Well ID: 37-111-20311
Loading map...
County: Somerset
Municipality: Addison Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 2H
First Permit Date: 2012-07-23
Last Permit Date: 2012-07-23
Spud Date: 2012-10-31
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.743672
Longitude: -79.357552

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 29102.0 28.0 0.0 0.0 0.0 0.0
2015-01 29346.0 9.0 0.0 0.0 0.0 0.0
2015-03 17382.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILL CUTTINGS 296.16 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-1 DRILL CUTTINGS 492.74 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2013-1 DRILLING FLUID WASTE 88.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 DRILLING FLUID WASTE 468.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 DRILL CUTTINGS 472.78 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2013-2 FRACING FLUID WASTE 95.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 11.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 FLOWBACK FRACTURING SAND 58.23 Tons LANDFILL 76-00-08 WASTE MANAGEMENT, INC - AMERICAN LANDFILL, INC WAYNESBURG OH
2014-2 FRACING FLUID WASTE 28.33 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 FRACING FLUID WASTE 2.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 PRODUCED FLUID 70.83 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2121597 2012-11-28 No Violations Noted Inspection result of spud notification. Multi-well pad.

Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site. At the time of this inspection, cellar for 2H constructed. Actively drilling 5H, 1H had been drilled, cellars for 3H,4H constructed, 6H staked. Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch. Observed tophole cuttings along soil pile. Department spoke with company representative who stated plans were to incorporate cuttings into soil pile and disperse across pad. Operator will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation. Access road adequately rocked and no E&S issues were noted in relation to access road. Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.

2123100 2012-12-12 No Violations Noted Conductor pipe set in well. currently, chevron drilling 2H well.
2127509 2012-12-17 In Compliance with Policy Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 12/17/12. According to Mr. Small, one quart of frac lubricant was spilled on 12/16/12 and it was immediately removed from the ground and placed with the cuttings. It appears that Operator handled the situation according to policy and a follow-up inspection will be conducted in the future to ensure full compliance.
2128460 2012-12-17 No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor casing was set at 38feet from grade with 30 sacks of Type I (24ヤ pipe). Water Protection pipe (16ヤ) was set at 413 feet and was cemented with 421 sacks of Class A with 17 bbl. of return cement. Coal protection pipe (11 ᄒヤ) was set at 648 feet. Cement basket was set at 562 feet. A total of 340 sacks of Class A cement were used on the pipe with 19 bbl. return.
2128633 2013-01-08 No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor casing was set at 38feet from grade with 30 sacks of Type I (24ヤ pipe). Water Protection pipe (16ヤ) was set at 413 feet and was cemented with 421 sacks of Class A with 17 bbl. of return cement. Coal protection pipe (11 ᄒヤ) was set at 648 feet. Cement basket was set at 562 feet. A total of 340 sacks of Class A cement were used on the pipe with 19 bbl. return. Intermediate pipe (8 5/8ヤ) was set at 2,379 feet and was cemented with 623 sacks of Class A with 25 bbl. Return. Well was drilled to 7180 feet (KOP).
2130316 2013-01-14 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 5H.
2143495 2013-02-11 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
2143510 2013-02-22 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H.
2144631 2013-02-25 No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 2H spudded, TD not yet reached. 1H had been drilled. 3H, 4H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121597) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted. Department recommends that Operator remove debris from rock-lined ditches.
2151604 2013-03-13 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2169715 2013-05-22 No Violations Noted
2173634 2013-06-10 No Violations Noted Routine inspection no issues noted.
2228153 2013-11-26 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.

At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.


2228303 2013-10-31 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2228709 2013-10-09 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.


2229842 2013-09-26 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was setting up to drill 4HA.


2235855 2014-01-13 No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.

The entrance road to the well pad was well graveled. No mud was being drug out onto the main road.

Checked in with the guard.

Walked over the impoundment and met with Harvey Horner with Nuverra. Nuverra was working on the small truck turn around pad that is adjacent and on the Northern side of the impoundment. They were adding stone to the pad.

Walked over to the well pad. The well pad was inspected.

The # 1 well was not marked. Please mark this well and notify this inspector when the well is marked.

Large plastic pipe was being unloaded onto the well pad.

No signs of spills were noticed on the well pad.

2244504 2014-02-10 No Violations Noted Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary.
2250975 2014-03-05 No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.

The sign was correctly marked.

No mud was being drug out to the main road.

Checked in with the guard and donned the required PPE.

They were preparing the well pad for the frack equipment that will be coming on site. A road leading up to the Caymen pipeline was being reworked. This will allow the Caymen workers will have access to the pipeline.

A minor gas leak was observed at the Caymen pipeline. Chevron called Caymen and a Caymen worker responded to the site and repaired the leak.

The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.

2252439 2014-03-10 No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.

The sign was correctly marked.

No mud was being drug out to the main road.

Checked in with the guard and donned the required PPE.

They were preparing the well pad for the frack equipment that will be coming on site.

A road leading up to the Caymen pipeline was  reworked. This will allow the Caymen workers will have access to the pipeline.

The equipment on site was checked for leaks. No leaks were observed. No staining on the lined well pad was observed.

2311109 2014-10-08 No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.

For data sources see[3]