If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21148 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.645747,"lon":-77.256094,"icon":""}]} |
County: Tioga | |
Municipality: Duncan Township | |
Operator Name: EQT PRODUCTION CO | |
Well Pad ID: 149046 | |
Farm/Lease Name: PHOENIX 590934 | |
First Permit Date: 2011-01-12 | |
Last Permit Date: 2011-12-21 | |
Spud Date: 2011-11-15 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 19 | |
Latitude: 41.645747 | |
Longitude: -77.256094 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2028267 | 2011-12-20 | No Violations Noted | ||
2030310 | 2011-12-20 | No Violations Noted | ||
2034357 | 2012-01-11 | No Violations Noted | ||
2066392 | 2012-05-09 | No Violations Noted | Inspection conducted on Pad S well site. WQS also conducting inspection on Pad S Impoundment area following reported flowback spill (300-500 gallons reported). | |
2067209 | 2012-05-09 | Violation(s) Noted | 639194 | |
2067209 | 2012-05-09 | Violation(s) Noted | 639195 | |
2067209 | 2012-05-09 | Violation(s) Noted | 639196 | |
2067590 | 2012-05-10 | Outstanding Violations - No Viols Req'd | 5/10/12 FUI insp to verify clean up status of 5/8/12 flowback spill. TLT | |
2074218 | 2012-05-31 | Violation(s) Noted | 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT | 641131 |
2074218 | 2012-05-31 | Violation(s) Noted | 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT | 641132 |
2074218 | 2012-05-31 | Violation(s) Noted | 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT | 641133 |
2074218 | 2012-05-31 | Violation(s) Noted | 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT | 641134 |
2074218 | 2012-05-31 | Violation(s) Noted | 5-31-12 incident inspection following notification of high conductivity in surface water (spring) and potential leaking impoundment. TLT | 641135 |
2074292 | 2012-06-01 | Outstanding Violations - No Viols Req'd | 6/1/12 FUI inspection to field screen/monitor release. TLT | |
2075700 | 2012-06-07 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1100 hours on June 7, 2012. The purpose of this visit was to evaluate the status of flowback removal from Impoundment 2 and to identify the extent of an elevated reading of specific conductance discovered earlier in the week.
Earlier in the week a seep entering the road ditch at 41°38’47”N, 77°14’55”W was discovered and exhibited an elevated reading of specific conductance, a sample was collected and submitted for laboratory analysis at that time. During this inspection, the flow measured of 5.41 mS. on the field conductivity meter and was followed up gradient. At 41°38’48”N, 77°15’00”W the flow at the road culvert above the road was measured and exhibited a reading of 8.59 mS. The upland slope that contributed flow to this culvert is the slope southeast of EQT’s Impoundment S. This location is approximately 1,700 feet from the Southeast corner of the Impoundment on a heading of 115°. |
|
2075838 | 2012-06-04 | Outstanding Violations - No Viols Req'd | FUI Inspection to evaluate impoundment drawdown and conduct additional field screening. TLT | |
2076502 | 2012-06-05 | Outstanding Violations - No Viols Req'd | The "northeast spring" (41° 39' 01"N, 77° 15' 12"W) = >19,999 uS/cm
The discharge of spring @ culvert (41° 39' 2.48"N, 77° 15' 8.49"W) = 14,500 uS/cm The unnamed tributary to Rock Run (originating at the sand spring) at the road culvert (41° 39' 07"N, 77° 14' 10"W) (This is also referred to as C&A Station W). = 1,900 uS/cm. The clean UNT to the north of C&A Station W - 52 uS/cm UNT culvert; The two unnamed tributaries came together and went under the road through a culvert (41° 39' 7.2"N, 77° 15' 10.368" W) = 937 uS/cm The unnamed tributary was followed from the road culvert to the mouth where it emptied into Rock Run. The readings were1,040uS near the road and remained around 850uS - 900 uS all the way downstream at which point it emptied into Rock Run with a conductivity of 801 uS/cm Rock Run upstream of the UNT (41° 39' 06"N, 77° 14' 53"W) = 30 uS/cm Rock Run Downstream (41° 38' 43"N, 77° 14' 43"W). 222uS/cm |
|
2076601 | 2012-06-06 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site from approximately 1045hours to 1500 hours on June 6, 2012. Representatives of the Department included Terra Tokarz (Water Quality Specialist), Jessica Ritenour (Professional Geologist ), Randy Farmeri (Professional Geologist Manager) and myself . Steve Kepler (Fisheries Biologist) and Heather Smiles (Fisheries Biologist) from the PA Fish and Boat Commission (PA F&BC ), were also present. Dave Allison and Mike Cromley from EQT were on-site. | |
2076602 | 2012-06-13 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1015 hours on June 13, 2012. The purpose of this visit was to evaluate the status of flowback removal from Impoundment 2, to identify the extent of an elevated reading of specific conductance discovered during previous inspections and to establish routine sampling points.
At the time of this inspection no flowback remained in the pit. Workers are seen in the attached photograph pressure washing the liner. Also noted were many holes identified by orange markings. A trench that was excavated to drain the seeps to the west of the impoundment was completed and the fluid was being pumped to a 500 barrel tank on site. C&A were preparing to dig additional sumps / trenches in the vicinity of 41° 38' 48" N, 77° 15' 0 W" to remove more liquid with elevated conductivity. |
|
2076668 | 2012-05-30 | Outstanding Violations - No Viols Req'd | ||
2076733 | 2012-06-08 | Outstanding Violations - No Viols Req'd | ||
2076919 | 2012-06-11 | Violation(s) & Outstanding Violations | 642081 | |
2076919 | 2012-06-11 | Violation(s) & Outstanding Violations | 642082 | |
2076919 | 2012-06-11 | Violation(s) & Outstanding Violations | 642083 | |
2077276 | 2012-06-12 | Outstanding Violations - No Viols Req'd | ||
2077279 | 2012-06-19 | Outstanding Violations - No Viols Req'd | ||
2077314 | 2012-06-20 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 0930 hours on June 20, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection. | |
2078900 | 2012-06-22 | Outstanding Violations - No Viols Req'd | ||
2079004 | 2012-06-26 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours on June 26, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection. | |
2081425 | 2012-07-05 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1000 hours on July 5, 2012. The purpose of this visit was to document readings of specific conductance noted during previous inspections and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. -MRN | |
2081849 | 2012-07-02 | Outstanding Violations - No Viols Req'd | ||
2082796 | 2012-07-12 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1500 on July 12, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection at the location noted below.
1. Headwaters Rock Run; 41° 39' 31 N, 77° 15' 06 W; Field Conductivity - 38 uS/cm 2. Downstream (DS) Rock Run; 41° 38' 43 N, 77° 14' 43 W; Field Conductivity - 77 uS/cm 3. Danzer Seep 1; 41° 38' 46 N 77° 14' 57 W; Field Conductivity - 12,800 uS/cm 4. Northeast Spring; 41° 39' 01 N, 77° 15' 12 W; Field Conductivity - >19,999 uS/cm 5. C&A Station W; UNT to Rock Run 41° 39' 07 N 77° 15' 10 W; Field Conductivity - 888 uS/cm 6. Sand Spring; C&A Stream A station 41° 38' 55 N, 77° 15' 31 W; Field Conductivity - 167 uS/cm No new violations were cited. - MRN |
|
2083599 | 2012-07-16 | Outstanding Violations - No Viols Req'd | ||
2085691 | 2012-07-18 | Outstanding Violations - No Viols Req'd | ||
2085900 | 2012-07-19 | Outstanding Violations - No Viols Req'd | ||
2086157 | 2012-07-25 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1230 hours to 1415 on July 25, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection at the location noted below.
Headwaters Rock Run; 41° 39' 31 N, 77° 15' 06 W; 40 uS/cm C&A Station W; UNT to Rock Run 41° 39' 07 N 77° 15' 10 W; 1,228 uS/cm Downstream (DS) Rock Run; 41° 38' 43 N, 77° 14' 43 W; 93 uS/cm Danzer Seep 1; 41° 38' 46 N 77° 14' 57 W; 11,600 uS/cm Northeast Spring; 41° 39' 01 N, 77° 15' 12 W; 19,500 uS/cm Sand Spring; C&A Stream A station 41° 38' 55 N, 77° 15' 31 W; 182 uS/cm The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. |
|
2086416 | 2012-07-23 | Outstanding Violations - No Viols Req'd | ||
2088545 | 2012-08-02 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1415 on August 2, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN | |
2089841 | 2012-07-30 | Outstanding Violations - No Viols Req'd | ||
2090037 | 2012-08-02 | Outstanding Violations - No Viols Req'd | ||
2090399 | 2012-08-09 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1045 hours to 1330 on August 9, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection - MRN | |
2091888 | 2012-08-09 | Violation(s) & Outstanding Violations | 646771 | |
2091888 | 2012-08-09 | Violation(s) & Outstanding Violations | 646772 | |
2091888 | 2012-08-09 | Violation(s) & Outstanding Violations | 646773 | |
2091888 | 2012-08-09 | Violation(s) & Outstanding Violations | 646774 | |
2091888 | 2012-08-09 | Violation(s) & Outstanding Violations | 646775 | |
2092223 | 2012-08-16 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1220 hours to 1420 on August 16, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection | |
2095754 | 2012-08-23 | Outstanding Violations - No Viols Req'd | ||
2096381 | 2012-08-30 | Outstanding Violations - No Viols Req'd | ||
2097928 | 2012-09-05 | Outstanding Violations - No Viols Req'd | ||
2099760 | 2012-09-13 | Outstanding Violations - No Viols Req'd | ||
2101580 | 2012-09-20 | Outstanding Violations - No Viols Req'd | ||
2103263 | 2012-09-26 | Violation(s) & Outstanding Violations | 650280 | |
2103263 | 2012-09-26 | Violation(s) & Outstanding Violations | 650281 | |
2103263 | 2012-09-26 | Violation(s) & Outstanding Violations | 650282 | |
2105375 | 2012-10-04 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1300 hours to 1500 on October 4, 2012. The purpose of this visit was to document readings of specific conductance and to conduct routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN
|
|
2107788 | 2012-10-16 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1300 hours to 1400 on October 16, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. The well pad area was not inspected at this time. Violations cited on 5/31/12 and 6/19/12 remain outstanding, no new violations were cited during this inspection. - MRN | |
2112105 | 2012-11-01 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1330 on November 1, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN | |
2116114 | 2012-11-15 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 0800 hours to 1055 on November 15, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN | |
2123452 | 2012-12-13 | Outstanding Violations - No Viols Req'd | A follow up inspection was conducted at the EQT Pad S Flowback Impoundment 2 site at approximately 1200 hours to 1420 on December 13, 2012. The purpose of this visit was to document readings of specific conductance and conducting routine sample collection. - MRN | |
2135695 | 2013-01-29 | Outstanding Violations - No Viols Req'd |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 254656.0 | 166.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 260.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-24355 | B & B OILFIELD SERVICE - MILLER & CO #3 (SWIW #28) | GARRETTSVILLE | OH |
2012-2 | FRACING FLUID WASTE | 240.0 | Bbl | INJECTION DISPOSAL WELL | 34-083-24137 | ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8) | HOWARD | OH |
2012-2 | PRODUCED FLUID | 1351.0 | Bbl | INJECTION DISPOSAL WELL | 34-083-24137 | ELKHEAD GAS & OIL - CHAPIN WELL # 7 (SWIW # 8) | HOWARD | OH |
2012-2 | FRACING FLUID WASTE | 23216.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | PRODUCED FLUID | 12974.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-2 | FRACING FLUID WASTE | 3511.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 10121.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR0123 | HYDRO RECOVERY - BLOSSBURG | BLOSSBURG | PA |
2012-2 | PRODUCED FLUID | 579.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21438 | KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | PRODUCED FLUID | 419.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-21447 | KLEESE #2 (SWIW #19) - KLEESE DEVELOPMENT ASSOCS | VIENNA | OH |
2012-2 | FRACING FLUID WASTE | 19528.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | PRODUCED FLUID | 802.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-2 | PRODUCED FLUID | 784.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-1 | DRILLING FLUID WASTE | 110.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-1 | FRACING FLUID WASTE | 110.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2012-1 | DRILLING FLUID WASTE | 440.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-1 | FRACING FLUID WASTE | 5455.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |