If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-60423 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25676097,"lon":-81.5809515,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: CUYAHOGA VALLEY NATIONAL PARK | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 41.25676097 | |
Longitude: -81.5809515 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1291069085 | 2010-11-26 | The well was plugged and abandoned on 11/24. On 11/26, the well was inspected and the top of cement was approximately 11.5' below ground level. Water in the hole was approximately 3' below ground level and there was no visible evidence of gas leaking through the cement. I advised the contractor that they can fill the 7 casing from 11.5' to 3' before cutting off and plating the well as required. | ||||
2074907021 | 2010-11-23 | Moore Well Service has a service rig on site to plug and abandon this orphan well. Plugging is scheduled for tomorrow morning and should be completed by the end of the day. No violations at this time. |
For data sources see[1]