37-059-25889

Well Details

Well ID: 37-059-25889
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Dunkard Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148727
Farm/Lease Name: LANCO UNIT 8H
License Status:
Spud Date:
Permit Date: 2012-01-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 39.761536
Longitude: -80.007144

For data sources see[1][2][3]

Well History

Date Event
2012-01-06 New Permit Application
2012-03-16 Performed Spud Operation
2012-07-30 Drilling Completion
2013-02-27 Perforation
2013-02-27 Performed Stimulation
2016-03-15 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-27 2013-02-27 8,071 5,310,032

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Proppant (lbs) Proppant 9.79 10.94214
7.5 Hcl Acid Reagent/PP G Used to open perfs Hydrochloric Acid 7647-01-0 7.5 0.14127
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30.0 None
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60.0 0.00003000
EC 6116a Nalco Biocide Dibromoacetonitrile 3252-43-5 5.0 0.00116
1,1-Dibromo-3-nitrilopropionamide 10222-01-2 30.0 0.00696
Polyethylene Glycol 25322-68-3 60.0 0.01392
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30.0 0.00698
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.00698
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30.0 0.03181
Clean Volume (gals) Carrier/Base Fluid 90.21 100.0
CMHPG (lbs) Ashland Water Viscosifier Carboxymethylhydroxyporoyl guar blend Mixture 100.0 0.00176

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-02-27 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 61,325.00 17 0.00 0 1.00 17
2015 CHEVRON APPALACHIA LLC 697,489.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 435,661.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 344,425.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 282,503.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 244,840.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 1,138.76 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 3,684.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 3,659.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,617.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,795.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 29.12 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 8.28 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Produced Fluid 1.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Drilling Fluid Waste 28.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 720.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 47.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Drill Cuttings 3.87 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 15.43 Tons LANDFILL 100172
2015 CHEVRON APPALACHIA LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 1,235.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Produced Fluid 5,525.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,175.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,361.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 188.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 38.33 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 33.33 Bbl INJECTION DISPOSAL WELL 34-059-24202
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 246.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 409.55 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid 703.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 80.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CHEVRON APPALACHIA LLC Produced Fluid 2,018.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 36.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 360.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Produced Fluid 36.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 255.32 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Other Oil & Gas Wastes 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2019 CHEVRON APPALACHIA LLC Produced Fluid 487.77 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2074543 Primary Facility 2012-06-07 Drilling/Alteration No Violations Noted KEANE 2143 DRILLING FOR CHEVRON. WERE DRILLING 8 5/8 HOLE @ 562'. CEMENT AND CASING INFO LOOKED GOOD .SITE LOOKED GOOD AT TIME OF INSPECTION.
2085153 Primary Facility 2012-07-17 Drilling/Alteration No Violations Noted TOP HOLE DRILLED.PATTERSON 334 RIG ON SITE WILL MOVE TO THIS WELL WHEN THEY COMPLETE LANCO 7-H. SITE LOOKED GOOD AT TIME OF INSPECTION.
2304744 Primary Facility 2014-07-17 Follow-up Inspection Outstanding Violations - No Viols Req'd Well shut in not producing.
2331243 Primary Facility 2014-11-19 Routine/Complete Inspection No Violations Noted REVIEWED CALIPER LOGS AND CASING PRESSURE TESTS THAT WERE COMPLETED ON THE WELL BORE. REVIEWED WITH CHEVRON PERSONNEL THE NEW WELL HEAD EQUIPTMENT REPLACED ON THE WELL.
2334377 Primary Facility 2014-10-06 Routine/Complete Inspection No Violations Noted Well shut in, and not in production.
2339127 Primary Facility 2014-11-19 Routine/Complete Inspection No Violations Noted Well completed. Well being placed into production.
2476272 Primary Facility 2016-04-07 Routine/Complete Inspection No Violations Noted

On 04/07/16 at approximately 0840 hours I conducted a routine complete inspection of the Lanco 6-8H well site in response to a restoration extension request submittal by Chevron. The Act 9 sign was in place and all required documents were present in the mail box. The site was stable. The original date for restoration was extended to October of 2014. Due to the extraordinary circumstances resulting from the loss of well control at the site in February of 2014, the Department is approving a new restoration date of October 31st, 2017.

2608634 Primary Facility 2017-06-19 Routine/Partial/Aerial Inspection No Violations Noted An inspection was conducted in response to Gary Bowlen of Chevron requesting a meeting to discuss site restoration. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. Site restoration activities had begun. Portions of the access road are to be removed to reduce impermeable surfaces during phase I. Additional portions of the access road are to be removed during phase II. The phase II access road restoration activities have been approved to be completed in phase I.

For data sources see[9]

References