Well Details

Well ID: 37-111-20311
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 2H
License Status:
Spud Date: 2012-11-03
Permit Date: 2012-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.743672
Longitude: -79.357553

For data sources see[1][2][3]

Well History

Date Event
2012-07-23 New Permit Application
2012-10-31 Performed Spud Operation
2013-12-11 Drilling Completion
2014-08-21 Perforation
2016-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-21 2014-08-30 8,896 6,544,360

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 11.9284 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00030254 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00348919 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0008022 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00729434 0
J580 Schlumberger Gelling Agent Carboydrate polymer Proprietary 100 0.0311734 0
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00141717 0
Dibromoacetonitrile 3252-43-5 5 0.0001181 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00070859 0
B466 Schlumberger Friction Reducer Ammonium Acetate 631-61-8 6 0.00014043 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00070213 0
Alcohol Ethoxylates Proprietary 5 0.00011702 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 87.9111 0
J134 Schlumberger Gel Breaker Hemicellulase Enzyme 9012-54-8 100 0.00151269 0
A264 Schlumberger Iron Control Prop-2-yn-1-ol 107-19-7 10 0.00000979 0
Aliphatic acids Proprietary 30 0.00002936 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00002936 0
Methanol 67-56-1 40 0.00003915 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 716,244.00 343 0.00 0 0.00 0
2016 LPR ENERGY LLC 389,348.79 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 415,837.00 362 0.00 0 0.00 0
2018 LPR ENERGY LLC 417,761.00 360 0.00 0 0.00 0
2019 LPR ENERGY LLC 361,038.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 296.16 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,140.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 88.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 472.78 Tons LANDFILL 100172
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 95.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 492.74 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 468.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 82.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 58.23 Tons LANDFILL 76-00-08
2015 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 23.48 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 10,916.84 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 LPR ENERGY LLC Produced Fluid 217.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 448.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 LPR ENERGY LLC Produced Fluid 24.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC Produced Fluid 1,069.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 208.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 LPR ENERGY LLC Produced Fluid 1,023.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 228.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 507.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 1,013.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 213.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 LPR ENERGY LLC Produced Fluid 1,962.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 163.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2121597 Primary Facility 2012-11-28 Routine/Complete Inspection No Violations Noted Inspection result of spud notification. Multi-well pad.
2123100 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted Conductor pipe set in well. currently, chevron drilling 2H well.
2127509 Primary Facility 2012-12-17 Incident- Response to Accident or Event In Compliance with Policy Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 12/17/12. According to Mr. Small, one quart of frac lubricant was spilled on 12/16/12 and it was immediately removed from the ground and placed with the cuttings. It appears that Operator handled the situation according to policy and a follow-up inspection will be conducted in the future to ensure full compliance.
2128460 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor casing was set at 38feet from grade with 30 sacks of Type I (24” pipe). Water Protection pipe (16”) was set at 413 feet and was cemented with 421 sacks of Class A with 17 bbl. of return cement. Coal protection pipe (11 ¾”) was set at 648 feet. Cement basket was set at 562 feet. A total of 340 sacks of Class A cement were used on the pipe with 19 bbl. return.
2128633 Primary Facility 2013-01-08 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor casing was set at 38feet from grade with 30 sacks of Type I (24” pipe). Water Protection pipe (16”) was set at 413 feet and was cemented with 421 sacks of Class A with 17 bbl. of return cement. Coal protection pipe (11 ¾”) was set at 648 feet. Cement basket was set at 562 feet. A total of 340 sacks of Class A cement were used on the pipe with 19 bbl. return. Intermediate pipe (8 5/8”) was set at 2,379 feet and was cemented with 623 sacks of Class A with 25 bbl. Return. Well was drilled to 7180 feet (KOP).
2130316 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 5H.
2143495 Primary Facility 2013-02-11 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
2143510 Primary Facility 2013-02-22 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H.
2144631 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 2H spudded, TD not yet reached. 1H had been drilled. 3H, 4H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121597) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted. Department recommends that Operator remove debris from rock-lined ditches.
2151604 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2169715 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2173634 Primary Facility 2013-06-10 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2228153 Primary Facility 2013-11-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
2228303 Primary Facility 2013-10-31 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H.
2228709 Primary Facility 2013-10-09 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2229842 Primary Facility 2013-09-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was setting up to drill 4HA.
2235855 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244504 Primary Facility 2014-02-10 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary.
2250975 Primary Facility 2014-03-05 Routine/Complete Inspection No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
2252439 Primary Facility 2014-03-10 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2298105 Primary Facility 2014-08-20 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2311109 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408929 Primary Facility 2015-09-18 Routine/Complete Inspection No Violations Noted At time of inspection, well tag present and legible.
2486264 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted no issues. system running
2532222 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running
2549708 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.

2594468 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2594582 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2626053 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues.
2656130 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running no,issues
2672030 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running. No,issues
2672073 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685380 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700751 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700818 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719551 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766912 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.