X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114112606000

Well Details

Well ID: 0114112606000
Loading map...
Location: 00/06-26-011-11W4/0
Location Alias: 00/06-26-11-11 W4M
Location Alias 2: 00/06-26-011-11 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 11
Section: 26
County/Municipality: County of Forty Mile No. 8
Well Name: CNRL BI 6-26-11-11
Operator Name: Canadian Natural Resources Limited
License Number: 0215275
License Date: 1998-05-19
License Status: Issued
Spud Date: 1998-05-26
Final Drill Date: 1998-05-29
Well Total Depth: 974.00 m
Surface Hole Latitude: 49.938382
Surface Hole Longitude: -111.406065

For data sources see[1][2]

Well History

Date Event
1998-05-19 Obtained License
1998-05-27 Direction Drilling Operation Performed - Deviate
1998-05-27 Surface Casing Operation Performed
1998-05-29 Finished Drilling
1998-05-29 Well Log Performed
1998-05-29 Well Mode changed to Drilled and Cased
1998-05-30 Production Casing Operation Performed
1998-05-30 Rig Released
1998-06-03 Well Log Performed
1998-06-05 Perforation Treatment Performed - Jet Perforation
1998-06-08 Perforation Treatment Performed - Cement Squeeze
1998-06-08 Perforation Treatment Performed - Jet Perforation
1998-06-08 Plug Back Performed
1998-06-08 Well Log Performed
1998-06-11 Perforation Treatment Performed - Selective Jet Perforations
1998-06-12 Perforation Treatment Performed - Jet Perforation
1998-06-15 Well Began Production
1998-06-15 Well Fluid changed to Crude Oil
1998-06-15 Well Mode changed to Pumping
1998-08-31 Perforation Treatment Performed - Jet Perforation
2017-03-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-05-27 326.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-06-05 Perforation 923.50 925.00 13
1998-06-08 Perforation 928.50 929.50 13
1998-06-08 Cement Squeeze 923.50 929.50 0
1998-06-11 Selective Jet Perforations 925.20 925.50 0
1998-06-11 Selective Jet Perforations 924.50 924.80 0
1998-06-11 Selective Jet Perforations 924.20 924.20 0
1998-06-12 Perforation 923.50 925.50 13
1998-08-31 Perforation 928.00 928.50 13
1998-08-31 Perforation 925.50 927.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4426 0.0 0.0 0.0
1999 8670 0.0 0.0 0.0
2000 8640 0.0 0.0 0.0
2001 8669 0.0 0.0 0.0
2002 8595 0.0 0.0 0.0
2003 8700 0.0 0.0 0.0
2004 8598 0.0 0.0 0.0
2005 8648 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8733 0.0 0.0 0.0
2010 8678 0.0 0.0 0.0
2011 8719 0.0 0.0 0.0
2012 8652 0.0 0.0 0.0
2013 8710 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 8718 0.0 0.0 0.0
2016 8756 0.0 0.0 0.0
2017 8331 0.0 0.0 0.0
2018 8694 0.0 0.0 0.0
2019 7210 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References