X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154241014000

Well Details

Well ID: 0154241014000
Loading map...
Location: 00/14-10-015-24W4/0
Location Alias: 00/14-10-15-24 W4M
Location Alias 2: 00/14-10-015-24 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 24
Section: 10
County/Municipality: Vulcan County
Well Name: PIONEER CANADA CHAUNCEY 14-10-15-24
Operator Name: TAQA North Ltd.
License Number: 0083309
License Date: 1980-06-06
License Status: Re-Entered
Spud Date: 1980-06-11
Final Drill Date: 1980-07-20
Well Total Depth: 2427.00 m
Surface Hole Latitude: 50.248564
Surface Hole Longitude: -113.222679

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-06 Obtained License
1980-06-25 Drill Stem Test Performed
1980-07-07 Drill Stem Test Performed
1980-07-20 Finished Drilling
1980-07-20 Well Log Performed
1980-07-22 Drill Stem Test Performed
1980-07-23 Drill Stem Test Performed
1980-07-28 Drill Stem Test Performed
1980-08-09 Production Casing Operation Performed
1980-08-21 Perforation Treatment Performed - Jet Perforation
1980-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-18 Perforation Treatment Performed - Jet Perforation
1980-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-29 Well Mode changed to Drilled and Cased
1981-06-05 Perforation Treatment Performed - Jet Perforation
1981-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-10 Perforation Treatment Performed - Jet Perforation
1981-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-16 Perforation Treatment Performed - Jet Perforation
1981-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-10-19 Perforation Treatment Performed - Fractured
1981-11-12 Well Began Production
1981-11-12 Well Fluid changed to Crude Oil
1981-11-12 Well Mode changed to Pumping
1982-08-15 Well Fluid changed to Crude Oil
1982-08-15 Well Mode changed to Suspended
1984-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-30 Plug Back Performed
1984-11-30 Well Abandoned
1984-11-30 Well Fluid changed to Crude Oil
1984-11-30 Well Mode changed to Abandoned and Re-entered
2004-06-06 Well Log Performed
2004-06-15 Well Log Performed
2004-06-28 Well Log Performed
2004-07-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-21 Perforation 2113.00 2124.00 7
1981-06-10 Perforation 2107.80 2110.80 13
1981-06-11 Acid Treatment 2107.80 2110.80 0
1981-06-13 Acid Treatment 2099.80 2103.80 0
1981-06-13 Acid Treatment 2068.80 2076.80 0
1981-06-16 Perforation 1983.80 1997.80 13
1981-06-17 Acid Treatment 1983.80 1997.80 0
1981-10-17 Packing Device Capped w/Cement 2048.00 2048.00 0
1981-10-19 Fracture 1983.80 1997.80 0
1984-11-30 Packing Device Capped w/Cement 1923.00 1931.00 0
1980-08-22 Acid Treatment 2113.00 2124.00 0
1980-10-18 Perforation 1944.00 1956.00 7
1980-10-19 Acid Treatment 1944.00 1956.00 0
1981-06-05 Perforation 2139.80 2146.80 13
1981-06-06 Acid Treatment 2139.80 2146.80 0
1981-06-07 Acid Treatment 2139.80 2146.80 0
1981-06-10 Perforation 2068.80 2076.80 13
1981-06-10 Perforation 2099.80 2103.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 810 0.0 0.0 0.0
1982 1783 0.0 0.0 0.0

For data sources see[5]

References