X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24914"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24914
 
| Well ID: 37-129-24914
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.332287, -79.200279 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.332287, -79.200279 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/03/2003
+
| Spud Date: 2003-07-03
 
|-
 
|-
| Permit Date: 4/16/2003
+
| Permit Date: 2003-04-16
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 232
 
| style="text-align: right;" | 232
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 74: Line 99:
 
| style="text-align: right;" | 189
 
| style="text-align: right;" | 189
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 83: Line 108:
 
| style="text-align: right;" | 278
 
| style="text-align: right;" | 278
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 92: Line 117:
 
| style="text-align: right;" | 208
 
| style="text-align: right;" | 208
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 101: Line 126:
 
| style="text-align: right;" | 155
 
| style="text-align: right;" | 155
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 110: Line 135:
 
| style="text-align: right;" | 197
 
| style="text-align: right;" | 197
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 119: Line 144:
 
| style="text-align: right;" | 127
 
| style="text-align: right;" | 127
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 128: Line 153:
 
| style="text-align: right;" | 71
 
| style="text-align: right;" | 71
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 137: Line 162:
 
| style="text-align: right;" | 81
 
| style="text-align: right;" | 81
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 146: Line 171:
 
| style="text-align: right;" | 177
 
| style="text-align: right;" | 177
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 155: Line 180:
 
| style="text-align: right;" | 183
 
| style="text-align: right;" | 183
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 164: Line 189:
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 212
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 173: Line 198:
 
| style="text-align: right;" | 177
 
| style="text-align: right;" | 177
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 182: Line 207:
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 191: Line 216:
 
| style="text-align: right;" | 356
 
| style="text-align: right;" | 356
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 250: Line 275:
 
| 1200874
 
| 1200874
 
| Primary Facility
 
| Primary Facility
| 01/15/2003
+
| 2003-01-15
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 282:
 
| 1256183
 
| 1256183
 
| Primary Facility
 
| Primary Facility
| 07/25/2003
+
| 2003-07-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 264: Line 289:
 
| 1268103
 
| 1268103
 
| Primary Facility
 
| Primary Facility
| 09/09/2003
+
| 2003-09-09
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 271: Line 296:
 
| 1275335
 
| 1275335
 
| Primary Facility
 
| Primary Facility
| 10/02/2003
+
| 2003-10-02
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 278: Line 303:
 
| 1314156
 
| 1314156
 
| Primary Facility
 
| Primary Facility
| 03/02/2004
+
| 2004-03-02
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 285: Line 310:
 
| 1386274
 
| 1386274
 
| Primary Facility
 
| Primary Facility
| 10/05/2004
+
| 2004-10-05
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 292: Line 317:
 
| 1474202
 
| 1474202
 
| Primary Facility
 
| Primary Facility
| 08/17/2005
+
| 2005-08-17
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 299: Line 324:
 
| 1811572
 
| 1811572
 
| Primary Facility
 
| Primary Facility
| 07/07/2009
+
| 2009-07-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 331:
 
| 1813138
 
| 1813138
 
| Primary Facility
 
| Primary Facility
| 07/15/2009
+
| 2009-07-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 355: Line 380:
 
| 358779
 
| 358779
 
| 07/25/2003
 
| 07/25/2003
| 09/09/2003
+
| 2003-07-25
 
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 
| Administrative
 
| Administrative
Line 363: Line 388:
 
| 358780
 
| 358780
 
| 07/25/2003
 
| 07/25/2003
| 09/09/2003
+
| 2003-07-25
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| 401 CSL - Discharge of pollultional material to waters of Commonwealth.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 371: Line 396:
 
| 363997
 
| 363997
 
| 09/09/2003
 
| 09/09/2003
| 08/26/2004
+
| 2003-09-09
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 379: Line 404:
 
| 367448
 
| 367448
 
| 10/02/2003
 
| 10/02/2003
| 08/26/2004
+
| 2003-10-02
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 387: Line 412:
 
| 384426
 
| 384426
 
| 03/02/2004
 
| 03/02/2004
| 08/26/2004
+
| 2004-03-02
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 417: Line 442:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 426: Line 451:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/09/2003
+
| 2003-09-09
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 435: Line 460:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/26/2004
+
| 2004-08-26
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 443: Line 468:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/20/2004
+
| 2004-08-20
| 08/26/2004
+
| 2004-08-26
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
Line 452: Line 477:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/20/2004
+
| 2004-08-20
| 08/26/2004
+
| 2004-08-26
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
Line 461: Line 486:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 08/20/2004
+
| 2004-08-20
| 08/26/2004
+
| 2004-08-26
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
 
| style="text-align: right;" | $13,400.00
Line 482: Line 507:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:59, 1 August 2019

Well Details

Well ID: 37-129-24914
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: JOHN BORCHIN 4-WES
License Status: Active
Spud Date: 2003-07-03
Permit Date: 2003-04-16
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.332287
Longitude: -79.200279

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 TEXAS KEYSTONE INC 15,512.00 232 0.00 0 0.00 0
2004 TEXAS KEYSTONE INC 2,199.00 189 0.00 0 0.00 0
2005 TEXAS KEYSTONE INC 1,779.00 278 0.00 0 0.00 0
2006 TEXAS KEYSTONE INC 1,022.00 208 0.00 0 0.00 0
2007 TEXAS KEYSTONE INC 867.00 155 0.00 0 0.00 0
2008 TEXAS KEYSTONE INC 776.00 197 0.00 0 0.00 0
2009 TEXAS KEYSTONE INC 604.00 127 0.00 0 0.00 0
2010 TEXAS KEYSTONE INC 306.00 71 0.00 0 0.00 0
2011 TEXAS KEYSTONE INC 232.00 81 0.00 0 0.00 0
2012 TEXAS KEYSTONE INC 666.00 177 0.00 0 0.00 0
2013 TEXAS KEYSTONE INC 391.00 183 0.00 0 0.00 0
2014 TEXAS KEYSTONE INC 280.00 212 0.00 0 0.00 0
2015 TEXAS KEYSTONE INC 417.00 177 0.00 0 0.00 0
2016 DIVERSIFIED OIL & GAS LLC 66.00 13 0.00 0 0.00 0
2017 DIVERSIFIED OIL & GAS LLC 1,168.00 356 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 460.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-A00 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2016-A00 Produced Fluid (in Barrels) RWC 802 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1200874 Primary Facility 2003-01-15 Complaint Inspection No Violations Noted well staked/proposed site >200' from H2O supply & stream - objection not sustainable
1256183 Primary Facility 2003-07-25 Routine/Complete Inspection Violation(s) Noted drilling complete/E&S ok/drill cuttings below casing seat stored on ground
1268103 Primary Facility 2003-09-09 Compliance Evaluation Violation(s) Noted equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline
1275335 Primary Facility 2003-10-02 Compliance Evaluation Violation(s) Noted joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures
1314156 Primary Facility 2004-03-02 Compliance Evaluation Outstanding Violations - Viols Req'd equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control
1386274 Primary Facility 2004-10-05 Compliance Evaluation No Violations Noted equipped/tank&tag ok/E&S advice - pipeline&road
1474202 Primary Facility 2005-08-17 Site Restoration No Violations Noted equipped/restored - advice on E&S road & fabric/tank&tag ok
1811572 Primary Facility 2009-07-07 Routine/Complete Inspection No Violations Noted Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation.
1813138 Primary Facility 2009-07-15 Routine/Complete Inspection No Violations Noted Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation.
2462287 Primary Facility 2016-03-01 Complaint Inspection Violation(s) Noted Inspection performed in response to a complaint of an ongoing leak received by the Department on 2/29/2016. Access road gated and locked. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears full. During inspection, Department observed two active leaking points. First active leak observed at the T-joint connector of the inflow flange located at the top of the brine tank. An approximate area measuring 4’x4’ directly below the leak appears to be impacted, as indicated by visible staining of the ground/vegetation. Second active leak observed at the outflow flange located at the base of the brine tank. An approximate area measuring 2’x2’ directly below the leaking outflow flange appears to be impacted, as indicated by visible dampness and pooling of fluids, with no evidence of sheen. Production chart located onsite is dated 8-20-15.

SEE ADDT'L COMMENTS ON PAPER SAIR

2462529 Primary Facility 2016-03-02 Administrative/File Review Outstanding Violations - No Viols Req'd Operator emailed written response and supporting documents relating to Inspection Record #2462287 and Enforcement Record #340587.
2463344 Primary Facility 2016-03-07 Routine/Partial Inspection Outstanding Violations - No Viols Req'd Inspection performed as part of a follow-up to 3/1/2015 inspection (Insp.# 2462287 Enf.# 340587). At the time of inspection brine tank disconnected and removed from site. Impacted area has been excavated, seeded and mulched. Site stable and no E&S issues observed in relation to site.
2476737 Primary Facility 2016-04-15 Compliance Evaluation No Violations Noted This inspection was performed as a Compliance Evaluation to Inspection ID 2462287. At the time of inspection impacted area has been cleaned-up in accordance with spill policy, seeded and mulched. Site stable. Department recommends Operator continue to perform routine maintenance of site in order to prevent a potential pollution event from occurring and to ensure the stability of site is maintained.

Previously issued violations have been corrected.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1256183 358779 07/25/2003 2003-07-25 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table Administrative
1256183 358780 07/25/2003 2003-07-25 401 CSL - Discharge of pollultional material to waters of Commonwealth. Environmental Health & Safety
1268103 363997 09/09/2003 2003-09-09 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1275335 367448 10/02/2003 2003-10-02 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1314156 384426 03/02/2004 2004-03-02 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
2462287 753615 2016-03-01 2016-04-15 78.57(a) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
358779 123214 NOV - Notice of Violation Comply/Closed 2003-09-09
358780 123214 NOV - Notice of Violation Comply/Closed 2003-09-09
363997 125105 NOV - Notice of Violation Comply/Closed 2004-08-26
363997 169348 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-08-20 2004-08-26 $13,400.00 $13,400.00
367448 169348 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-08-20 2004-08-26 $13,400.00 $13,400.00
384426 169348 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-08-20 2004-08-26 $13,400.00 $13,400.00
753615 340587 NOV - Notice of Violation 2016-05-10

For data sources see[6]

References