== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22187
 
| Well ID: 37-003-22187
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.514333, -79.706388 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.514333, -79.706389 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[PENNECO OIL CO INC|PENNECO OIL CO INC]]
+
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 
|-
 
|-
| First Permit Date: 2011-05-16
+
| Municipality: [[Plum Borough,_Allegheny_County,_Pennsylvania|Plum Borough]]
 
|-
 
|-
| Last Permit Date: 2011-05-16
+
| Operator Name: [[PENNECO OIL CO INC]]
 
|-
 
|-
| Spud Date: 2011-06-13
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: No
+
| Farm/Lease Name: HANKEY UNIT 6H
 
|-
 
|-
| Horizontal: Yes
+
| License Status:  
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 +
|-
 +
| Permit Date: 2011-05-16
 +
|-
 +
| Well Type: OIL
 +
|-
 +
| Unconventional Well: N
 +
|-
 +
| Configuration: Deviated Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.514333
 
| Latitude: 40.514333
 
|-
 
|-
| Longitude: -79.706388
+
| Longitude: -79.706389
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-05-16
 +
| New Permit Application
 +
|-
 +
| 2011-06-13
 +
| Performed Spud Operation
 +
|-
 +
| 2011-08-02
 +
| Drilling Completion
 +
|-
 +
| 2011-08-16
 +
| Perforation
 +
|-
 +
| 2013-09-04
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 7,897.00
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 130.20
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 20,871.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 117.86
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 14,620.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 103.87
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 12,231.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 76.79
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 9,647.75
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 69.82
 +
| style="text-align: right;" | 31
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 7,836.47
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 6,647.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 86.11
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 5,528.31
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 36.69
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PENNECO OIL CO INC]]
 +
| style="text-align: right;" | 4,872.46
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,450.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 160.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 330.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095443
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,890.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2011
 +
| [[PENNECO OIL CO INC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 960.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2012
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 356.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 246.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2013
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 246 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095443
 +
|-
 +
| 2016
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 35.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[PENNECO OIL CO INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1983213
 
| 1983213
 +
| Primary Facility
 
| 2011-06-08
 
| 2011-06-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
 
| PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
ACCESS AND E&S OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1983776
 
| 1983776
 +
| Primary Facility
 
| 2011-06-14
 
| 2011-06-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
 
| CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
|
 
|-
 
 
|-
 
|-
 
| 1983786
 
| 1983786
 +
| Primary Facility
 
| 2011-06-16
 
| 2011-06-16
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
 
| RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
|
 
|-
 
 
|-
 
|-
 
| 1983787
 
| 1983787
 +
| Primary Facility
 
| 2011-06-24
 
| 2011-06-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RUNNING RODS TO RESUME DRILLING.
 
| RUNNING RODS TO RESUME DRILLING.
SITE, PIT, E&S, AND ACCESS, OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1983788
 
| 1983788
 +
| Primary Facility
 
| 2011-06-28
 
| 2011-06-28
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
 
| TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
|
 
|-
 
 
|-
 
|-
 
| 1983789
 
| 1983789
 +
| Primary Facility
 
| 2011-06-15
 
| 2011-06-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RIG IDLE. PROBLEMS WIT THREADS ON CASING.
 
| RIG IDLE. PROBLEMS WIT THREADS ON CASING.
|
 
|-
 
 
|-
 
|-
 
| 1985337
 
| 1985337
 +
| Primary Facility
 
| 2011-06-08
 
| 2011-06-08
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 8th , 2011 I conducted a routine inspection of the above site.  The site was under construction but almost complete.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete.
 
| On June 8th , 2011 I conducted a routine inspection of the above site.  The site was under construction but almost complete.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete.
|
 
|-
 
 
|-
 
|-
 
| 1986504
 
| 1986504
 +
| Primary Facility
 
| 2011-06-14
 
| 2011-06-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 14th , 2011 I conducted a routine inspection of the above site.  The rig was set up on site.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On June 14th , 2011 I conducted a routine inspection of the above site.  The rig was set up on site.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  E&S controls were in place.  The pit was constructed.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1986608
 
| 1986608
 +
| Primary Facility
 
| 2011-06-24
 
| 2011-06-24
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On June 24th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  Water trucks were on site.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On June 24th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  Water trucks were on site.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1991678
 
| 1991678
 +
| Primary Facility
 
| 2011-07-06
 
| 2011-07-06
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
 
| US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
KICK PLUG CEMENTED BACK TO 2492'.
 
|
 
|-
 
 
|-
 
|-
 
| 1992021
 
| 1992021
 +
| Primary Facility
 
| 2011-07-06
 
| 2011-07-06
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On July 6th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  The next/bigger rig had moved in.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On July 6th , 2011 I conducted a routine inspection of the above site.  Drilling had started.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  The next/bigger rig had moved in.  E&S controls were in place.  The pit appeared to be in good condition.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1993478
 
| 1993478
 +
| Primary Facility
 
| 2011-07-26
 
| 2011-07-26
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint.  Drilling was occurring.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  12 frac tanks were at the site.  E&S controls were in place.  The pit appeared to be in good condition.  A small slip was developing on the fill slope.  Crews were on site to make repairs.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint.  Drilling was occurring.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.  12 frac tanks were at the site.  E&S controls were in place.  The pit appeared to be in good condition.  A small slip was developing on the fill slope.  Crews were on site to make repairs.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1993497
 
| 1993497
 +
| Primary Facility
 
| 2011-08-03
 
| 2011-08-03
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On August 3rd , 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was tearing down.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pit appeared to be in good condition.  The silt sock required maintenance. The operator was contacted.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On August 3rd , 2011 I conducted a routine inspection of the above site.  Drilling was completed and the rig was tearing down.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pit appeared to be in good condition.  The silt sock required maintenance. The operator was contacted.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1993503
 
| 1993503
 +
| Primary Facility
 
| 2011-08-04
 
| 2011-08-04
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On August 4th  , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site.  The necessary repairs had been completed.  The rig had moved offsite.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pits appeared to be in good condition.  Crews were cleaning the mud tanks.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
 
| On August 4th  , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site.  The necessary repairs had been completed.  The rig had moved offsite.  The access road was in good condition.  A Site ID and E&S plan were posted at the site.    E&S controls were in place.  The pits appeared to be in good condition.  Crews were cleaning the mud tanks.  The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
|
 
|-
 
 
|-
 
|-
 
| 1993798
 
| 1993798
 +
| Primary Facility
 
| 2011-07-26
 
| 2011-07-26
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
 
| RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
|
 
|-
 
 
|-
 
|-
 
| 1993803
 
| 1993803
 +
| Primary Facility
 
| 2011-07-18
 
| 2011-07-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
 
| HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
|
 
|-
 
 
|-
 
|-
 
| 1993812
 
| 1993812
 +
| Primary Facility
 
| 2011-07-13
 
| 2011-07-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
 
| HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
|
 
|-
 
 
|-
 
|-
 
| 1998345
 
| 1998345
 +
| Primary Facility
 
| 2011-08-03
 
| 2011-08-03
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE AND THE RIG IS GONE.
 
| DRILLING COMPLETE AND THE RIG IS GONE.
SITE, PIT, E&S, AND ACCESS, IS OK.
 
|
 
|-
 
 
|-
 
|-
 
| 1998347
 
| 1998347
 +
| Primary Facility
 
| 2011-08-05
 
| 2011-08-05
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.  
+
| THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.
FRACK TANKS ARE SET AND A NEW PIT HAS BEEN DUG.
 
THE SITE IS CLEAN AND DOZED.
 
|
 
|-
 
 
|-
 
|-
 
| 2001758
 
| 2001758
 +
| Primary Facility
 
| 2011-08-16
 
| 2011-08-16
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL WELL.
 
| HORIZONTAL OIL WELL.
SERVICE RIG SET UP RUNNING PIPE.
 
THE WELL WILL BE FRACED ON 8/18/11.
 
SITE, PIT,, E&S, AND ACCESS GOOD.
 
|
 
|-
 
 
|-
 
|-
 
| 2001797
 
| 2001797
 +
| Primary Facility
 
| 2011-08-29
 
| 2011-08-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
 
| RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
|
 
|-
 
 
|-
 
|-
 
| 2001799
 
| 2001799
 +
| Primary Facility
 
| 2011-08-24
 
| 2011-08-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
 
| WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
|
 
|-
 
 
|-
 
|-
 
| 2035041
 
| 2035041
 +
| Primary Facility
 
| 2012-01-04
 
| 2012-01-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
 
| HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
|
 
|-
 
 
|-
 
|-
 
| 2054231
 
| 2054231
 +
| Primary Facility
 
| 2012-02-22
 
| 2012-02-22
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.  
+
| THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.
THE SITE IS RESTORED.
 
|
 
|-
 
 
|-
 
|-
 
| 2106083
 
| 2106083
 +
| Primary Facility
 
| 2012-10-04
 
| 2012-10-04
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley WQS SWRO, was on site to complete a routine inspection.  The well was equipped for production.  Brine tank located onsite appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in on the access road or well-site.  The site had at least 70% vegetation on the hillsides.
 
| John Ley WQS SWRO, was on site to complete a routine inspection.  The well was equipped for production.  Brine tank located onsite appeared to be in sound condition.  There was no observed accelerated erosion or sedimentation in on the access road or well-site.  The site had at least 70% vegetation on the hillsides.
 +
|-
 +
| 2464606
 +
| Primary Facility
 +
| 2016-03-10
 +
| Incident- Response to Accident or Event
 +
| Violation(s) Noted
 
|  
 
|  
 +
|-
 +
| 2483885
 +
| Primary Facility
 +
| 2016-05-11
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2678195
 +
| Primary Facility
 +
| 2018-01-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition.
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
 
|-
 
|-
| 2012-0
+
| 2464606
| style="text-align:right;" | 20871.0
+
| 754223
| style="text-align:right;" | 366.0
+
| 2016-03-10
| style="text-align:right;" | 0.0
+
| 2016-05-11
| style="text-align:right;" | 0.0
+
| 78.57(a)
| style="text-align:right;" | 117.86
+
| Environmental Health & Safety
| style="text-align:right;" | 366.0
+
|  
 
|-
 
|-
|-
+
| 2464606
| 2011-0
+
| 754224
| style="text-align:right;" | 7897.0
+
| 2016-03-10
| style="text-align:right;" | 92.0
+
| 2016-05-11
| style="text-align:right;" | 0.0
+
| SWMA301
| style="text-align:right;" | 0.0
+
| Environmental Health & Safety
| style="text-align:right;" | 130.2
+
|  
| style="text-align:right;" | 92.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-0
+
| 754223
| PRODUCED FLUID
+
| 340779
| style="text-align:right;" | 356.0
+
| NOV - Notice of Violation
| Bbl
+
|
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|  
| PA0101508
+
| 2016-05-11
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
+
| style="text-align: right;" |  
| FRANKLIN
+
| style="text-align: right;" |  
| PA
 
 
|-
 
|-
|-
+
| 754224
| 2011-0
+
| 340779
| DRILLING FLUID WASTE
+
| NOV - Notice of Violation
| style="text-align:right;" | 330.0
+
|  
| Bbl
+
|  
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 2016-05-11
| PA0095443
+
| style="text-align: right;" |  
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| style="text-align: right;" |  
| CREEKSIDE
 
| PA
 
|-
 
|-
 
| 2011-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 960.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 2450.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 160.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO
 
| FRANKLIN
 
| PA
 
|-
 
|-
 
| 2011-0
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 1890.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| TUNNELTON LIQUIDS COMPANY
 
| SALTSBURG
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:41, 20 May 2020

Well Details

Well ID: 37-003-22187
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HANKEY UNIT 6H
License Status:
Spud Date:
Permit Date: 2011-05-16
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.514333
Longitude: -79.706389

For data sources see[1][2][3]

Well History

Date Event
2011-05-16 New Permit Application
2011-06-13 Performed Spud Operation
2011-08-02 Drilling Completion
2011-08-16 Perforation
2013-09-04 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PENNECO OIL CO INC 7,897.00 92 130.20 92 0.00 0
2012 PENNECO OIL CO INC 20,871.00 366 117.86 366 0.00 0
2013 PENNECO OIL CO INC 14,620.00 365 103.87 365 0.00 0
2014 PENNECO OIL CO INC 12,231.00 365 76.79 365 0.00 0
2015 PENNECO OIL CO INC 9,647.75 365 69.82 31 0.00 0
2016 PENNECO OIL CO INC 7,836.47 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 6,647.00 365 86.11 365 0.00 0
2018 PENNECO OIL CO INC 5,528.31 365 36.69 30 0.00 0
2019 PENNECO OIL CO INC 4,872.46 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 2,450.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Drilling Fluid Waste 1,890.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Drilling Fluid Waste 960.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Produced Fluid 356.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 246.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid 246 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 35 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 35.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 PENNECO OIL CO INC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1983213 Primary Facility 2011-06-08 Drilling/Alteration No Violations Noted PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
1983776 Primary Facility 2011-06-14 Drilling/Alteration No Violations Noted CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
1983786 Primary Facility 2011-06-16 Drilling/Alteration No Violations Noted RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
1983787 Primary Facility 2011-06-24 Drilling/Alteration No Violations Noted RUNNING RODS TO RESUME DRILLING.
1983788 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
1983789 Primary Facility 2011-06-15 Drilling/Alteration No Violations Noted RIG IDLE. PROBLEMS WIT THREADS ON CASING.
1985337 Primary Facility 2011-06-08 Routine/Complete Inspection No Violations Noted On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete.
1986504 Primary Facility 2011-06-14 Routine/Complete Inspection No Violations Noted On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1986608 Primary Facility 2011-06-24 Routine/Complete Inspection No Violations Noted On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1991678 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
1992021 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993478 Primary Facility 2011-07-26 Complaint Inspection No Violations Noted On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993497 Primary Facility 2011-08-03 Routine/Complete Inspection No Violations Noted On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993503 Primary Facility 2011-08-04 Follow-up Inspection No Violations Noted On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993798 Primary Facility 2011-07-26 Drilling/Alteration No Violations Noted RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
1993803 Primary Facility 2011-07-18 Drilling/Alteration No Violations Noted HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
1993812 Primary Facility 2011-07-13 Drilling/Alteration No Violations Noted HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
1998345 Primary Facility 2011-08-03 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND THE RIG IS GONE.
1998347 Primary Facility 2011-08-05 Drilling/Alteration No Violations Noted THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.
2001758 Primary Facility 2011-08-16 Drilling/Alteration No Violations Noted HORIZONTAL OIL WELL.
2001797 Primary Facility 2011-08-29 Drilling/Alteration No Violations Noted RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
2001799 Primary Facility 2011-08-24 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
2035041 Primary Facility 2012-01-04 Routine/Complete Inspection No Violations Noted HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
2054231 Primary Facility 2012-02-22 Routine/Complete Inspection No Violations Noted THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.
2106083 Primary Facility 2012-10-04 Routine/Complete Inspection No Violations Noted John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides.
2464606 Primary Facility 2016-03-10 Incident- Response to Accident or Event Violation(s) Noted
2483885 Primary Facility 2016-05-11 Compliance Evaluation No Violations Noted
2678195 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2464606 754223 2016-03-10 2016-05-11 78.57(a) Environmental Health & Safety
2464606 754224 2016-03-10 2016-05-11 SWMA301 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
754223 340779 NOV - Notice of Violation 2016-05-11
754224 340779 NOV - Notice of Violation 2016-05-11

For data sources see[7]

References