37-063-36701

Well Details

Well ID: 37-063-36701
Loading map...
Operator Name: PENNECO OIL CO INC
First Permit Date: 2009-11-05
Last Permit Date: 2009-11-05
Spud Date: 2009-12-08
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.432343
Longitude: -79.090202

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 473.0 212.0 0.0 0.0 0.0 0.0
2012-0 2998.0 336.0 0.0 0.0 0.0 0.0
2011-0 4963.0 334.0 0.0 0.0 0.0 0.0
2010-0 4186.0 213.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 PRODUCED FLUID 15.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2010-0 FRACING FLUID WASTE 1170.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2013-0 PRODUCED FLUID 96.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1848827 2009-12-08 No Violations Noted Well permit granted on 11/5/09. Spud called for 12/8/09. Pad completed. E&S controls were implemented. Well stake and pit dug. Well sign and E&S plan located at the entrance of site. At the time of inspection, no E&S issues or IW issues.
1851523 2009-12-22 No Violations Noted At the time of inspection, the well was drilled but not set for production. Site was properly signed with E&S plan available for review. Access road was in stable condition. No E&S concerns with access road or well pad. Bmps were properly installed and functioning. Noted two pits onsite, recommended that operator monitor the pit freeboard as levels were near the 2ft of freeboard. I also recommend the operator utilized better measures to secure pit liners in order to prevent a potential pollution event. Inspector Paul Wyrwas was also onsite at time of inspection and indicated that on 12/23/2009 operator had plans to frac the well.
1851673 2009-12-22 No Violations Noted Well permit granted on 11/5/09. Spud called for 12/8/09. Pad completed. Well completed to target depth. Titan wire Line Company present to run geophysical study. Hydro frac is scheduled for 12/23/09. Well head set at 8¿ to 4¿ reducer and shut off. E&S controls were implemented. Well sign and E&S plan located at the entrance of site. At the time of inspection, no E&S issues or IW issues.
1941535 2011-01-06 No Violations Noted Well head consisted of 8¿ pipe reduced to 4 ¿pipe reduced to 2¿ production line. No signs of leakage from well head. Production equipment consisted of heater, separator (200 psi) and 100 bbl brine tank (< 10 bbl fluid). At the time of inspection, no E&S and IW issues at the site. Totalized show 5366 MCF and 542 MCF.


2102277 2012-09-19 No Violations Noted At the time, no issues with E&S. Gas well was in productions.

References