X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124192611000

Well Details

Well ID: 0124192611000
Loading map...
Location: 00/11-26-012-19W4/0
Location Alias: 00/11-26-12-19 W4M
Location Alias 2: 00/11-26-012-19 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 19
Section: 26
County/Municipality: Lethbridge County
Well Name: ARROW RETLAW 11-26-12-19
Operator Name: Steelhead Petroleum Ltd.
License Number: 0062961
License Date: 1977-02-25
License Status: RecCertified
Spud Date: 1977-03-16
Final Drill Date: 1977-03-21
Well Total Depth: 1129.00 m
Surface Hole Latitude: 50.029269
Surface Hole Longitude: -112.499847

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-25 Obtained License
1977-03-21 Finished Drilling
1977-03-21 Well Mode changed to Drilled and Cased
1977-03-22 Drill Stem Test Performed
1977-03-23 Drill Stem Test Performed
1977-03-23 Production Casing Operation Performed
1977-06-01 Well Began Production
1977-06-01 Well Fluid changed to Gas
1977-06-01 Well Mode changed to Flowing
1977-06-06 Perforation Treatment Performed - Jet Perforation
1985-03-19 Well Log Performed
1985-04-19 Perforation Treatment Performed - Jet Perforation
1985-06-01 Well Fluid changed to Gas
1985-06-01 Well Mode changed to Suspended
1985-07-01 Well Fluid changed to Gas
1985-07-01 Well Mode changed to Suspended
1986-12-01 Well Fluid changed to Gas
1986-12-01 Well Mode changed to Flowing
1988-03-01 Well Fluid changed to Gas
1988-03-01 Well Mode changed to Suspended
1992-03-18 Well Fluid changed to Gas
1992-03-18 Well Mode changed to Flowing
1996-10-31 Well Fluid changed to Gas
1996-10-31 Well Mode changed to Suspended
1997-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-28 Plug Back Performed
1997-05-28 Well Fluid changed to Gas
1997-05-28 Well Mode changed to Abandoned Zone
1997-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-29 Plug Back Performed
1997-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-06 Perforation 1066.80 1068.60 7
1985-04-19 Perforation 1096.40 1097.60 7
1997-05-28 Packing Device Capped w/Cement 1067.70 1076.00 0
1997-05-29 Packing Device Capped w/Cement 1050.50 1058.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4407 0.0 0.0 0.0
1978 4110 0.0 0.0 0.0
1979 5154 0.0 0.0 0.0
1980 4520 0.0 0.0 0.0
1981 3211 0.0 0.0 0.0
1982 5659 0.0 0.0 0.0
1983 4299 0.0 0.0 0.0
1984 4018 0.0 0.0 0.0
1985 1321 0.0 0.0 0.0
1986 167 0.0 0.0 0.0
1992 5513 0.0 0.0 0.0
1993 8347 0.0 0.0 0.0
1994 8334 0.0 0.0 0.0
1995 20 0.0 0.0 0.0

For data sources see[5]

References