Well Details

Well ID: 37-007-20520
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154383
Farm/Lease Name: PER B17
License Status:
Spud Date:
Permit Date: 2017-09-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.802503
Longitude: -80.212733

For data sources see[1][2][3]

Well History

Date Event
2017-09-19 New Permit Application
2018-03-21 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-03 2019-02-11 4,935 15,472,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS17888 Tight Rock Solutions Friction Reducer Inorganic Salt Proprietary 10 0.00409765 6204
Oxyalkylated Alcohol Proprietary 5 0.00204883 3102
Hydrotreated Light Distillate 64742-47-8 30 0.0122923 18611
Substituted Alkylamine Proprietary 1 0.000409501 620
Water Customer Base Fluid and Mix Water Diethylene glycol 111-46-6 1 0.0206237 31225
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.00012219 185
Isopropanol 67-63-0 5 0.00006143 93
Ethoxylated alcohols Proprietary 10 0.000122419 185.347
Formic Acid 64-18-6 10 0.00012219 185
Ammonium Persulfate 7727-54-0 100 0.000472247 715
Ethylene glycol 107-21-1 40 0.00048942 741
Cinnamaldehyde 104-55-2 10 0.000122419 185.347
Goethite 1310-14-1 0.1 0.0125347 18978
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00024504 371
Biotite 1302-27-8 0.1 0.0125345 18977.7
Water 7732-18-5 100 85.2825 129,121,000.0
Hydrochloric acid 7647-01-0 37 0.763075 1,155,320.0
Crystalline silica (Quartz) 14808-60-7 100 12.5345 18,977,700.0
Calcite 471-34-1 1 0.125345 189777
Apatite 64476-38-6 0.1 0.0125345 18977.7
Tar bases, quinolone derivs 68513-87-1 1 0.00001255 19
TRS805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Proprietary 5 0.00202439 3065
Aliphatic Hydrocarbon Proprietary 30 0.0121477 18392
TRS3001 Tight Rock Solutions Scale Inhibitor Ethylene Glycol 107-21-1 5 0.000909489 1377
Sodium Phosphate, Tribasic 7601-54-9 5 0.000909489 1377
Amine Triphosphate Proprietary 30 0.00545825 8264
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00578916 8765
Other Chemical(s) Listed Above See Trade Name(s) List Biotite 1302-27-8 0.1 0.0125345 18977.7
Goethite 1310-14-1 0.1 0.0125347 18978
Hydrochloric acid 7647-01-0 37 0.763075 1,155,320.0
Substituted Alkylamine Proprietary 1 0.000409501 620
Tar bases, quinolone derivs 68513-87-1 1 0.00001255 19
Isopropanol 67-63-0 5 0.00006143 93
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00024504 371
Alcohol Alkoxylates Proprietary 5 0.00202439 3065
Apatite 64476-38-6 0.1 0.0125345 18977.7
Formic Acid 64-18-6 10 0.00012219 185
Calcite 471-34-1 1 0.125345 189777
Ammonium Persulfate 7727-54-0 100 0.000472247 715
Crystalline silica (Quartz) 14808-60-7 100 12.5345 18,977,700.0
Sodium Phosphate, Tribasic 7601-54-9 5 0.000909489 1377
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.00012219 185
Oxyalkylated Alcohol Proprietary 5 0.00204883 3102
Ethylene Glycol 107-21-1 5 0.000909489 1377
Inorganic Salt Proprietary 10 0.00409765 6204
Diethylene glycol 111-46-6 1 0.0206237 31225
Cinnamaldehyde 104-55-2 10 0.000122419 185.347
Ethoxylated alcohols Proprietary 10 0.000122419 185.347
Ethylene glycol 107-21-1 40 0.00048942 741

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drill Cuttings 656.27 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 326.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 934.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 569.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Filter Socks 0.89 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 1.20 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 3.00 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 43.47 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,036.54 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.70 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2654228 Primary Facility 2017-10-30 Routine/Complete Inspection No Violations Noted On 10/27/2017, WQS Brian MacQuarrie met onsite with Joseph Schwab -Penn Energy for the purpose of conducting a pre- operation inspection. Well permits and ESCGP onsite. All erosion and sedimentation best management practices installed. Site has been stabilized with seed and mulch. No apparent E/S issues.

As a result of this inspection, drilling activities may commence.

2709169 Primary Facility 2018-03-23 Drilling/Alteration No Violations Noted A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar.
2709969 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. Work was underway onsite for installation of the sound barrier wall to be located onsite. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2712345 Primary Facility 2018-03-30 Drilling/Alteration No Violations Noted Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO
2720875 Primary Facility 2018-04-20 Drilling/Alteration No Violations Noted Highlands rig 9 is drilling top hole at 1,148'.
2722546 Primary Facility 2018-04-25 Drilling/Alteration No Violations Noted Top hole complete at 2,360'. The rig has moved from this well.
2742091 Primary Facility 2018-06-15 Routine/Complete Inspection No Violations Noted At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter.
2776096 Primary Facility 2018-09-18 Drilling/Alteration No Violations Noted Patterson 259 is drilling the curve at 4,962'.
2779393 Primary Facility 2018-09-25 Drilling/Alteration No Violations Noted Patterson 259 ran and cemented 12662' of 5.5" production casing. There were 10 bbls of cement returned to the surface.
2849731 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.

For data sources see[8]