If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20113 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.596947,"lon":-76.174333,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Windham Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: WARREN 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.596947 | |
Longitude: -76.174333 |
Date | Event |
---|---|
2010-11-10 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1932025 | Primary Facility | 2010-12-04 | Routine/Complete Inspection | No Violations Noted | Site is under construction. Heavy rains occured a few days prior to inspection. Filter Sock at Sediment Trap B has moved and there is evidence of overflow. Similar conditions at Sediment Trap A but not as pronounced. |
1938850 | Primary Facility | 2010-12-22 | Complaint Inspection | No Violations Noted | I investigated a complaint regarding an increase in sediment in the neighboring ponds. The complaint was recieved on 12/17/2010. I conducted an inspection of this site on 12/04/2010 and was concerned about the stability and condition of Sediment Trap B. I mentioned my concerns to Chesapeake. A new filter sock fence has been installed and reinforced at Sediment Trap B. The installation of the new fence may curb the occurence of the sediment. I will continue to monitor the situation in the Spring. |
1941846 | Primary Facility | 2011-01-11 | Complaint Inspection | No Violations Noted | CONDUCTED 046 (MARCELLUS SHALE) SAMPLING AT UNNAMED TRIBUTARY NW OF WELLPAD (41.59768 N, -076.17623 W) |
1951236 | Primary Facility | 2011-02-20 | Routine/Complete Inspection | No Violations Noted | Erosion Control Blanket has been displaced on eastern slope and significant displacement on the south facing slope. Slight displacement of blanket on slopes of the Snyder Impoundment. |
1954174 | Primary Facility | 2011-02-28 | Routine/Complete Inspection | Violation(s) Noted | |
1957103 | Primary Facility | 2011-03-14 | Complaint Inspection | No Violations Noted | |
1958758 | Primary Facility | 2011-03-19 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
1966639 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | Violation(s) & Outstanding Violations | |
1967892 | Primary Facility | 2011-04-25 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
1968946 | Primary Facility | 2011-04-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
1970204 | Primary Facility | 2011-04-28 | Follow-up Inspection | No Violations Noted | |
1975159 | Primary Facility | 2011-05-24 | Follow-up Inspection | No Violations Noted | |
1999251 | Primary Facility | 2011-08-29 | Routine/Complete Inspection | Violation(s) Noted | Post-Hurricaine Irene Inspection. Controls appear to have had performed satisifactorily. Crew was on site pre-storm performing maintenance on E & S Controls. Slopes lack sufficient vegetation and need to be reseeded. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1954174 | 605797 | 02/28/2011 | 2011-02-28 | 78.66A - Failure to report release of substance threatening or causing pollution | Administrative | See Insp ID 1970204, spill area excavated and material removed from site, no evidence of resirual pollution. |
1954174 | 605798 | 02/28/2011 | 2011-02-28 | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | Environmental Health & Safety | See Insp ID 1970204, spill area excavated and material removed from site, no evidence of resirual pollution. |
1954174 | 605799 | 02/28/2011 | 2011-02-28 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | See Insp ID 1970204, spill area excavated and material removed from site, no evidence of resirual pollution. |
1954174 | 608271 | 02/28/2011 | 2011-02-28 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | SWMA 6018.610(1), punctured containment pan allowed release of an oil & grease product to the ground affecting an area approx 40 X 60 from the point source. See Insp ID 1970204, violations resolved. |
1966639 | 609125 | 04/19/2011 | 2011-04-19 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1999251 | 618903 | 08/29/2011 | 2011-08-29 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Fill slope is 70-80% unvegetated. Cut slope is approximately 60% unvegetated. Topsoil on cut slope has almost entirely washed away. Topsoil and reseeding required. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
605797 | 269641 | NOV - Notice of Violation | Comply/Closed | 2011-04-28 | |||
605798 | 269641 | NOV - Notice of Violation | Comply/Closed | 2011-04-28 | |||
605799 | 269641 | NOV - Notice of Violation | Comply/Closed | 2011-04-28 | |||
608271 | 269641 | NOV - Notice of Violation | Comply/Closed | 2011-04-28 |
For data sources see[6]