X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-007-20520"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-007-20520
 
| Well ID: 37-007-20520
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.802503, -80.212733 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.802503, -80.212733 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/21/2018
+
| Spud Date: 2018-03-21
 
|-
 
|-
| Permit Date: 9/19/2017
+
| Permit Date: 2017-09-19
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2019
 
| [[PENNENERGY RESOURCES LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2018-03
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 18.85 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-04
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 78.71 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| PAD085690592
 
|-
 
| 2018-04
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 9.92 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 20.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-09
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 577.56 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| PAD085690592
 
|-
 
| 2018-09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 914.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 539.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
| 2018-10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 20.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 30.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
| 2018-10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 149.17 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 73.33 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.88 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-03
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 3.00 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 2014-541
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2654228
 
| Primary Facility
 
| 2017-10-30
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| On 10/27/2017, WQS Brian MacQuarrie met onsite with Joseph Schwab -Penn Energy for the purpose of conducting a pre- operation inspection. Well permits and ESCGP onsite. All erosion and sedimentation best management practices installed. Site has been stabilized with seed and mulch. No apparent E/S issues.
 
 
As a result of this inspection, drilling activities may commence.
 
|-
 
| 2709169
 
| Primary Facility
 
| 2018-03-23
 
| Drilling/Alteration
 
| No Violations Noted
 
| A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar.
 
|-
 
| 2709969
 
| Primary Facility
 
| 2018-03-26
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Site and access road had been constructed in accordance with the ESCGP.  All site and access road erosion controls had been implemented and maintained properly.  All disturbed slopes and soil stockpiles had been stabilized with vegetation.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Drilling had commenced but was not ongoing at the time of the inspection.  Work was underway onsite for installation of the sound barrier wall to be located onsite.  There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
 
|-
 
| 2712345
 
| Primary Facility
 
| 2018-03-30
 
| Drilling/Alteration
 
| No Violations Noted
 
| Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO
 
|-
 
| 2720875
 
| Primary Facility
 
| 2018-04-20
 
| Drilling/Alteration
 
| No Violations Noted
 
| Highlands rig 9 is drilling top hole at 1,148'.
 
|-
 
| 2722546
 
| Primary Facility
 
| 2018-04-25
 
| Drilling/Alteration
 
| No Violations Noted
 
| Top hole complete at 2,360'. The rig has moved from this well.
 
|-
 
| 2742091
 
| Primary Facility
 
| 2018-06-15
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter.
 
|-
 
| 2776096
 
| Primary Facility
 
| 2018-09-18
 
| Drilling/Alteration
 
| No Violations Noted
 
| Patterson 259 is drilling the curve at 4,962'.
 
|-
 
| 2779393
 
| Primary Facility
 
| 2018-09-25
 
| Drilling/Alteration
 
| No Violations Noted
 
| Patterson 259 ran and cemented 12662' of 5.5" production casing. There were 10 bbls of cement returned to the surface.
 
|-
 
| 2849731
 
| Primary Facility
 
| 2019-03-07
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 298: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 02/03/2019
+
| 2019-02-03
| 02/11/2019
+
| 2019-02-11
 
| style="text-align: right;" | 4935
 
| style="text-align: right;" | 4935
 
| style="text-align: right;" | 15,472,800.0
 
| style="text-align: right;" | 15,472,800.0
Line 642: Line 404:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 569.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 326.27 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 934.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 656.27 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| PAD085690592
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Waste Water Treatment Sludge (in Tons) RWC 804
 +
| style="text-align: right;" | 3.00 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 2014-541
 +
|-
 +
| 2019
 +
| [[PENNENERGY RESOURCES LLC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 15.88 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2654228
 +
| Primary Facility
 +
| 2017-10-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 10/27/2017, WQS Brian MacQuarrie met onsite with Joseph Schwab -Penn Energy for the purpose of conducting a pre- operation inspection. Well permits and ESCGP onsite. All erosion and sedimentation best management practices installed. Site has been stabilized with seed and mulch. No apparent E/S issues.
 +
 +
As a result of this inspection, drilling activities may commence.
 +
|-
 +
| 2709169
 +
| Primary Facility
 +
| 2018-03-23
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar.
 +
|-
 +
| 2709969
 +
| Primary Facility
 +
| 2018-03-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site and access road had been constructed in accordance with the ESCGP.  All site and access road erosion controls had been implemented and maintained properly.  All disturbed slopes and soil stockpiles had been stabilized with vegetation.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Drilling had commenced but was not ongoing at the time of the inspection.  Work was underway onsite for installation of the sound barrier wall to be located onsite.  There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
 +
|-
 +
| 2712345
 +
| Primary Facility
 +
| 2018-03-30
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO
 +
|-
 +
| 2720875
 +
| Primary Facility
 +
| 2018-04-20
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Highlands rig 9 is drilling top hole at 1,148'.
 +
|-
 +
| 2722546
 +
| Primary Facility
 +
| 2018-04-25
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Top hole complete at 2,360'. The rig has moved from this well.
 +
|-
 +
| 2742091
 +
| Primary Facility
 +
| 2018-06-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter.
 +
|-
 +
| 2776096
 +
| Primary Facility
 +
| 2018-09-18
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson 259 is drilling the curve at 4,962'.
 +
|-
 +
| 2779393
 +
| Primary Facility
 +
| 2018-09-25
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson 259 ran and cemented 12662' of 5.5" production casing. There were 10 bbls of cement returned to the surface.
 +
|-
 +
| 2849731
 +
| Primary Facility
 +
| 2019-03-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 08:00, 20 August 2019

Well Details

Well ID: 37-007-20520
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154383
Farm/Lease Name: PER B17 1H
License Status: Active
Spud Date: 2018-03-21
Permit Date: 2017-09-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.802503
Longitude: -80.212733

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-03 2019-02-11 4935 15,472,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS17888 Tight Rock Solutions Friction Reducer Inorganic Salt Proprietary 10 0.00409765 6204
Oxyalkylated Alcohol Proprietary 5 0.00204883 3102
Hydrotreated Light Distillate 64742-47-8 30 0.0122923 18611
Substituted Alkylamine Proprietary 1 0.000409501 620
Water Customer Base Fluid and Mix Water Diethylene glycol 111-46-6 1 0.0206237 31225
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.00012219 185
Isopropanol 67-63-0 5 0.00006143 93
Ethoxylated alcohols Proprietary 10 0.000122419 185.347
Formic Acid 64-18-6 10 0.00012219 185
Ammonium Persulfate 7727-54-0 100 0.000472247 715
Ethylene glycol 107-21-1 40 0.00048942 741
Cinnamaldehyde 104-55-2 10 0.000122419 185.347
Goethite 1310-14-1 0.1 0.0125347 18978
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00024504 371
Biotite 1302-27-8 0.1 0.0125345 18977.7
Water 7732-18-5 100 85.2825 129,121,000.0
Hydrochloric acid 7647-01-0 37 0.763075 1,155,320.0
Crystalline silica (Quartz) 14808-60-7 100 12.5345 18,977,700.0
Calcite 471-34-1 1 0.125345 189777
Apatite 64476-38-6 0.1 0.0125345 18977.7
Tar bases, quinolone derivs 68513-87-1 1 0.00001255 19
TRS805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Proprietary 5 0.00202439 3065
Aliphatic Hydrocarbon Proprietary 30 0.0121477 18392
TRS3001 Tight Rock Solutions Scale Inhibitor Ethylene Glycol 107-21-1 5 0.000909489 1377
Sodium Phosphate, Tribasic 7601-54-9 5 0.000909489 1377
Amine Triphosphate Proprietary 30 0.00545825 8264
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00578916 8765
Other Chemical(s) Listed Above See Trade Name(s) List Biotite 1302-27-8 0.1 0.0125345 18977.7
Goethite 1310-14-1 0.1 0.0125347 18978
Hydrochloric acid 7647-01-0 37 0.763075 1,155,320.0
Substituted Alkylamine Proprietary 1 0.000409501 620
Tar bases, quinolone derivs 68513-87-1 1 0.00001255 19
Isopropanol 67-63-0 5 0.00006143 93
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00024504 371
Alcohol Alkoxylates Proprietary 5 0.00202439 3065
Apatite 64476-38-6 0.1 0.0125345 18977.7
Formic Acid 64-18-6 10 0.00012219 185
Calcite 471-34-1 1 0.125345 189777
Ammonium Persulfate 7727-54-0 100 0.000472247 715
Crystalline silica (Quartz) 14808-60-7 100 12.5345 18,977,700.0
Sodium Phosphate, Tribasic 7601-54-9 5 0.000909489 1377
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.00012219 185
Oxyalkylated Alcohol Proprietary 5 0.00204883 3102
Ethylene Glycol 107-21-1 5 0.000909489 1377
Inorganic Salt Proprietary 10 0.00409765 6204
Diethylene glycol 111-46-6 1 0.0206237 31225
Cinnamaldehyde 104-55-2 10 0.000122419 185.347
Ethoxylated alcohols Proprietary 10 0.000122419 185.347
Ethylene glycol 107-21-1 40 0.00048942 741

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 569.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 326.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste (in Barrels) RWC 803 934.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drill Cuttings (in Tons) RWC 810 656.27 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge (in Tons) RWC 804 3.00 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid (in Barrels) RWC 802 15.88 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2654228 Primary Facility 2017-10-30 Routine/Complete Inspection No Violations Noted On 10/27/2017, WQS Brian MacQuarrie met onsite with Joseph Schwab -Penn Energy for the purpose of conducting a pre- operation inspection. Well permits and ESCGP onsite. All erosion and sedimentation best management practices installed. Site has been stabilized with seed and mulch. No apparent E/S issues.

As a result of this inspection, drilling activities may commence.

2709169 Primary Facility 2018-03-23 Drilling/Alteration No Violations Noted A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar.
2709969 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. Work was underway onsite for installation of the sound barrier wall to be located onsite. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2712345 Primary Facility 2018-03-30 Drilling/Alteration No Violations Noted Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO
2720875 Primary Facility 2018-04-20 Drilling/Alteration No Violations Noted Highlands rig 9 is drilling top hole at 1,148'.
2722546 Primary Facility 2018-04-25 Drilling/Alteration No Violations Noted Top hole complete at 2,360'. The rig has moved from this well.
2742091 Primary Facility 2018-06-15 Routine/Complete Inspection No Violations Noted At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter.
2776096 Primary Facility 2018-09-18 Drilling/Alteration No Violations Noted Patterson 259 is drilling the curve at 4,962'.
2779393 Primary Facility 2018-09-25 Drilling/Alteration No Violations Noted Patterson 259 ran and cemented 12662' of 5.5" production casing. There were 10 bbls of cement returned to the surface.
2849731 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.

For data sources see[7]

References