Well Details

Well ID: 111-20291
Loading map...
County: Somerset
Municipality: Jefferson Township
Operator Name: CHEVRON APPALACHIA LLC
Farm/Lease Name: R MILLER UNIT 2H
First Permit Date: 2010-01-07
Last Permit Date: 2010-12-30
Spud Date: 2011-06-02
Unconventional: Yes
Horizontal: Yes
Producing: No
Violations: None
Latitude: 40.033638
Longitude: -79.184861

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2004283 2011-09-13 No Violations Noted During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Well drilled not yet in production. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Control Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with growth observed. R Miller 6H recently spudded and drilled. No pits or tanks present on site. No violations noted during this inspection.
2006207 2011-09-28 No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure reading on the gauge located at the manifold. Annulus valve was closed.
1985943 2011-06-28 No Violations Noted At the time of inspection, drilling equipment was removed from site. No E&S or IW issues. Well head was completed with well head manifold. No pressure on the gauge at the manifold.
1986026 2011-06-09 No Violations Noted Chief contracted UDI 5 to install gas well. Chief contact person was Dewayne Pauley. Conductor pipe (20¿) installed to 60 ft and grouted to surface. Second stringer was 13 3/8¿ installed to 462 ft with 330 sks of gas blocks with 11 bbl return. Current depth was 1781. At the time of inspection, no E&S issues or IW issues at the site. Chief proposing to install 9 5/8¿ pipe to 1811 ft.
2034177 2012-01-10 No Violations Noted During this inspection; well sign, ES plan, ESCGP-1, and PPC plan onsite. Well tag present, although recommend operator update well tags to include current operator information.

Well spudded 6/2/11. Well drilled. Access road/entrance and well pad adequately rocked. BMPs installed and functioning according to ES Plan and appear properly maintained. No accelerated erosion or sedimentation issues noted during inspection. Previously disturbed areas have been seeded/mulched with adequate growth observed. R Miller 1H and 6H spudded and drilled, although yet in production. No pits or tanks present on site. Miller pipeline propject actively being installed. No violations noted during this inspection.

2069379 2012-05-10 No Violations Noted At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Multi well pad. Said well previously drilled. Crown Rig # 8 actively drilling 6H. Charles, DSM onsite during this inspection. Secondary containment in place beneath rig and onsite tanks. No pits installed by Chevron for drilling operations. Tanks and secondary containment look structurally sound. Appears bmp's are installed and functioning according to plan. No accelerated erosion or sedimentation issues noted with site or access road. Access road adequately rocked.Noted a "small" leak coming from Residual waste box on site, notified DSM whom stated the problem would be addressed immediately. Absorbent pads were placed in location of leak. Department also noted to DSM of a possible safety concern near back side of rig, where it appears shale was placed over top electric lines and drilling equipment (see picture). DSM stated that matter would be addressed immediately no violations noted.
2070076 2012-04-20 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 5,663 feet. Chevron was planning to TD at 7500 feet and set the kick off point. DEP personnel performed a site walk and did not find any issues.
2082062 2012-07-03 No Violations Noted
2092742 2012-05-15 No Violations Noted Well 2H was completed and Chevron was setting up on 6H.
2092873 2012-06-01 No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron had contracted Highland #2. Conductor pipe was set at 60 ft. (20’’pipe) and was grouted in place. 13 3/8” pipe was set at 457’ (surface pipe) and the 9 5/8” pipe was set at 1807 feet. Chevron current depth was 14,255 feet. Chevron set the kick off point at 7829 ft. DEP personnel performed a site walk and did not find any issues.


2094651 2012-08-06 No Violations Noted At the time of inspection, no site activity and no E&S issues were present.


Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILLING FLUID WASTE 825.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA
2012-2 FRACING FLUID WASTE 8438.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA
2011-1 DRILLING FLUID WASTE 130.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2011-1 DRILL CUTTINGS 462.41 Tons LANDFILL 100081 WASTE MANAGEMENT, INC - SOUTHERN ALLEGHENIES DAVIDSVILLE PA
2012-1 DRILLING FLUID WASTE 1195.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0253723 APPALACHIAN WATER SERVICES LLC (RONCO WTP) MASONTOWN PA
2012-1 DRILLING FLUID WASTE 360.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA