X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0104101206002

Well Details

Well ID: 0104101206002
Loading map...
Location: 00/06-12-010-10W4/2
Location Alias: 00/06-12-10-10 W4M
Location Alias 2: 00/06-12-010-10 W4/02
Country: Canada
Province: Alberta
Township: 010
Meridian: 4
Range: 10
Section: 12
County/Municipality: County of Forty Mile No. 8
Well Name: TERRAQUEST BOW ISLAND 6-12-10-10
Operator Name: Dove Energy Inc.
License Number: 0056183
License Date: 1975-12-11
License Status: RecCertified
Spud Date: 1975-12-21
Final Drill Date: 1976-01-08
Well Total Depth: 978.40 m
Surface Hole Latitude: 49.807488
Surface Hole Longitude: -111.235910

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-11 Obtained License
1976-01-03 Drill Stem Test Performed
1976-01-08 Finished Drilling
1976-01-08 Well Mode changed to Drilled and Cased
1976-01-10 Drill Stem Test Performed
1976-01-11 Drill Stem Test Performed
1976-01-12 Production Casing Operation Performed
1976-01-21 Perforation Treatment Performed - Jet Perforation
1976-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-22 Perforation Treatment Performed - Jet Perforation
1976-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-27 Perforation Treatment Performed - Cement Squeeze
1976-01-29 Perforation Treatment Performed - Jet Perforation
1982-12-15 Perforation Treatment Performed - Jet Perforation
1982-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-16 Perforation Treatment Performed - Cement Squeeze
1999-06-16 Well Log Performed
1999-06-17 Perforation Treatment Performed - Jet Perforation
1999-06-17 Well Log Performed
1999-06-20 Perforation Treatment Performed - Fractured
1999-06-28 Perforation Treatment Performed - Cement Squeeze
2001-05-26 Perforation Treatment Performed - Jet Perforation
2001-05-29 Perforation Treatment Performed - Fractured
2001-06-01 Well Began Production
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Flowing
2001-09-30 Well Fluid changed to Gas
2001-09-30 Well Mode changed to Suspended
2011-01-14 Well Fluid changed to Gas
2011-01-14 Well Mode changed to Closed
2011-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-03 Plug Back Performed
2011-08-03 Well Fluid changed to Gas
2011-08-03 Well Mode changed to Abandoned Zone
2011-08-04 Well Abandoned
2011-08-04 Well Fluid changed to Gas
2011-08-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-21 Perforation 957.70 958.00 7
1999-06-17 Perforation 915.50 921.50 14
1999-06-20 Fracture 915.50 921.50 0
1999-06-28 Cement Squeeze 915.50 921.50 0
2001-05-26 Perforation 702.90 704.10 17
2001-05-26 Perforation 704.70 705.90 17
2001-05-29 Fracture 702.90 705.90 0
2011-08-03 Packing Device Capped w/Cement 228.00 236.00 0
1976-01-22 Acid Treatment 957.70 958.00 0
1976-01-22 Perforation 952.80 953.10 7
1976-01-26 Acid Treatment 957.70 958.00 0
1976-01-27 Cement Squeeze 952.80 953.10 0
1976-01-29 Perforation 952.80 953.10 7
1982-12-15 Perforation 242.00 242.50 13
1982-12-16 Acid Treatment 242.00 242.50 0
1982-12-16 Cement Squeeze 242.00 242.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1793 0.0 0.0 0.0

For data sources see[5]

References