Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21148
 
| Well ID: 37-117-21148
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 41.645747, -77.256094 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.645747, -77.256094 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Tioga County, Pennsylvania|Tioga]]
 
| County: [[Tioga County, Pennsylvania|Tioga]]

Revision as of 04:43, 29 June 2014

Well Details

Well ID: 37-117-21148
Loading map...
County: Tioga
Municipality: Duncan Township
Operator Name: EQT PRODUCTION CO
Well Pad ID: 149046
Farm/Lease Name: PHOENIX 590934
First Permit Date: 2011-01-12
Last Permit Date: 2011-12-21
Spud Date: 2011-11-15
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 19
Latitude: 41.645747
Longitude: -77.256094

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2028267 2011-12-20 No Violations Noted
2030310 2011-12-20 No Violations Noted
2034357 2012-01-11 No Violations Noted
2066392 2012-05-09 No Violations Noted Inspection conducted on Pad S well site. WQS also conducting inspection on Pad S Impoundment area following reported flowback spill (300-500 gallons reported).
2067209 2012-05-09 Violation(s) Noted 639194
2067209 2012-05-09 Violation(s) Noted 639195
2067209 2012-05-09 Violation(s) Noted 639196
2067590 2012-05-10 Outstanding Violations - No Viols Req'd 5/10/12 FUI insp to verify clean up status of 5/8/12 flowback spill. TLT
2074218 2012-05-31 Violation(s) Noted 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT 641131
2074218 2012-05-31 Violation(s) Noted 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT 641132
2074218 2012-05-31 Violation(s) Noted 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT 641133
2074218 2012-05-31 Violation(s) Noted 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT 641134
2074218 2012-05-31 Violation(s) Noted 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT 641135
2074292 2012-06-01 Outstanding Violations - No Viols Req'd 6/1/12 FUI inspection to field screen/monitor release. TLT
2075700 2012-06-07 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1100 hours on June 7, 2012. The purpose of this visit was to evaluate the status of flowback removal from Impoundment 2 and to identify the extent of an elevated reading of specific conductance discovered earlier in the week.

Earlier in the week a seep entering the road ditch at 41°38’47”N, 77°14’55”W was discovered and exhibited an elevated reading of specific conductance, a sample was collected and submitted for laboratory analysis at that time. During this inspection, the flow measured of 5.41 mS. on the field conductivity meter and was followed up gradient. At 41°38’48”N, 77°15’00”W the flow at the road culvert above the road was measured and exhibited a reading of 8.59 mS. The upland slope that contributed flow to this culvert is the slope southeast of EQT’s Impoundment S. This location is approximately 1,700 feet from the Southeast corner of the Impoundment on a heading of 115°.

2075838 2012-06-04 Outstanding Violations - No Viols Req'd FUI Inspection to evaluate impoundment drawdown and conduct additional field screening. TLT
2076502 2012-06-05 Outstanding Violations - No Viols Req'd The "northeast spring" (41° 39' 01"N, 77° 15' 12"W) = >19,999 uS/cm

The discharge of spring @ culvert (41° 39' 2.48"N, 77° 15' 8.49"W) = 14,500 uS/cm The unnamed tributary to Rock Run (originating at the sand spring) at the road culvert (41° 39' 07"N, 77° 14' 10"W) (This is also referred to as C&A Station W). = 1,900 uS/cm. The clean UNT to the north of C&A Station W - 52 uS/cm UNT culvert; The two unnamed tributaries came together and went under the road through a culvert (41° 39' 7.2"N, 77° 15' 10.368" W) = 937 uS/cm The unnamed tributary was followed from the road culvert to the mouth where it emptied into Rock Run. The readings were1,040uS near the road and remained around 850uS - 900 uS all the way downstream at which point it emptied into Rock Run with a conductivity of 801 uS/cm Rock Run upstream of the UNT (41° 39' 06"N, 77° 14' 53"W) = 30 uS/cm Rock Run Downstream (41° 38' 43"N, 77° 14' 43"W). 222uS/cm

2076601 2012-06-06 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site from approximately 1045hours to 1500 hours on June 6, 2012. Representatives of the Department included Terra Tokarz (Water Quality Specialist), Jessica Ritenour (Professional Geologist ), Randy Farmeri (Professional Geologist Manager) and myself . Steve Kepler (Fisheries Biologist) and Heather Smiles (Fisheries Biologist) from the PA Fish and Boat Commission (PA F&BC ), were also present. Dave Allison and Mike Cromley from EQT were on-site.
2076602 2012-06-13 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1015 hours on June 13, 2012. The purpose of this visit was to evaluate the status of flowback removal from Impoundment 2, to identify the extent of an elevated reading of specific conductance discovered during previous inspections and to establish routine sampling points.

At the time of this inspection no flowback remained in the pit. Workers are seen in the attached photograph pressure washing the liner. Also noted were many holes identified by orange markings. A trench that was excavated to drain the seeps to the west of the impoundment was completed and the fluid was being pumped to a 500 barrel tank on site. C&A were preparing to dig additional sumps / trenches in the vicinity of 41° 38' 48" N, 77° 15' 0 W" to remove more liquid with elevated conductivity.

2076668 2012-05-30 Outstanding Violations - No Viols Req'd
2076733 2012-06-08 Outstanding Violations - No Viols Req'd
2076919 2012-06-11 Violation(s) & Outstanding Violations 642081
2076919 2012-06-11 Violation(s) & Outstanding Violations 642082
2076919 2012-06-11 Violation(s) & Outstanding Violations 642083
2077276 2012-06-12 Outstanding Violations - No Viols Req'd
2077279 2012-06-19 Outstanding Violations - No Viols Req'd
2077314 2012-06-20 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 0930 hours on June 20, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection.
2078900 2012-06-22 Outstanding Violations - No Viols Req'd
2079004 2012-06-26 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours on June 26, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection.
2081425 2012-07-05 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1000 hours on July 5, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. -MRN
2081849 2012-07-02 Outstanding Violations - No Viols Req'd
2082796 2012-07-12 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1500 on July 12, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection at the location noted below.

1. Headwaters Rock Run; 41° 39' 31 N, 77° 15' 06 W; Field Conductivity - 38 uS/cm 2. Downstream (DS) Rock Run; 41° 38' 43 N, 77° 14' 43 W; Field Conductivity - 77 uS/cm 3. Danzer Seep 1; 41° 38' 46 N 77° 14' 57 W; Field Conductivity - 12,800 uS/cm 4. Northeast Spring; 41° 39' 01 N, 77° 15' 12 W; Field Conductivity - >19,999 uS/cm 5. C&A Station W; UNT to Rock Run 41° 39' 07 N 77° 15' 10 W; Field Conductivity - 888 uS/cm 6. Sand Spring; C&A Stream A station 41° 38' 55 N, 77° 15' 31 W; Field Conductivity - 167 uS/cm No new violations were cited. - MRN

2083599 2012-07-16 Outstanding Violations - No Viols Req'd
2085691 2012-07-18 Outstanding Violations - No Viols Req'd
2085900 2012-07-19 Outstanding Violations - No Viols Req'd
2086157 2012-07-25 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1230 hours to 1415 on July 25, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection at the location noted below.

Headwaters Rock Run; 41° 39' 31 N, 77° 15' 06 W; 40 uS/cm C&A Station W; UNT to Rock Run 41° 39' 07 N 77° 15' 10 W; 1,228 uS/cm Downstream (DS) Rock Run; 41° 38' 43 N, 77° 14' 43 W; 93 uS/cm Danzer Seep 1; 41° 38' 46 N 77° 14' 57 W; 11,600 uS/cm Northeast Spring; 41° 39' 01 N, 77° 15' 12 W; 19,500 uS/cm Sand Spring; C&A Stream A station 41° 38' 55 N, 77° 15' 31 W; 182 uS/cm The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection.

2086416 2012-07-23 Outstanding Violations - No Viols Req'd
2088545 2012-08-02 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1415 on August 2, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN
2089841 2012-07-30 Outstanding Violations - No Viols Req'd
2090037 2012-08-02 Outstanding Violations - No Viols Req'd
2090399 2012-08-09 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1045 hours to 1330 on August 9, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection - MRN
2091888 2012-08-09 Violation(s) & Outstanding Violations 646771
2091888 2012-08-09 Violation(s) & Outstanding Violations 646772
2091888 2012-08-09 Violation(s) & Outstanding Violations 646773
2091888 2012-08-09 Violation(s) & Outstanding Violations 646774
2091888 2012-08-09 Violation(s) & Outstanding Violations 646775
2092223 2012-08-16 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1220 hours to 1420 on August 16, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection
2095754 2012-08-23 Outstanding Violations - No Viols Req'd
2096381 2012-08-30 Outstanding Violations - No Viols Req'd
2097928 2012-09-05 Outstanding Violations - No Viols Req'd
2099760 2012-09-13 Outstanding Violations - No Viols Req'd
2101580 2012-09-20 Outstanding Violations - No Viols Req'd
2103263 2012-09-26 Violation(s) & Outstanding Violations 650280
2103263 2012-09-26 Violation(s) & Outstanding Violations 650281
2103263 2012-09-26 Violation(s) & Outstanding Violations 650282
2105375 2012-10-04 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1300 hours to 1500 on October 4, 2012. The purpose of this visit was to document readings of specific conductance and to conduct routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN


2107788 2012-10-16 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1300 hours to 1400 on October 16, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN
2112105 2012-11-01 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1330 on November 1, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN
2116114 2012-11-15 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 0800 hours to 1055 on November 15, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN
2123452 2012-12-13 Outstanding Violations - No Viols Req'd A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1420 on December 13, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN
2135695 2013-01-29 Outstanding Violations - No Viols Req'd

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 254656.0 166.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 FRACING FLUID WASTE 260.0 Bbl INJECTION DISPOSAL WELL 34-007-24355 B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) GARRETTSVILLE OH
2012-2 FRACING FLUID WASTE 240.0 Bbl INJECTION DISPOSAL WELL 34-083-24137 ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8) HOWARD OH
2012-2 PRODUCED FLUID 1351.0 Bbl INJECTION DISPOSAL WELL 34-083-24137 ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8) HOWARD OH
2012-2 FRACING FLUID WASTE 23216.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 PRODUCED FLUID 12974.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 FRACING FLUID WASTE 3511.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-2 PRODUCED FLUID 10121.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-2 PRODUCED FLUID 579.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 PRODUCED FLUID 419.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS VIENNA OH
2012-2 FRACING FLUID WASTE 19528.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 802.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2011-2 PRODUCED FLUID 784.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-1 DRILLING FLUID WASTE 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-1 FRACING FLUID WASTE 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-1 DRILLING FLUID WASTE 440.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-1 FRACING FLUID WASTE 5455.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING