X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23065"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23065
 
| Well ID: 34-153-23065
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.22899394, -81.44212617 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.22, -81.44 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Summit County, Ohio|Summit]]
+
| Country: United States
 +
|-
 +
| State: Ohio
 +
|-
 +
| County: <County>
 
|-
 
|-
 
| Municipality:  
 
| Municipality:  
 
|-
 
|-
| Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]]
+
| Operator Name: [[OHIO VALLEY ENERGY SYSTEMS COR]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: MCGREGOR
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2008-10-03
 
|-
 
|-
 
| Spud Date: 2009-02-19
 
| Spud Date: 2009-02-19
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[WILDCAT DRILLING]]
|-
 
| Configuration: Vertical
 
 
|-
 
|-
| Well Status: Producing
+
| Final Drill Date: 2009-02-25
 
|-
 
|-
| Violations: 0
+
| Well Total Depth: 4345.00 ft
 
|-
 
|-
| Latitude: 41.22899394
+
| Configuration: Directional
 
|-
 
|-
| Longitude: -81.44212617
+
| Latitude: 41.220000
 
|-
 
|-
 +
| Longitude: -81.440000
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | GAS QUANTITY
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comment
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2009-0
+
| APP
| style="text-align:right;" | 1248.0
+
| 2008-10-03
|  
+
| Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:10/3/2008, Expired Date:10/3/2009 6:00:00 AM, Drilling unit acres:22.95, Proposed Well Type:OG, Proposed Well Class:POOL
|  
+
|-
|  
+
| Reached Total Depth
| style="text-align:right;" | 201.0
+
| 2009-02-25
|
+
|
 +
|-
 +
| Correction to Well
 +
| 2009-04-24
 +
| AS DRILLED SURVEY CORRECTIONS TO TARGET INFORMATION: FOOTAGE= 720'NL & 380'WL OF LOT 36; X=2,291,775 AND Y= 571,515.
 
|-
 
|-
 +
| Completion Report Received
 +
| 2009-06-17
 +
 
|-
 
|-
| 2010-0
+
| Construction Permit Expires
| style="text-align:right;" | 3185.0
+
| 2009-10-03
|
+
|
|
 
|
 
| style="text-align:right;" | 391.0
 
|  
 
 
|-
 
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
 
|-
 
|-
| 2011-0
+
|}
| style="text-align:right;" | 1668.0
+
For data sources see<ref>{{cite web
|  
+
| title = Risk Based Data Management System - Well and WellHistry Tables
|  
+
|publisher = [[Ohio Department of Natural Resources]]
|
+
| date = 2020-11-16
| style="text-align:right;" | 147.0
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|
+
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
 +
| 2009-09-22
 +
| style="text-align: right;" | 4072
 +
| style="text-align: right;" | 4150
 +
| style="text-align: right;" | 80
 
|-
 
|-
| 2012-0
 
| style="text-align:right;" | 1408.0
 
 
|  
 
|  
 +
| style="text-align: right;" | 4072
 +
| style="text-align: right;" | 4150
 +
| style="text-align: right;" | 80
 +
|-
 
|  
 
|  
|  
+
| style="text-align: right;" | 4072
| style="text-align:right;" | 186.0
+
| style="text-align: right;" | 4150
|  
+
| style="text-align: right;" | 80
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
| 2013-0
+
|}-->
| style="text-align:right;" | 869.0
+
<!--==== Fluid Composition Data ====
|  
+
{| class="wikitable sortable" style="width: 100%"
|  
+
!scope="col" style="text-align: center"| Job Number
|  
+
!scope="col" style="text-align: center"| Trade Name
| style="text-align:right;" | 133.0
+
!scope="col" style="text-align: center"| Supplier
|  
+
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 2014-0
 
| style="text-align:right;" | 976.0
 
| style="text-align:right;" | 365.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 8
 +
| style="text-align: right;" | 2679 Bbl
 +
| style="text-align: right;" | 79000
 
|  
 
|  
| style="text-align:right;" | 151.0
+
| 1000 GALLONS IC ACID
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblStimulation Table
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Period
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 2009
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 1248.00
 +
| style="text-align: right;" | 201.00
 +
| style="text-align: right;" | 74
 +
|-
 +
| 2010
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 3185.00
 +
| style="text-align: right;" | 391.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 1668.00
 +
| style="text-align: right;" | 147.00
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1236001351
+
| 2012
| 2009-02-24
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| style="text-align: right;" | 1408.00
| Wildcat is drilling ahead at 3560. They should TD the well tomorrow and move on Thursday 2/26. The pits are fenced and lined as required.
+
| style="text-align: right;" | 186.00
|  
+
| style="text-align: right;" | 366
|  
+
|-
|  
+
| 2013
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 869.00
 +
| style="text-align: right;" | 133.00
 +
| style="text-align: right;" | 365
 
|-
 
|-
 +
| 2014
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 151.00
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1237824214
+
| 2015
| 2009-03-17
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| style="text-align: right;" | 3350.00
| Frac job begun last week was completed today. The casing patch held and there was no evidence of any problem with the 4-1/2 casing.
+
| style="text-align: right;" | 233.00
|  
+
| style="text-align: right;" | 365
|
 
|  
 
 
|-
 
|-
 +
| 2016
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 3571.00
 +
| style="text-align: right;" | 103.00
 +
| style="text-align: right;" | 310
 
|-
 
|-
| 1238770714
+
| 2017
| 2009-03-31
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| style="text-align: right;" | 3931.00
| The tank battery location is being built and site restoration has started with rough grading and filling. The repair of the damaged asphalt parking lot is also being scheduled. No violations at this time.
+
| style="text-align: right;" | 100.00
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2018
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| style="text-align: right;" | 3931.00
 +
| style="text-align: right;" | 138.00
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1252080904
+
|}
| 2009-02-11
+
For data sources see<ref>{{cite web
|  
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
| Don's Excavating is on site building the lease road and the drilling location. The rig is scheduled to arrive next week. The required identification and permit are posted at the entrance.
+
|publisher = [[Ohio Department of Natural Resources]]
|  
+
| date =  2020-11-16
|  
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|  
+
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
| 2009
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| Brine
 +
| style="text-align: right;" | 3294
 +
| style="text-align: right;" | 74
 
|-
 
|-
| -128923744
+
| 2010
| 2009-03-09
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| Brine
| The pits have been solidified and closed. The frac tanks are on site and the frac job is scheduled for tomorrow. No violations at this time.
+
| style="text-align: right;" | 155
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2011
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| Brine
 +
| style="text-align: right;" | 28
 +
| style="text-align: right;" | 365
 
|-
 
|-
| -1588865200
+
| 2012
| 2009-05-11
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| Brine
| The wellhead and tank battery have been painted and the site has been graded. The well can be turned on as soon as the required fencing has been installed.
+
| style="text-align: right;" | 33
|  
+
| style="text-align: right;" | 366
|  
 
|  
 
 
|-
 
|-
 +
| 2013
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| Brine
 +
| style="text-align: right;" | 47
 +
| style="text-align: right;" | 365
 
|-
 
|-
| -1732710277
+
| 2014
| 2009-03-11
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| Brine
| Baker Atlas was on site to run a cement bond log and a casing integrity log. The bond log indicated that the top of cement is into the salt section. The integrity log indicated that there is a split in the casing from 424' to 426'. Atlas set a retrievable bridge plug at 3525' and cut off the 4-1/2 at 462' which is in the first full joint below the split. The next step will involve setting a 4-1/2 overshot on the cut end and pressure testing the repair before rescheduling the frac job.
+
| style="text-align: right;" | 270
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2015
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| Brine
 +
| style="text-align: right;" | 627
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 183739604
+
| 2016
| 2009-02-27
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| Brine
| The drilling rig has moved off site. The pits are fenced and lined but need to be pumped down. According to Don Nething with Ohio Valley, the fluid level in the pits will be lowered today.
+
| style="text-align: right;" | 58
|  
+
| style="text-align: right;" | 310
|  
 
|  
 
 
|-
 
|-
 +
| 2017
 +
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
 +
| Brine
 +
| style="text-align: right;" | 64
 +
| style="text-align: right;" | 365
 
|-
 
|-
| -2079987
+
| 2018
| 2009-02-02
+
| [[OHIO VALLEY ENERGY SYSTEMS COR]]
|  
+
| Brine
| Don's Excavating is on site building the lease road and grading the location. The rig is scheduled to arrive within the next few weeks. The required signage and the drilling permit have been posted.
+
| style="text-align: right;" | 145
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
| 2106031115
+
| -128923744
| 2009-08-13
+
| 2009-3-9 0:00:0
 +
| DD
 +
| No Violations
 
|  
 
|  
| Preliminary restoration is approved.
+
|-
 +
| -1588865200
 +
| 2009-5-11 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -1732710277
 +
| 2009-3-11 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -2079987
 +
| 2009-2-2 0:00:0
 +
| DD
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| -51371437
 +
| 2009-4-28 0:00:
 +
| DD
 +
| No Violations
 +
|
 
|-
 
|-
| 355265129
+
| -554657247
| 2009-02-18
+
| 2009-3-19 0:00:
|
+
| DD
| Wildcat Drilling is moving on the location and will spud the well tomorrow morning. Both the conductor casing and the surface casing will be cemented to surface.
+
| No Violations
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 +
| 0002079987
 +
| 2009-02-02
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Dons Excavating is on site building the lease road and grading the location. The rig is scheduled to arrive within the next few weeks. The required signage and the drilling permit have been posted.
 
|-
 
|-
| -51371437
+
| 0051371437
 
| 2009-04-28
 
| 2009-04-28
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Dons Excavating is on site to grade the site. The tank battery has been built but the required fencing is not in place.
 
| Dons Excavating is on site to grade the site. The tank battery has been built but the required fencing is not in place.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0128923744
 +
| 2009-03-09
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The pits have been solidified and closed. The frac tanks are on site and the frac job is scheduled for tomorrow. No violations at this time.
 +
|-
 +
| 0183739604
 +
| 2009-02-27
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The drilling rig has moved off site. The pits are fenced and lined but need to be pumped down. According to Don Nething with Ohio Valley, the fluid level in the pits will be lowered today.
 +
|-
 +
| 0355265129
 +
| 2009-02-18
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Wildcat Drilling is moving on the location and will spud the well tomorrow morning. Both the conductor casing and the surface casing will be cemented to surface.
 
|-
 
|-
| 551119010
+
| 0551119010
 
| 2009-03-10
 
| 2009-03-10
|  
+
| Drill / Deepen /  Reopen
| At 10:36 am on 3/10, I received a call from Dale Nething with OVE reporting an unknown failure at the well site and requesting my immediate response. I arrived on site at approximately 11:15 and met with Rick Liddle and Tom Wood. Universal Well Service was on site to frac the well and J-Well was on site with the service rig. According to Rick Liddle, the well broke at 1200 psi. Universal balled off and then shut down for 30 minutes for the balls to fall off. Universal started in with the nitrogen foam pad and had mixed and displaced approximately 2/3 of the planned volume (250,000 scf). The pressure was 2230 psi when the well started circulating gas out the backside. Universal shut down immediately and J-Well plumbed both the 4-1/2 and the backside directly into a 300 bbl frac tank. According to Tom Wood, the 4-1/2 casing came from McJunkin and was classified as limited service, 11.6 ppf tested to 4900 psi. The limited service designation was due to mixed R-2 and R-3 lengths. Reportedly, at no time was the backside shut in. The frac crew was released and Universal sent a pickup truck with a wireline spool and a pump truck to pump a flag down hole to try an locate the problem. Universal pumped 31 bbl and displaced the flag to 426'. The well never circulated fluid but was gasing (presumably nitrogen). The maximum pressure was 150 psi at a maximum rate of 4 bpm. The well was plumbed into a frac tank and left open over night. Baker Atlas will be on site tomorrow to run 1) cement bond log, 2) casing integrity log, 3) retrievable bridge plug and 4) a casing cutter in the first joint below the bad spot.
+
| No Violations
|
+
| At 10:36 am on 3/10, I received a call from Dale Nething with OVE reporting an unknown failure at the well site and requesting my immediate response. I arrived on site at approximately 11:15 and met with Rick Liddle and Tom Wood. Universal Well Service was on site to frac the well and J-Well was on site with the service rig. According to Rick Liddle, the well broke at 1200 psi. Universal balled off and then shut down for 30 minutes for the balls to fall off. Universal started in with the nitrogen foam pad and had mixed and displaced approximately 2/3 of the planned volume (250,000 scf). The pressure was 2230 psi when the well started circulating gas out the backside. Universal shut down immediately and J-Well plumbed both the 4-1/2 and the backside directly into a 300 bbl frac tank. According to Tom Wood, the 4-1/2 casing came from McJunkin and was classified as limited service, 11.6 ppf tested to 4900 psi. The limited service designation was due to mixed R-2 and R-3 lengths. Reportedly, at no time was the backside shut in. The frac crew was released and Universal sent a pickup truck with a wireline spool and a pump truck to pump a flag down hole to try an locate the problem. Universal pumped 31 bbl and displaced the flag to 426. The well never circulated fluid but was gasing (presumably nitrogen). The maximum pressure was 150 psi at a maximum rate of 4 bpm. The well was plumbed into a frac tank and left open over night. Baker Atlas will be on site tomorrow to run 1) cement bond log, 2) casing integrity log, 3) retrievable bridge plug and 4) a casing cutter in the first joint below the bad spot.
|
 
|
 
 
|-
 
|-
|-
+
| 0554657247
| -554657247
 
 
| 2009-03-19
 
| 2009-03-19
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The well was fraced on 3/18. Today, J-Well ran tubing and continued to flow back the well.
 
| The well was fraced on 3/18. Today, J-Well ran tubing and continued to flow back the well.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0584056619
| 584056619
 
 
| 2009-06-18
 
| 2009-06-18
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The affected area has been graded and the fence posts are in place. The well can be turned on as soon as the fencing is installed.
 
| The affected area has been graded and the fence posts are in place. The well can be turned on as soon as the fencing is installed.
 +
|-
 +
| 0756256346
 +
| 2009-02-19
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Wildcat is drilling the conductor hole. The suction pit has been dug and lined and Dons Excavating is digging the blow pit. Should be ready to run and cement conductor casing later today.
 +
|-
 +
| 1236001351
 +
| 2009-02-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Wildcat is drilling ahead at 3560. They should TD the well tomorrow and move on Thursday 2/26. The pits are fenced and lined as required.
 +
|-
 +
| 1237824214
 +
| 2009-03-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Frac job begun last week was completed today. The casing patch held and there was no evidence of any problem with the 4-1/2 casing.
 +
|-
 +
| 1238770714
 +
| 2009-03-31
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The tank battery location is being built and site restoration has started with rough grading and filling. The repair of the damaged asphalt parking lot is also being scheduled. No violations at this time.
 +
|-
 +
| 1252080904
 +
| 2009-02-11
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Dons Excavating is on site building the lease road and the drilling location. The rig is scheduled to arrive next week. The required identification and permit are posted at the entrance.
 +
|-
 +
| 1524766959
 +
| 2018-04-26
 +
| UrbanProduction Wells
 +
| No Violations
 +
| Access to the wellhead and tank battery was on paved and graveled surfaces. The well was operated as an electric pumping well. A locked board on board fence secured the well. I.D. signage was posted and legible. The wellhead had some lubricating oil on it from the polish rod lubricator. The 8.625 X 4.5 annular space was monitored in the tank battery. The tank battery was secured with a locked board on board wooden fence and an earthen dike. I.D. signage was posted and legible. The tank battery consisted of one 91) 140 barrel stock tank ( with carbon filter, lightning arrestor and pressure relief hatch ), one (1) 50 barrel poly brine tank and one (1) 2408 separator with gas meter. The load lines were locked and plugged. No leaks were identified. No violations found during this inspection.
 +
|-
 +
| 1588865200
 +
| 2009-05-11
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| The wellhead and tank battery have been painted and the site has been graded. The well can be turned on as soon as the required fencing has been installed.
 +
|-
 +
| 1732710277
 +
| 2009-03-11
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Baker Atlas was on site to run a cement bond log and a casing integrity log. The bond log indicated that the top of cement is into the salt section. The integrity log indicated that there is a split in the casing from 424 to 426. Atlas set a retrievable bridge plug at 3525 and cut off the 4-1/2 at 462 which is in the first full joint below the split. The next step will involve setting a 4-1/2 overshot on the cut end and pressure testing the repair before rescheduling the frac job.
 +
|-
 +
| 183739604
 +
| 2009-2-27 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| 2106031115
 +
| 2009-08-13
 +
| Preliminary Restoration
 +
| No Violations
 +
| Preliminary restoration is approved.
 +
|-
 +
| 355265129
 +
| 2009-2-18 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| 551119010
 +
| 2009-3-10 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| 584056619
 +
| 2009-6-18 0:00:
 +
| DD
 +
| No Violations
 +
|
 
|-
 
|-
 
| 756256346
 
| 756256346
| 2009-02-19
+
| 2009-2-19 0:00:
|  
+
| DD
| Wildcat is drilling the conductor hole. The suction pit has been dug and lined and Don's Excavating is digging the blow pit. Should be ready to run and cement conductor casing later today.
+
| No Violations
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 08:02, 12 January 2021

Well Details

Well ID: 34-153-23065
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: MCGREGOR
License Status: Producing
License Date: 2008-10-03
Spud Date: 2009-02-19
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2009-02-25
Well Total Depth: 4345.00 ft
Configuration: Directional
Latitude: 41.220000
Longitude: -81.440000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-10-03 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:10/3/2008, Expired Date:10/3/2009 6:00:00 AM, Drilling unit acres:22.95, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-02-25
Correction to Well 2009-04-24 AS DRILLED SURVEY CORRECTIONS TO TARGET INFORMATION: FOOTAGE= 720'NL & 380'WL OF LOT 36; X=2,291,775 AND Y= 571,515.
Completion Report Received 2009-06-17
Construction Permit Expires 2009-10-03
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-09-22 4072 4150 80
4072 4150 80
4072 4150 80

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 8 2679 Bbl 79000 1000 GALLONS IC ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 OHIO VALLEY ENERGY SYSTEMS COR 1248.00 201.00 74
2010 OHIO VALLEY ENERGY SYSTEMS COR 3185.00 391.00 365
2011 OHIO VALLEY ENERGY SYSTEMS COR 1668.00 147.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 1408.00 186.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 869.00 133.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 976.00 151.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 3350.00 233.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 3571.00 103.00 310
2017 OHIO VALLEY ENERGY SYSTEMS COR 3931.00 100.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 3931.00 138.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 OHIO VALLEY ENERGY SYSTEMS COR Brine 3294 74
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 155 365
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 28 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 33 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 47 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 270 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 627 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 58 310
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 64 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 145 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-128923744 2009-3-9 0:00:0 DD No Violations
-1588865200 2009-5-11 0:00: DD No Violations
-1732710277 2009-3-11 0:00: DD No Violations
-2079987 2009-2-2 0:00:0 DD No Violations
-51371437 2009-4-28 0:00: DD No Violations
-554657247 2009-3-19 0:00: DD No Violations
0002079987 2009-02-02 Drill / Deepen / Reopen No Violations Dons Excavating is on site building the lease road and grading the location. The rig is scheduled to arrive within the next few weeks. The required signage and the drilling permit have been posted.
0051371437 2009-04-28 Drill / Deepen / Reopen No Violations Dons Excavating is on site to grade the site. The tank battery has been built but the required fencing is not in place.
0128923744 2009-03-09 Drill / Deepen / Reopen No Violations The pits have been solidified and closed. The frac tanks are on site and the frac job is scheduled for tomorrow. No violations at this time.
0183739604 2009-02-27 Drill / Deepen / Reopen No Violations The drilling rig has moved off site. The pits are fenced and lined but need to be pumped down. According to Don Nething with Ohio Valley, the fluid level in the pits will be lowered today.
0355265129 2009-02-18 Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on the location and will spud the well tomorrow morning. Both the conductor casing and the surface casing will be cemented to surface.
0551119010 2009-03-10 Drill / Deepen / Reopen No Violations At 10:36 am on 3/10, I received a call from Dale Nething with OVE reporting an unknown failure at the well site and requesting my immediate response. I arrived on site at approximately 11:15 and met with Rick Liddle and Tom Wood. Universal Well Service was on site to frac the well and J-Well was on site with the service rig. According to Rick Liddle, the well broke at 1200 psi. Universal balled off and then shut down for 30 minutes for the balls to fall off. Universal started in with the nitrogen foam pad and had mixed and displaced approximately 2/3 of the planned volume (250,000 scf). The pressure was 2230 psi when the well started circulating gas out the backside. Universal shut down immediately and J-Well plumbed both the 4-1/2 and the backside directly into a 300 bbl frac tank. According to Tom Wood, the 4-1/2 casing came from McJunkin and was classified as limited service, 11.6 ppf tested to 4900 psi. The limited service designation was due to mixed R-2 and R-3 lengths. Reportedly, at no time was the backside shut in. The frac crew was released and Universal sent a pickup truck with a wireline spool and a pump truck to pump a flag down hole to try an locate the problem. Universal pumped 31 bbl and displaced the flag to 426. The well never circulated fluid but was gasing (presumably nitrogen). The maximum pressure was 150 psi at a maximum rate of 4 bpm. The well was plumbed into a frac tank and left open over night. Baker Atlas will be on site tomorrow to run 1) cement bond log, 2) casing integrity log, 3) retrievable bridge plug and 4) a casing cutter in the first joint below the bad spot.
0554657247 2009-03-19 Drill / Deepen / Reopen No Violations The well was fraced on 3/18. Today, J-Well ran tubing and continued to flow back the well.
0584056619 2009-06-18 Drill / Deepen / Reopen No Violations The affected area has been graded and the fence posts are in place. The well can be turned on as soon as the fencing is installed.
0756256346 2009-02-19 Drill / Deepen / Reopen No Violations Wildcat is drilling the conductor hole. The suction pit has been dug and lined and Dons Excavating is digging the blow pit. Should be ready to run and cement conductor casing later today.
1236001351 2009-02-24 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead at 3560. They should TD the well tomorrow and move on Thursday 2/26. The pits are fenced and lined as required.
1237824214 2009-03-17 Drill / Deepen / Reopen No Violations Frac job begun last week was completed today. The casing patch held and there was no evidence of any problem with the 4-1/2 casing.
1238770714 2009-03-31 Drill / Deepen / Reopen No Violations The tank battery location is being built and site restoration has started with rough grading and filling. The repair of the damaged asphalt parking lot is also being scheduled. No violations at this time.
1252080904 2009-02-11 Drill / Deepen / Reopen No Violations Dons Excavating is on site building the lease road and the drilling location. The rig is scheduled to arrive next week. The required identification and permit are posted at the entrance.
1524766959 2018-04-26 UrbanProduction Wells No Violations Access to the wellhead and tank battery was on paved and graveled surfaces. The well was operated as an electric pumping well. A locked board on board fence secured the well. I.D. signage was posted and legible. The wellhead had some lubricating oil on it from the polish rod lubricator. The 8.625 X 4.5 annular space was monitored in the tank battery. The tank battery was secured with a locked board on board wooden fence and an earthen dike. I.D. signage was posted and legible. The tank battery consisted of one 91) 140 barrel stock tank ( with carbon filter, lightning arrestor and pressure relief hatch ), one (1) 50 barrel poly brine tank and one (1) 2408 separator with gas meter. The load lines were locked and plugged. No leaks were identified. No violations found during this inspection.
1588865200 2009-05-11 Drill / Deepen / Reopen No Violations The wellhead and tank battery have been painted and the site has been graded. The well can be turned on as soon as the required fencing has been installed.
1732710277 2009-03-11 Drill / Deepen / Reopen No Violations Baker Atlas was on site to run a cement bond log and a casing integrity log. The bond log indicated that the top of cement is into the salt section. The integrity log indicated that there is a split in the casing from 424 to 426. Atlas set a retrievable bridge plug at 3525 and cut off the 4-1/2 at 462 which is in the first full joint below the split. The next step will involve setting a 4-1/2 overshot on the cut end and pressure testing the repair before rescheduling the frac job.
183739604 2009-2-27 0:00: DD No Violations
2106031115 2009-08-13 Preliminary Restoration No Violations Preliminary restoration is approved.
355265129 2009-2-18 0:00: DD No Violations
551119010 2009-3-10 0:00: DD No Violations
584056619 2009-6-18 0:00: DD No Violations
756256346 2009-2-19 0:00: DD No Violations

For data sources see[9]

References