. Modifications to improve runoff along access road and stabilization of slopes will occur. I will be notified when maintenance is complete. Awaiting to know status of pad, whether or not it will be kept in service. |
1975335 | Primary Facility | 2011-05-24 | Follow-up Inspection | No Violations Noted | |
1995748 | Primary Facility | 2011-08-15 | Routine/Complete Inspection | No Violations Noted | Cellar full fo water - no bubbles. Vent on 1 annulus. |
1998145 | Primary Facility | 2011-08-24 | Routine/Complete Inspection | Violation(s) Noted | Drilling completed on 10/8/2009. No site restoration has been conducted. |
2003615 | Primary Facility | 2011-09-19 | Follow-up Inspection | No Violations Noted | No one on site. Well head has been changed. Has not been plugged yet. |
2007023 | Primary Facility | 2011-09-29 | Follow-up Inspection | No Violations Noted | Raised berm around site. No plugging activity, call and see whats happening. Access road - poor cond. E-mail from Jim Govenlock, 9/30/2011- finished logging, still being plugged. |
2013492 | Primary Facility | 2011-10-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Preparing to P&A. Some equipment on site. No rig. Plastic containment is down, looks good. Talked to security - no one has been on site today. |
2013500 | Primary Facility | 2011-10-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer Well Service Rig COMP. Man - Gary Blanton |
2014151 | Primary Facility | 2011-10-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Gary Blanton |
2017972 | Primary Facility | 2011-11-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Earl Hunt Sr. |
2017975 | Primary Facility | 2011-10-31 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Earl Hunt Sr. Depth = 34.5' |
2018008 | Primary Facility | 2011-11-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Well is plugged. Cap is 4+' below ground level. Cellar has not been filled in yet. |
2031840 | Primary Facility | 2011-12-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | When they welded a cap on 9 5/8" pipe to bury, they heard hissing. They didn't get a good weld on cap, had a pinhole. Hot tapped csg and now have pressure guage installed. After about 30 min., have 120 psi. After talking to Kevin Costello I informed Earl Hunt,Jr. Chesapeake rep. that we did not want the well shut in for 2 or 3 days as we were concerned about causing a gas migration issue. He said he would vent it. Also, he said prior to the begining of plugging operations they had 800 psi on the 9 5/8" x 7" annulus. |
2031845 | Primary Facility | 2011-12-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Welded on a riser and wellhead. Well is vented. Hole has been filled in, just a cellar now. No one on site except security guard. |
2031846 | Primary Facility | 2011-12-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No activity. No rig yet. Only person on site is security guard. |
2031850 | Primary Facility | 2012-01-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No activity. No one on site but security guard. |
2035012 | Primary Facility | 2012-01-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No comp. man on site. Talked to security guard. Rig has been on site several days. They are waiting for OK office to decide what to do. |
2035019 | Primary Facility | 2012-01-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Jimmy Johns Getting ready to drill out plug at 25 - 125' . Will then monitor well.Called B J STONE in Athens office. He said he wasn't sure of well pressures over the weekend, they had drilled out the CIBP. He referred me to Josh Lawson. I told them to keep us informed and that we wanted their plan to plug befor they started plugging work. |
2036611 | Primary Facility | 2012-01-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 101, Comp. Man - John Wayne Bailey |
2036617 | Primary Facility | 2012-01-20 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No one on sitew but Thurmon from EFS flowback. He's just watching equipment. Appears they have finished drilling out cement plug. |
2036627 | Primary Facility | 2012-01-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig Mercer 101, Comp. Man - John Wayne Bailey |
2037394 | Primary Facility | 2012-01-25 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 103, Comp Man - Mike Reel |
2041229 | Primary Facility | 2012-02-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 103, Comp. Man - Mike Reel |
2041231 | Primary Facility | 2012-02-06 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer rig 103, Comp. Man - Mike Reel |
2041234 | Primary Facility | 2012-02-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No Ches. people on site. Not working today or most of weekend according to security personnel. |
2041236 | Primary Facility | 2012-01-31 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Had equipment failure yesterday. Didn't get anything done. Ready to start pumping Maracel soon. Cut in pipe is at 1150'. |
2041239 | Primary Facility | 2012-01-30 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 103, Comp. Man - Mike Reel |
2047122 | Primary Facility | 2012-02-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Mike Reel, Mercer 103 |
2047124 | Primary Facility | 2012-02-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Mike Reel |
2047125 | Primary Facility | 2012-02-22 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. Man - Mike Reel |
2051517 | Primary Facility | 2012-03-12 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. man - Benji Doucet, Waiting on orders. |
2052425 | Primary Facility | 2012-03-06 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | no pressure on 7" OD annulus, packer set at approx. 2000' in 7 OD on 2" pipe, 170# on tbg shut in |
2054745 | Primary Facility | 2012-03-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Checking if vented - no -145 psi |
2054752 | Primary Facility | 2012-03-26 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig has moved off site. No one is on site. Well has not been plugged. Plastic containment is still on site - has holes. Cellar is open, no covering or no barriers around well head. 170 psi on guage. Had spoken to Josh Lawson, Ches., this morning and requested the well be vented. He stated that Ches. was running TA log & deciding what to try next. Also said someone was monitoring the well and would bleed off pressure if it got to a couple hundred pounds. |
2057204 | Primary Facility | 2012-04-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp. man - Benji Doucet |
2060079 | Primary Facility | 2012-04-09 | Drilling/Alteration | No Violations Noted | Ran logs on Sat. Should have a procedure to proceed soon, waiting. |
2062393 | Primary Facility | 2012-02-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 103, Comp. Man - Mike Reel |
2062444 | Primary Facility | 2012-04-25 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Doing squeeze job. Shot holes at 3085', 2885', and 2685'. |
2064907 | Primary Facility | 2012-05-01 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Benji Doucet |
2064914 | Primary Facility | 2012-04-30 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Benji Doucet |
2064929 | Primary Facility | 2012-04-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No comp. man on site. Will be there tomorrow. |
2064994 | Primary Facility | 2012-05-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Benji Doucet |
2066989 | Primary Facility | 2012-05-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Mike Reel |
2067592 | Primary Facility | 2012-05-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, No company man on site |
2076015 | Primary Facility | 2012-06-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Mike Reel |
2076981 | Primary Facility | 2012-06-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Mike Reel |
2076983 | Primary Facility | 2012-06-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man not on site. |
2078682 | Primary Facility | 2012-06-20 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Mike Reel, Comp. Man Waiting on orders. |
2078683 | Primary Facility | 2012-05-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Cement crew expected @ 1 PM. Mrs. Skoronski stated if land is reclaimed, she would like well buried, no vent. |
2080473 | Primary Facility | 2012-06-26 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | No activity today. Gate guard says they should be starting up tomorrow. |
2080475 | Primary Facility | 2012-06-29 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, New Comp Man - Chris Needham - not on site |
2081754 | Primary Facility | 2012-07-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Mike Reel |
2084466 | Primary Facility | 2012-07-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Rig has moved off location. No comp. man on site. Cellar has been dug up & filled in. 3 plastic containments w/ resid. waste on them - covered. Need to be removed. Still large water puddle on site - rain water. All equipment except 1 backhoe has been moved off site. |
2084587 | Primary Facility | 2012-07-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 2 containments with waste on site - covered. Need to be removed from site. |
2084603 | Primary Facility | 2012-07-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Mercer 115, Comp. Man - Chris Needham |
2084607 | Primary Facility | 2012-07-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Comp man - Chris Needham |
2203613 | Primary Facility | 2013-09-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Pressure guage and recorder installed. Pressure is 0 psi at 14:50 pm. |
2203756 | Primary Facility | 2013-09-09 | Plugging(Includes Plugged/Mined Through) | Pending | Never got plugging cert, still active. |
2206416 | Primary Facility | 2013-09-19 | Plugging(Includes Plugged/Mined Through) | Pending | Checked vent w/ gas meter. 3 % methane & 57% LEL comb. |
2207300 | Primary Facility | 2013-09-16 | Plugging(Includes Plugged/Mined Through) | Pending | On site to check plugged well for any gas. Placing gas meter wand inside vert. portion of vent - readings of 16% LEL comb & 0% methane on MSA Altair 5X gas meter. When the wand was placed inside vert. portion of vent and openings to air were covered, got reading of 50% LEL comb and 3 % methane. |
2210985 | Primary Facility | 2013-10-07 | Plugging(Includes Plugged/Mined Through) | Pending | Plugged well. Checked vent w/ MSA Altair meter for gas - 30% of LEL Combustible, and 0%methane. |
2213848 | Primary Facility | 2013-10-18 | Plugging(Includes Plugged/Mined Through) | Pending | Monitoring plugged well. |
2218190 | Primary Facility | 2013-10-28 | Plugging(Includes Plugged/Mined Through) | Pending | 72 hour pressure test in progress since some time last Friday. 2 psi on 0 to 60 psi guage. |
2218191 | Primary Facility | 2013-10-31 | Plugging(Includes Plugged/Mined Through) | Pending | Pressure guage has been removed. Vent is open. |
2425004 | Primary Facility | 2015-11-17 | Administrative/File Review | Pending | Received and reviewed Well Site Restoration report. I will conduct a Follow-Up Inspection of site before concluding results of this inspection. |
2545211 | Primary Facility | 2016-12-16 | Site Restoration | No Viols - Permanently Shut Down |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1962837 | 608048 | 04/04/2011 | 2011-04-04 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | |
1998145 | 618577 | 08/24/2011 | 2011-08-24 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
618577 | 275383 | NOV - Notice of Violation | |||||
618577 | 280578 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-02-15 | 2012-02-15 | $2,000.00 | $2,000.00 |
For data sources see[6]