== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
| Well ID: 42-003-22187
+
| Well ID: 37-003-22187
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.514333, -79.706388 | width=100% | height=100% }}  
 
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.514333, -79.706388 | width=100% | height=100% }}  
 
|-
 
|-

Revision as of 13:40, 14 June 2014

Well Details

Well ID: 37-003-22187
Loading map...
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
First Permit Date: 2011-05-16
Last Permit Date: 2011-05-16
Spud Date: 2011-06-13
Unconventional: No
Horizontal: Yes
Violations: None
Latitude: 40.514333
Longitude: -79.706388

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1983213 2011-06-08 No Violations Noted PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.

ACCESS AND E&S OK.

1983776 2011-06-14 No Violations Noted CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
1983786 2011-06-16 No Violations Noted RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
1983787 2011-06-24 No Violations Noted RUNNING RODS TO RESUME DRILLING.

SITE, PIT, E&S, AND ACCESS, OK.

1983788 2011-06-28 No Violations Noted TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
1983789 2011-06-15 No Violations Noted RIG IDLE. PROBLEMS WIT THREADS ON CASING.
1985337 2011-06-08 No Violations Noted On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete.
1986504 2011-06-14 No Violations Noted On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1986608 2011-06-24 No Violations Noted On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1991678 2011-07-06 No Violations Noted US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.

KICK PLUG CEMENTED BACK TO 2492'.

1992021 2011-07-06 No Violations Noted On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993478 2011-07-26 No Violations Noted On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993497 2011-08-03 No Violations Noted On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993503 2011-08-04 No Violations Noted On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993798 2011-07-26 No Violations Noted RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
1993803 2011-07-18 No Violations Noted HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
1993812 2011-07-13 No Violations Noted HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
1998345 2011-08-03 No Violations Noted DRILLING COMPLETE AND THE RIG IS GONE.

SITE, PIT, E&S, AND ACCESS, IS OK.

1998347 2011-08-05 No Violations Noted THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.

FRACK TANKS ARE SET AND A NEW PIT HAS BEEN DUG. THE SITE IS CLEAN AND DOZED.

2001758 2011-08-16 No Violations Noted HORIZONTAL OIL WELL.

SERVICE RIG SET UP RUNNING PIPE. THE WELL WILL BE FRACED ON 8/18/11. SITE, PIT,, E&S, AND ACCESS GOOD.

2001797 2011-08-29 No Violations Noted RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
2001799 2011-08-24 No Violations Noted WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
2035041 2012-01-04 No Violations Noted HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
2054231 2012-02-22 No Violations Noted THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.

THE SITE IS RESTORED.

2106083 2012-10-04 No Violations Noted John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-0 20871.0 366.0 0.0 0.0 117.86 366.0
2011-0 7897.0 92.0 0.0 0.0 130.2 92.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 356.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 DRILLING FLUID WASTE 330.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 DRILLING FLUID WASTE 960.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 FRACING FLUID WASTE 2450.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 PRODUCED FLUID 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2011-0 DRILLING FLUID WASTE 1890.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA