X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22161"

m
 
m
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22161
 
| Well ID: 37-003-22161
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.508319, -79.706652 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.508319, -79.706653 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Plum Borough,_Allegheny_County,_Pennsylvania|Plum Borough]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 
|-
 
|-
| First Permit Date: 2011-01-27
+
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: PARKER 1
 +
|-
 +
| License Status:
 +
|-
 +
| Spud Date:
 
|-
 
|-
| Last Permit Date: 2011-01-27
+
| Permit Date: 2011-01-27
 
|-
 
|-
| Spud Date: 2011-04-15
+
| Well Type: GAS
 
|-
 
|-
| Unconventional: No
+
| Unconventional Well: N
 
|-
 
|-
| Horizontal: No
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.508319
 
| Latitude: 40.508319
 
|-
 
|-
| Longitude: -79.706652
+
| Longitude: -79.706653
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-01-27
 +
| New Permit Application
 +
|-
 +
| 2011-04-15
 +
| Performed Spud Operation
 +
|-
 +
| 2011-04-25
 +
| Drilling Completion
 +
|-
 +
| 2011-05-04
 +
| Perforation
 +
|-
 +
| 2011-12-13
 +
| NEWLY DRILLED
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2013-0
+
| 2010
| style="text-align:right;" | 6580.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 5,969.00
 +
| style="text-align: right;" | 184
 +
| style="text-align: right;" | 72.30
 +
| style="text-align: right;" | 184
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2012
| style="text-align:right;" | 8229.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 8,229.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 6,580.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2014
| style="text-align:right;" | 5969.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 6,158.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 72.3
+
| style="text-align: right;" | 0
| style="text-align:right;" | 184.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 6,046.12
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2016
| style="text-align:right;" | 0.0
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 5,263.67
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 4,685.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 4,059.01
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 3,742.62
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-0
+
| 2011
| DRILLING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 1598.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 1,598.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
| 2011-0
+
| 2011
| FRACING FLUID WASTE
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 240.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 240.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 
|-
 
|-
| 2013-0
+
| 2013
| PRODUCED FLUID
+
| [[PENNECO OIL CO INC]]
| style="text-align:right;" | 40.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 40 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095443
 
| PA0095443
| CREEKSIDE TREATMENT FACILITY
+
|-
| CREEKSIDE
+
| 2019
| PA
+
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 33.33 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1961867
 
| 1961867
 +
| Primary Facility
 
| 2011-03-18
 
| 2011-03-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On March 18th, 2011 I visited this site as a routine inspection.  Drilling has not yet started.  Construction of the pad was underway.  The access road was in ok condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  Pits were constructed.  Some water was beginning to collect in the pits.  Drill cutting disposal should be monitired to be sure they are not placed within the seasonal high water table,  No accelerated erosion was observed at the time of inspection.
 
| On March 18th, 2011 I visited this site as a routine inspection.  Drilling has not yet started.  Construction of the pad was underway.  The access road was in ok condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  Pits were constructed.  Some water was beginning to collect in the pits.  Drill cutting disposal should be monitired to be sure they are not placed within the seasonal high water table,  No accelerated erosion was observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1975539
 
| 1975539
 +
| Primary Facility
 
| 2011-04-15
 
| 2011-04-15
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 15th, 2011 I visited this site as a routine inspection.  Drilling has not yet started.  Equipment was moving onsite.  The access road was in ok condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  No accelerated erosion was observed at the time of inspection.
 
| On April 15th, 2011 I visited this site as a routine inspection.  Drilling has not yet started.  Equipment was moving onsite.  The access road was in ok condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  No accelerated erosion was observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1976429
 
| 1976429
 +
| Primary Facility
 
| 2011-04-25
 
| 2011-04-25
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE. WEATHERFORD IS LOGGING WELL.
 
| DRILLING COMPLETE. WEATHERFORD IS LOGGING WELL.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1976437
 
| 1976437
 +
| Primary Facility
 
| 2011-04-20
 
| 2011-04-20
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| USE RIG #7 DRILLING AT 1190'.
 
| USE RIG #7 DRILLING AT 1190'.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1976441
 
| 1976441
 +
| Primary Facility
 
| 2011-04-18
 
| 2011-04-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 20" CEMENTED ON 4/17/11. USE RIG #7 STARTING UP TO RESUME DRILLING.
 
| 20" CEMENTED ON 4/17/11. USE RIG #7 STARTING UP TO RESUME DRILLING.
 
|
 
|-
 
 
|-
 
|-
 
| 1983662
 
| 1983662
 +
| Primary Facility
 
| 2011-04-19
 
| 2011-04-19
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 19th, 2011 I visited this site as a routine inspection.  Drilling has started.  Additional rock was being added to the access road  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  The pit appeared to be in good condition and had adequate freeboard.  No accelerated erosion was observed at the time of inspection.
 
| On April 19th, 2011 I visited this site as a routine inspection.  Drilling has started.  Additional rock was being added to the access road  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  The pit appeared to be in good condition and had adequate freeboard.  No accelerated erosion was observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1983742
 
| 1983742
 +
| Primary Facility
 
| 2011-04-28
 
| 2011-04-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On April 28th, 2011 I visited this site as a routine inspection.  Drilling was completed.  The access road was in good condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  The pit was open, contained fluids, and appeared to be in good condition and had adequate freeboard.  No accelerated erosion was observed at the time of inspection.
 
| On April 28th, 2011 I visited this site as a routine inspection.  Drilling was completed.  The access road was in good condition.  A Site ID and E&S plan were posted onsite.  E&S controls were in place.  The pit was open, contained fluids, and appeared to be in good condition and had adequate freeboard.  No accelerated erosion was observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1991689
 
| 1991689
 +
| Primary Facility
 
| 2011-07-11
 
| 2011-07-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| THIS GAS WELL IS COMPLETE.  
+
| THIS GAS WELL IS COMPLETE.
PRODUCTION EQUIPTMENT IS HOOKED UP.
 
SITE IS RESTORED.
 
|
 
|-
 
 
|-
 
|-
 
| 1993501
 
| 1993501
 +
| Primary Facility
 
| 2011-08-04
 
| 2011-08-04
 +
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
 
| On August 4th, 2011 I visited this site as a routine inspection.  Drilling was completed.  The well was in production.  The access road was in good condition.  A Site ID and E&S plan were still posted onsite.  A well tag was present.  One tank was surrounded with a dike.  The site was restored and vegetation was coming in nicely.  No accelerated erosion was observed at the time of inspection.
 
| On August 4th, 2011 I visited this site as a routine inspection.  Drilling was completed.  The well was in production.  The access road was in good condition.  A Site ID and E&S plan were still posted onsite.  A well tag was present.  One tank was surrounded with a dike.  The site was restored and vegetation was coming in nicely.  No accelerated erosion was observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 2111656
 
| 2111656
 +
| Primary Facility
 
| 2012-10-31
 
| 2012-10-31
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley WQS, SWRO was on site to conduct an inspection.  At the time of the inspection, the well site sign and label were on site.  The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition.  There were no erosion or sedimentation issues.  The area around the pad meets the 70% uniform vegetative coverage.
 
| John Ley WQS, SWRO was on site to conduct an inspection.  At the time of the inspection, the well site sign and label were on site.  The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition.  There were no erosion or sedimentation issues.  The area around the pad meets the 70% uniform vegetative coverage.
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:39, 20 May 2020

Well Details

Well ID: 37-003-22161
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: PARKER 1
License Status:
Spud Date:
Permit Date: 2011-01-27
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.508319
Longitude: -79.706653

For data sources see[1][2][3]

Well History

Date Event
2011-01-27 New Permit Application
2011-04-15 Performed Spud Operation
2011-04-25 Drilling Completion
2011-05-04 Perforation
2011-12-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 5,969.00 184 72.30 184 0.00 0
2012 PENNECO OIL CO INC 8,229.00 366 0.00 0 0.00 0
2013 PENNECO OIL CO INC 6,580.00 365 0.00 0 0.00 0
2014 PENNECO OIL CO INC 6,158.00 365 0.00 0 0.00 0
2015 PENNECO OIL CO INC 6,046.12 365 0.00 0 0.00 0
2016 PENNECO OIL CO INC 5,263.67 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 4,685.00 365 0.00 0 0.00 0
2018 PENNECO OIL CO INC 4,059.01 365 0.00 0 0.00 0
2019 PENNECO OIL CO INC 3,742.62 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Drilling Fluid Waste 1,598.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Fracing Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2013 PENNECO OIL CO INC Produced Fluid 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid 40 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 30 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 PENNECO OIL CO INC Produced Fluid 30.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2019 PENNECO OIL CO INC Produced Fluid 33.33 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1961867 Primary Facility 2011-03-18 Routine/Complete Inspection No Violations Noted On March 18th, 2011 I visited this site as a routine inspection. Drilling has not yet started. Construction of the pad was underway. The access road was in ok condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. Pits were constructed. Some water was beginning to collect in the pits. Drill cutting disposal should be monitired to be sure they are not placed within the seasonal high water table, No accelerated erosion was observed at the time of inspection.
1975539 Primary Facility 2011-04-15 Routine/Complete Inspection No Violations Noted On April 15th, 2011 I visited this site as a routine inspection. Drilling has not yet started. Equipment was moving onsite. The access road was in ok condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. No accelerated erosion was observed at the time of inspection.
1976429 Primary Facility 2011-04-25 Drilling/Alteration No Violations Noted DRILLING COMPLETE. WEATHERFORD IS LOGGING WELL.
1976437 Primary Facility 2011-04-20 Drilling/Alteration No Violations Noted USE RIG #7 DRILLING AT 1190'.
1976441 Primary Facility 2011-04-18 Drilling/Alteration No Violations Noted 20" CEMENTED ON 4/17/11. USE RIG #7 STARTING UP TO RESUME DRILLING.
1983662 Primary Facility 2011-04-19 Routine/Complete Inspection No Violations Noted On April 19th, 2011 I visited this site as a routine inspection. Drilling has started. Additional rock was being added to the access road A Site ID and E&S plan were posted onsite. E&S controls were in place. The pit appeared to be in good condition and had adequate freeboard. No accelerated erosion was observed at the time of inspection.
1983742 Primary Facility 2011-04-28 Routine/Complete Inspection No Violations Noted On April 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The access road was in good condition. A Site ID and E&S plan were posted onsite. E&S controls were in place. The pit was open, contained fluids, and appeared to be in good condition and had adequate freeboard. No accelerated erosion was observed at the time of inspection.
1991689 Primary Facility 2011-07-11 Drilling/Alteration No Violations Noted THIS GAS WELL IS COMPLETE.
1993501 Primary Facility 2011-08-04 Site Restoration No Violations Noted On August 4th, 2011 I visited this site as a routine inspection. Drilling was completed. The well was in production. The access road was in good condition. A Site ID and E&S plan were still posted onsite. A well tag was present. One tank was surrounded with a dike. The site was restored and vegetation was coming in nicely. No accelerated erosion was observed at the time of inspection.
2111656 Primary Facility 2012-10-31 Routine/Complete Inspection No Violations Noted John Ley WQS, SWRO was on site to conduct an inspection. At the time of the inspection, the well site sign and label were on site. The well was drilled and equipped for production. The associated well apparatus located onsite appeared to be in sound working condition. There were no erosion or sedimentation issues. The area around the pad meets the 70% uniform vegetative coverage.

For data sources see[7]

References