If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.761536,"lon":-80.007144,"icon":""}]} |
County: Greene | |
Municipality: Dunkard Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148727 | |
Farm/Lease Name: LANCO UNIT 8H | |
First Permit Date: 2012-01-06 | |
Last Permit Date: 2012-01-06 | |
Spud Date: 2012-03-16 | |
Unconventional: Yes | |
Horizontal: Yes | |
Well Status: ACTIVE | |
Violations: 0 | |
Latitude: 39.761536 | |
Longitude: -80.007144 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-2 | 61325.0 | 17.0 | 1.0 | 17.0 | 0.0 | 0.0 |
2015-02 | 75524.0 | 28.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-01 | 107132.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2015-03 | 72520.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | DRILLING FLUID WASTE | 44.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2012-2 | DRILL CUTTINGS | 1.0 | Tons | LANDFILL | 100419 | ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL | MCCLELLANDTOWN | PA |
2012-2 | DRILLING FLUID WASTE | 3.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-1 | DRILLING FLUID WASTE | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2013-1 | FRACING FLUID WASTE | 1.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | |||
2013-2 | FRACING FLUID WASTE | 3.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2013-2 | FRACING FLUID WASTE | 3.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | DRILL CUTTINGS | 3.87 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
2014-1 | DRILLING FLUID WASTE | 28.33 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | FLOWBACK FRACTURING SAND | 8.28 | Tons | LANDFILL | 100172 | ARDEN LANDFILL | WASHINGTON | PA |
2014-1 | FLOWBACK FRACTURING SAND | 29.12 | Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 | US ECOLOGY | DETROIT | MI |
2014-1 | FRACING FLUID WASTE | 270.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-1 | FRACING FLUID WASTE | 266.67 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-1 | PRODUCED FLUID | 33.33 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | FRACING FLUID WASTE | 450.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | FRACING FLUID WASTE | 2.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
2014-2 | PRODUCED FLUID | 13.67 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY | |||
2014-2 | PRODUCED FLUID | 1.0 | Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 | RONCO WASTE PROCESSING FACILITY | MASONTOWN | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
2074543 | 2012-06-07 | No Violations Noted | KEANE 2143 DRILLING FOR CHEVRON. WERE DRILLING 8 5/8 HOLE @ 562'. CEMENT AND CASING INFO LOOKED GOOD .SITE LOOKED GOOD AT TIME OF INSPECTION. | |||
2085153 | 2012-07-17 | No Violations Noted | TOP HOLE DRILLED.PATTERSON 334 RIG ON SITE WILL MOVE TO THIS WELL WHEN THEY COMPLETE LANCO 7-H. SITE LOOKED GOOD AT TIME OF INSPECTION. | |||
2331243 | 2014-11-19 | No Violations Noted | REVIEWED CALIPER LOGS AND CASING PRESSURE TESTS THAT WERE COMPLETED ON THE WELL BORE. REVIEWED WITH CHEVRON PERSONNEL THE NEW WELL HEAD EQUIPTMENT REPLACED ON THE WELL. | |||
2334377 | 2014-10-06 | No Violations Noted | Well shut in | |||
2339127 | 2014-11-19 | No Violations Noted | Well completed. Well being placed into production. |
For data sources see[3]