X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22972

Well Details

Well ID: 34-153-22972
Loading map...
County: Summit
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-02-14
Unconventional: No
Configuration: Vertical
Well Status: Plugged and Abandoned
Violations: 0
Latitude: 40.97335075
Longitude: -81.63958239

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2006-0 6260.0 15.0
2007-0 7495.0 0.0
2008-0 3196.0 0.0
2009-0 2413.0 0.0
2010-0 1772.0 0.0
2011-0 1396.0 0.0
2012-0 1388.0 0.0
2013-0 816.0 70.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1140118861 2006-02-14 Wildcat Drilling is on the location and Daley Excavating has started digging the pits. No violations at this time.
-1489791325 2008-12-18 Status check inspection found no violations at this time.
1876905650 2006-03-03 No change in the location since the last inspection. The pits are open and according to Doug Gonzalez, will be solidified on or about March 15.
-1916884268 2006-03-15 Daley Excavating and Chemtech were on site to solidify the drilling pits. No violations at this time.
-210668805 2006-07-12 Preliminary restoration is approved.
256553276 2006-02-21 Drilling rig has moved off. The pits are lined and fenced. No violations at this time.
-448190492 2006-02-17 Wildcat drilling ahead. Pits are lined and in good condition. The rig did encounter some water flow from the Bass Island interval but was able to continue drilling by starting to soap at 2695'. The excess water was transferred from the pits to the frac tanks and was then disposed by Pander Trucking. It does not appear that there is any significant communication between this well and the PPG solution mine.
-600162301 2006-02-10 Gonzoil and Daley Excavating are on site building the lease road and scraping the topsoil. The drilling rig should arrive the first of next week.
-864263411 2006-04-25 The tank battery has been set and the fence post have been cemented. The site has been graded and will be ready for planting in the near future. No violations at this time.
-952903287 2006-02-15 On site to witness the BOP test before drilling out from under surface. The test began at 750 psi. After 15 minutes, the pressure had declined to 720 psi. The BOP test was successful.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.