If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.508319,"lon":-79.706652,"icon":""}]} |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2011-01-27 | |
Last Permit Date: 2011-01-27 | |
Spud Date: 2011-04-15 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.508319 | |
Longitude: -79.706652 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 6580.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8229.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 5969.0 | 184.0 | 0.0 | 0.0 | 72.3 | 184.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | DRILLING FLUID WASTE | 1598.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | FRACING FLUID WASTE | 240.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2013-0 | PRODUCED FLUID | 40.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1961867 | 2011-03-18 | No Violations Noted | On March 18th, 2011 I visited this site as a routine inspection. Drilling has not yet started. Construction of the pad was underway. The access road was in ok condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. Pits were constructed. Some water was beginning to collect in the pits. Drill cutting disposal should be monitired to be sure they are not placed within the seasonal high water table, No accelerated erosion was observed at the time of inspection. | |
1975539 | 2011-04-15 | No Violations Noted | On April 15th, 2011 I visited this site as a routine inspection. Drilling has not yet started. Equipment was moving onsite. The access road was in ok condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. No accelerated erosion was observed at the time of inspection. | |
1976429 | 2011-04-25 | No Violations Noted | DRILLING COMPLETE. WEATHERFORD IS LOGGING WELL.
SITE, PIT, E&S, AND ACCESS, OK. |
|
1976437 | 2011-04-20 | No Violations Noted | USE RIG #7 DRILLING AT 1190'.
SITE, PIT, E&S, AND ACCESS, OK. |
|
1976441 | 2011-04-18 | No Violations Noted | 20" CEMENTED ON 4/17/11. USE RIG #7 STARTING UP TO RESUME DRILLING. | |
1983662 | 2011-04-19 | No Violations Noted | On April 19th, 2011 I visited this site as a routine inspection. Drilling has started. Additional rock was being added to the access road A Site ID and E&S plan were posted onsite. E&S controls were in place. The pit appeared to be in good condition and had adequate freeboard. No accelerated erosion was observed at the time of inspection. | |
1983742 | 2011-04-28 | No Violations Noted | On April 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. The pit was open, contained fluids, and appeared to be in good condition and had adequate freeboard. No accelerated erosion was observed at the time of inspection. | |
1991689 | 2011-07-11 | No Violations Noted | THIS GAS WELL IS COMPLETE.
PRODUCTION EQUIPTMENT IS HOOKED UP. SITE IS RESTORED. |
|
1993501 | 2011-08-04 | No Violations Noted | On August 4th, 2011 I visited this site as a routine inspection. Drilling was completed. The well was in production. The access road was in good condition. A Site ID and E&S plan were still posted onsite. A well tag was present. One tank was surrounded with a dike. The site was restored and vegetation was coming in nicely. No accelerated erosion was observed at the time of inspection. | |
2111656 | 2012-10-31 | No Violations Noted | John Ley WQS, SWRO was on site to conduct an inspection. At the time of the inspection, the well site sign and label were on site. The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. There were no erosion or sedimentation issues. The area around the pad meets the 70% uniform vegetative coverage. |