X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30598

Well Details

Well ID: 37-005-30598
Loading map...
Operator Name: MDS ENERGY LTD
First Permit Date: 2010-04-01
Last Permit Date: 2010-04-01
Spud Date: 2010-10-17
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.804227
Longitude: -79.545288

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 3215.0 283.0 0.0 0.0 0.0 0.0
2012-0 4296.0 324.0 0.0 0.0 0.0 0.0
2011-0 9626.0 330.0 0.0 0.0 0.0 0.0
2010-0 960.0 21.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 FRACING FLUID WASTE 240.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2010-0 PRODUCED FLUID 120.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA
2010-0 FRACING FLUID WASTE 600.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA
2011-0 PRODUCED FLUID 75.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO FRANKLIN PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1922232 2010-10-19 No Violations Noted Operator provided spud notification to begin as soon as 10/17/10. Dozer doing location prep at time of this inspection. Unlined pit on location.

Rock lined ditch and culvert has not been implemented on access road as per E/S plan. Referred to WQS J. Shultz for follow up. Inspection conducted w/OGI D. Catalano.

1922269 2010-10-20 No Violations Noted Running 926¿ of 7¿ (17#/ft 0.231¿ wall) casing in 960¿ of 8 7/8¿ hole at time of inspection. Cement basket set @ 120¿.

Drillers log shows 36¿ of 13 3/8¿ conductor previously set. Drilling pit lined and freeboard maintained. E/S controls in place. Inspection conducted w/OGI D. Catalano.

1929382 2010-11-22 No Violations Noted Well was recently frac'd. Crew is currently on-site re-grading the well pad and repairing E&S controls. Site ID sign and E&S plan located. Spoke with operator representative Randy Morris. The E&S controls are being upgraded with the addition of hay bales to help stabilize the site.
2081139 2012-07-05 No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and pump jack located onsite appear to be in sound condition. The Department notes that the brine tank associated with this well is located approximately 300 feet offsite nearest the access road entrance. The Brine tank appeared to be in sound condition. The Department also notes that the site is restored and meets the 70% uniform vegetative coverage criteria.
2137400 2013-02-01 Armstrong North Buffalo Twp No Violations Noted

References