X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24914"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24914
 
| Well ID: 37-129-24914
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.332286, -79.200278 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.332286, -79.200278 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Fairfield Township, Westmoreland County, Pennsylvania|Fairfield Township]]
 
|-
 
|-
 
| Operator Name: [[TEXAS KEYSTONE INC]]
 
| Operator Name: [[TEXAS KEYSTONE INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: JOHN BORCHIN 4-WES
 
|-
 
|-
 
| First Permit Date: 2003-04-16
 
| First Permit Date: 2003-04-16
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: 1
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 5
 
|-
 
|-
 
| Latitude: 40.332286
 
| Latitude: 40.332286
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2003-0
| style="text-align:right;" | 391.0
+
| style="text-align:right;" | 15512.0
| style="text-align:right;" | 183.0
+
| style="text-align:right;" | 232.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2004-0
 +
| style="text-align:right;" | 2199.0
 +
| style="text-align:right;" | 189.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 43: Line 62:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2005-0
| style="text-align:right;" | 232.0
+
| style="text-align:right;" | 1779.0
| style="text-align:right;" | 81.0
+
| style="text-align:right;" | 278.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2006-0
| style="text-align:right;" | 306.0
+
| style="text-align:right;" | 1022.0
| style="text-align:right;" | 71.0
+
| style="text-align:right;" | 208.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2007-0
| style="text-align:right;" | 604.0
+
| style="text-align:right;" | 867.0
| style="text-align:right;" | 127.0
+
| style="text-align:right;" | 155.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 79: Line 98:
 
|-
 
|-
 
|-
 
|-
| 2007-0
+
| 2009-0
| style="text-align:right;" | 867.0
+
| style="text-align:right;" | 604.0
| style="text-align:right;" | 155.0
+
| style="text-align:right;" | 127.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 306.0
 +
| style="text-align:right;" | 71.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 88: Line 116:
 
|-
 
|-
 
|-
 
|-
| 2006-0
+
| 2011-0
| style="text-align:right;" | 1022.0
+
| style="text-align:right;" | 232.0
| style="text-align:right;" | 208.0
+
| style="text-align:right;" | 81.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 97: Line 125:
 
|-
 
|-
 
|-
 
|-
| 2005-0
+
| 2012-0
| style="text-align:right;" | 1779.0
+
| style="text-align:right;" | 666.0
| style="text-align:right;" | 278.0
+
| style="text-align:right;" | 177.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 106: Line 134:
 
|-
 
|-
 
|-
 
|-
| 2004-0
+
| 2013-0
| style="text-align:right;" | 2199.0
+
| style="text-align:right;" | 391.0
| style="text-align:right;" | 189.0
+
| style="text-align:right;" | 183.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 115: Line 143:
 
|-
 
|-
 
|-
 
|-
| 2003-0
+
| 2014-0
| style="text-align:right;" | 15512.0
+
| style="text-align:right;" | 280.0
| style="text-align:right;" | 232.0
+
| style="text-align:right;" | 212.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 124: Line 152:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 135: Line 169:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-0
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 40.0
 +
| Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
| FLUID RECOVERY SERVICE JOSEPHINE FACILITY
 +
| JOSEPHINE
 +
| PA
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 143: Line 194:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1200874
 
| 1200874
Line 148: Line 201:
 
| No Violations Noted
 
| No Violations Noted
 
| well staked/proposed site >200' from H2O supply & stream - objection not sustainable
 
| well staked/proposed site >200' from H2O supply & stream - objection not sustainable
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 156: Line 211:
 
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground
 
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground
 
| 358779
 
| 358779
 +
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 +
|
 
|-
 
|-
 
|-
 
|-
Line 163: Line 220:
 
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground
 
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground
 
| 358780
 
| 358780
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 
|-
 
|-
 
|-
 
|-
Line 170: Line 229:
 
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline
 
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline
 
| 363997
 
| 363997
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 177: Line 238:
 
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline
 
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline
 
| 363997
 
| 363997
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 184: Line 247:
 
| joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures
 
| joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures
 
| 367448
 
| 367448
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 191: Line 256:
 
| equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control
 
| equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control
 
| 384426
 
| 384426
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 197: Line 264:
 
| No Violations Noted
 
| No Violations Noted
 
| equipped/tank&tag ok/E&S advice - pipeline&road
 
| equipped/tank&tag ok/E&S advice - pipeline&road
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 204: Line 273:
 
| No Violations Noted
 
| No Violations Noted
 
| equipped/restored - advice on E&S road & fabric/tank&tag ok
 
| equipped/restored - advice on E&S road & fabric/tank&tag ok
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 211: Line 282:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling completed on 7/3/2003. Well site has been restored.  Brine tank is in sound condition. Well site has approximately 95% vegetative cover.  Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well.  Operator should continue to monitor the well site for erosion and sedimentation.
 
| Drilling completed on 7/3/2003. Well site has been restored.  Brine tank is in sound condition. Well site has approximately 95% vegetative cover.  Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well.  Operator should continue to monitor the well site for erosion and sedimentation.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 218: Line 291:
 
| No Violations Noted
 
| No Violations Noted
 
| Drilling completed on 7/3/2003. Well site has been restored.  Brine tank is in sound condition. Well site has approximately 95% vegetative cover.  Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation.  Operator should continue to monitor the well site for erosion and sedimentation.
 
| Drilling completed on 7/3/2003. Well site has been restored.  Brine tank is in sound condition. Well site has approximately 95% vegetative cover.  Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation.  Operator should continue to monitor the well site for erosion and sedimentation.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 08:36, 26 June 2015

Well Details

Well ID: 37-129-24914
Loading map...
County: Westmoreland
Municipality: Fairfield Township
Operator Name: TEXAS KEYSTONE INC
Well Pad ID:
Farm/Lease Name: JOHN BORCHIN 4-WES
First Permit Date: 2003-04-16
Last Permit Date: 2003-04-16
Spud Date: 2003-07-03
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 5
Latitude: 40.332286
Longitude: -79.200278

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2003-0 15512.0 232.0 0.0 0.0 0.0 0.0
2004-0 2199.0 189.0 0.0 0.0 0.0 0.0
2005-0 1779.0 278.0 0.0 0.0 0.0 0.0
2006-0 1022.0 208.0 0.0 0.0 0.0 0.0
2007-0 867.0 155.0 0.0 0.0 0.0 0.0
2008-0 776.0 197.0 0.0 0.0 0.0 0.0
2009-0 604.0 127.0 0.0 0.0 0.0 0.0
2010-0 306.0 71.0 0.0 0.0 0.0 0.0
2011-0 232.0 81.0 0.0 0.0 0.0 0.0
2012-0 666.0 177.0 0.0 0.0 0.0 0.0
2013-0 391.0 183.0 0.0 0.0 0.0 0.0
2014-0 280.0 212.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 40.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1200874 2003-01-15 No Violations Noted well staked/proposed site >200' from H2O supply & stream - objection not sustainable
1256183 2003-07-25 Violation(s) Noted drilling complete/E&S ok/drill cuttings below casing seat stored on ground 358779 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
1256183 2003-07-25 Violation(s) Noted drilling complete/E&S ok/drill cuttings below casing seat stored on ground 358780 401CSL - Discharge of pollultional material to waters of Commonwealth.
1268103 2003-09-09 Violation(s) Noted equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline 363997 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1268103 2003-09-09 Violation(s) Noted equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline 363997 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1275335 2003-10-02 Violation(s) Noted joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures 367448 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1314156 2004-03-02 Outstanding Violations - Viols Req'd equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control 384426 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1386274 2004-10-05 No Violations Noted equipped/tank&tag ok/E&S advice - pipeline&road
1474202 2005-08-17 No Violations Noted equipped/restored - advice on E&S road & fabric/tank&tag ok
1811572 2009-07-07 No Violations Noted Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation.
1813138 2009-07-15 No Violations Noted Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation.

For data sources see[3]

References