If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-24914 | | Well ID: 37-129-24914 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.332286, -79.200278 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Westmoreland County, Pennsylvania|Westmoreland]] | ||
+ | |- | ||
+ | | Municipality: [[Fairfield Township, Westmoreland County, Pennsylvania|Fairfield Township]] | ||
|- | |- | ||
| Operator Name: [[TEXAS KEYSTONE INC]] | | Operator Name: [[TEXAS KEYSTONE INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: JOHN BORCHIN 4-WES | ||
|- | |- | ||
| First Permit Date: 2003-04-16 | | First Permit Date: 2003-04-16 | ||
Line 17: | Line 25: | ||
| Horizontal: No | | Horizontal: No | ||
|- | |- | ||
− | | Violations: | + | | Well Status: ACTIVE |
+ | |- | ||
+ | | Violations: 5 | ||
|- | |- | ||
| Latitude: 40.332286 | | Latitude: 40.332286 | ||
Line 34: | Line 44: | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
|- | |- | ||
− | | | + | | 2003-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 15512.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 232.0 |
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2004-0 | ||
+ | | style="text-align:right;" | 2199.0 | ||
+ | | style="text-align:right;" | 189.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 43: | Line 62: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2005-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1779.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 278.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 52: | Line 71: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2006-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 1022.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 208.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 61: | Line 80: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2007-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 867.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 155.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 79: | Line 98: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2009-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 604.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 127.0 |
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2010-0 | ||
+ | | style="text-align:right;" | 306.0 | ||
+ | | style="text-align:right;" | 71.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 88: | Line 116: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2011-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 232.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 81.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 97: | Line 125: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2012-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 666.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 177.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 106: | Line 134: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2013-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 391.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 183.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 115: | Line 143: | ||
|- | |- | ||
|- | |- | ||
− | | | + | | 2014-0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 280.0 |
− | | style="text-align:right;" | | + | | style="text-align:right;" | 212.0 |
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
| style="text-align:right;" | 0.0 | | style="text-align:right;" | 0.0 | ||
Line 124: | Line 152: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 135: | Line 169: | ||
!scope="col" | FACILITY CITY | !scope="col" | FACILITY CITY | ||
!scope="col" | FACILITY STATE | !scope="col" | FACILITY STATE | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | PRODUCED FLUID | ||
+ | | style="text-align:right;" | 40.0 | ||
+ | | Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
+ | | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | ||
+ | | JOSEPHINE | ||
+ | | PA | ||
+ | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 143: | Line 194: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1200874 | | 1200874 | ||
Line 148: | Line 201: | ||
| No Violations Noted | | No Violations Noted | ||
| well staked/proposed site >200' from H2O supply & stream - objection not sustainable | | well staked/proposed site >200' from H2O supply & stream - objection not sustainable | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 156: | Line 211: | ||
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground | | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | ||
| 358779 | | 358779 | ||
+ | | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 163: | Line 220: | ||
| drilling complete/E&S ok/drill cuttings below casing seat stored on ground | | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | ||
| 358780 | | 358780 | ||
+ | | 401CSL - Discharge of pollultional material to waters of Commonwealth. | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 170: | Line 229: | ||
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | ||
| 363997 | | 363997 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 177: | Line 238: | ||
| equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | ||
| 363997 | | 363997 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 184: | Line 247: | ||
| joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures | | joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures | ||
| 367448 | | 367448 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 191: | Line 256: | ||
| equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control | | equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control | ||
| 384426 | | 384426 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 197: | Line 264: | ||
| No Violations Noted | | No Violations Noted | ||
| equipped/tank&tag ok/E&S advice - pipeline&road | | equipped/tank&tag ok/E&S advice - pipeline&road | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 204: | Line 273: | ||
| No Violations Noted | | No Violations Noted | ||
| equipped/restored - advice on E&S road & fabric/tank&tag ok | | equipped/restored - advice on E&S road & fabric/tank&tag ok | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 211: | Line 282: | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation. | | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 218: | Line 291: | ||
| No Violations Noted | | No Violations Noted | ||
| Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation. | | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-129-24914 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.332286,"lon":-79.200278,"icon":""}]} |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: TEXAS KEYSTONE INC | |
Well Pad ID: | |
Farm/Lease Name: JOHN BORCHIN 4-WES | |
First Permit Date: 2003-04-16 | |
Last Permit Date: 2003-04-16 | |
Spud Date: 2003-07-03 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 5 | |
Latitude: 40.332286 | |
Longitude: -79.200278 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2003-0 | 15512.0 | 232.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2004-0 | 2199.0 | 189.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2005-0 | 1779.0 | 278.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 1022.0 | 208.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 867.0 | 155.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 776.0 | 197.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 604.0 | 127.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 306.0 | 71.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 232.0 | 81.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 666.0 | 177.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 391.0 | 183.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 280.0 | 212.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 40.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1200874 | 2003-01-15 | No Violations Noted | well staked/proposed site >200' from H2O supply & stream - objection not sustainable | |||
1256183 | 2003-07-25 | Violation(s) Noted | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | 358779 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | |
1256183 | 2003-07-25 | Violation(s) Noted | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | 358780 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1268103 | 2003-09-09 | Violation(s) Noted | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | 363997 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1268103 | 2003-09-09 | Violation(s) Noted | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | 363997 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1275335 | 2003-10-02 | Violation(s) Noted | joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures | 367448 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1314156 | 2004-03-02 | Outstanding Violations - Viols Req'd | equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control | 384426 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1386274 | 2004-10-05 | No Violations Noted | equipped/tank&tag ok/E&S advice - pipeline&road | |||
1474202 | 2005-08-17 | No Violations Noted | equipped/restored - advice on E&S road & fabric/tank&tag ok | |||
1811572 | 2009-07-07 | No Violations Noted | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation. | |||
1813138 | 2009-07-15 | No Violations Noted | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation. |
For data sources see[3]