X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-21089

Well Details

Well ID: 37-021-21089
Loading map...
Operator Name: TEXAS KEYSTONE INC
First Permit Date: 2008-07-17
Last Permit Date: 2008-07-17
Spud Date: 2009-06-02
Unconventional: No
Horizontal: No
Violations: 1
Latitude: 40.534697
Longitude: -78.624478

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1847.0 169.0 0.0 0.0 0.0 0.0
2011-0 2693.0 207.0 0.0 0.0 0.0 0.0
2010-0 1971.0 121.0 0.0 0.0 0.0 0.0
2009-0 1725.0 57.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-0 PRODUCED FLUID 80.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2013-0 PRODUCED FLUID 100.0 Bbl ROAD SPREADING INDIANA COUNTY ROADSPREADING - YOUNG TOWNSHIP PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1804009 2009-06-09 Viol(s) Noted & Immediately Corrected Well is in the active-drilling phase. No signs of erosion and sedimentation on the access road and well site. A discharge of hydraulic fluid was discovered on the well site of approximately 5 gallons. The fluid spill was contained on site and addressed immediately. Pads were used to soak up the fluid on the surface. Then the contaminated soil was hand dug and placed in sealed drums. The operator was instructed to follow their PPC guidelines for the cleanup and disposal of the contaminated soil. 564551
1805910 2009-06-18 No Violations Noted Well completed. Well head consisted of 7" pipe fitted to 4" pipe connected to shut off valve. No leakage of gas around well head. No signs of erosion and sedimentation on the access road and well site. A discharge of hydraulic fluid was removed from site pad. No sign of contaminated soil or material at the site. Pit aligned with plastic. No free board nor IW issues at the site. Frac tank, equipment trailer and sediment tank remain at the site. Drilling equipment removed from site.
1815548 2009-07-24 No Violations Noted Well is in post-drilling phase. There was erosion and sedimentation noted on culvert drain outlet. Outlet of culvert was not implimented properly, as a result sediment washed around the pile of stone placed near the outlet. See photos. The culvert outlet should have a rock lined sediment trap and outlet into an undisturbed area. Attention Vernon Fulmer.

References