X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164241308000

Well Details

Well ID: 0164241308000
Loading map...
Location: 00/08-13-016-24W4/0
Location Alias: 00/08-13-16-24 W4M
Location Alias 2: 00/08-13-016-24 W4/00
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 24
Section: 13
County/Municipality: Vulcan County
Well Name: TRL ET AL VULCAN 8-13-16-24
Operator Name: Trekelano Resources Ltd.
License Number: 0004599
License Date: 1952-05-01
License Status: RecCertified
Spud Date: 1952-05-29
Final Drill Date: 1952-10-11
Well Total Depth: 2504.20 m
Surface Hole Latitude: 50.344750
Surface Hole Longitude: -113.169066

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-05-01 Obtained License
1952-06-21 Drill Stem Test Performed
1952-06-27 Drill Stem Test Performed
1952-07-28 Drill Stem Test Performed
1952-07-30 Drill Stem Test Performed
1952-08-01 Drill Stem Test Performed
1952-08-03 Drill Stem Test Performed
1952-08-05 Drill Stem Test Performed
1952-08-06 Drill Stem Test Performed
1952-08-08 Drill Stem Test Performed
1952-08-09 Drill Stem Test Performed
1952-09-02 Drill Stem Test Performed
1952-09-13 Drill Stem Test Performed
1952-09-17 Drill Stem Test Performed
1952-09-23 Drill Stem Test Performed
1952-09-28 Drill Stem Test Performed
1952-09-29 Drill Stem Test Performed
1952-10-01 Drill Stem Test Performed
1952-10-03 Drill Stem Test Performed
1952-10-05 Drill Stem Test Performed
1952-10-07 Drill Stem Test Performed
1952-10-11 Drill Stem Test Performed
1952-10-11 Finished Drilling
1952-10-16 Production Casing Operation Performed
1952-10-23 Perforation Treatment Performed - Bullet Perforation
1952-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-10-28 Perforation Treatment Performed - Bullet Perforation
1952-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-10-29 Perforation Treatment Performed - Bullet Perforation
1952-10-29 Perforation Treatment Performed - Cement Squeeze
1952-11-04 Perforation Treatment Performed - Bullet Perforation
1952-11-04 Perforation Treatment Performed - Cement Plug
1952-11-06 Perforation Treatment Performed - Bullet Perforation
1952-11-07 Perforation Treatment Performed - Cement Plug
1952-11-09 Perforation Treatment Performed - Bullet Perforation
1952-11-11 Perforation Treatment Performed - Jet Perforation
1952-11-12 Perforation Treatment Performed - Cement Squeeze
1952-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-15 Perforation Treatment Performed - Cement Squeeze
1952-11-17 Perforation Treatment Performed - Jet Perforation
1952-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-20 Perforation Treatment Performed - Cement Squeeze
1952-12-08 Perforation Treatment Performed - Jet Perforation
1952-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-12-11 Perforation Treatment Performed - Jet Perforation
1952-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-12-14 Perforation Treatment Performed - Cement Squeeze
1952-12-16 Perforation Treatment Performed - Jet Perforation
1952-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-01-14 Perforation Treatment Performed - Fractured
1953-03-18 Well Mode changed to Drilled and Cased
1962-02-15 Well Began Production
1962-02-15 Well Fluid changed to Crude Oil
1962-02-15 Well Mode changed to Flowing
1962-02-28 Well Fluid changed to Crude Oil
1962-02-28 Well Mode changed to Pumping
1995-12-14 Well Fluid changed to Crude Oil
1995-12-14 Well Mode changed to Closed
1996-05-02 Well Fluid changed to Crude Oil
1996-05-02 Well Mode changed to Pumping
2000-01-19 Well Fluid changed to Crude Oil
2000-01-19 Well Mode changed to Closed
2001-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-08 Perforation Treatment Performed - Jet Perforation
2001-02-08 Plug Back Performed
2001-02-09 Perforation Treatment Performed - Remedial Casing
2001-02-15 Well Abandoned
2001-02-15 Well Fluid changed to Crude Oil
2001-02-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-10-23 Bullet Perforation 2470.40 2473.50 13
1952-11-04 Cement Plug 2347.00 2385.10 0
1952-11-06 Bullet Perforation 2037.30 2043.40 13
1952-11-07 Cement Plug 1920.20 2072.60 0
1952-11-09 Bullet Perforation 1708.40 1714.50 13
1952-11-11 Perforation 1672.70 1677.90 13
1952-11-12 Cement Squeeze 1708.40 1714.50 0
1952-11-13 Acid Treatment 1672.70 1677.90 0
1952-11-15 Cement Squeeze 1672.70 1677.90 0
1952-11-17 Perforation 1670.90 1674.00 13
1952-11-18 Acid Treatment 1670.90 1674.00 0
1952-10-25 Acid Treatment 2470.40 2473.50 0
1952-11-20 Cement Squeeze 1670.90 1674.00 0
1952-12-08 Perforation 1672.40 1673.70 13
1952-12-08 Perforation 1673.40 1674.60 13
1952-12-09 Acid Treatment 1672.40 1674.60 0
1952-12-11 Perforation 1673.70 1674.90 13
1952-12-12 Acid Treatment 1672.40 1674.90 0
1952-12-14 Cement Squeeze 1672.40 1674.90 0
1952-12-16 Perforation 1627.60 1632.50 13
1952-12-20 Acid Treatment 1627.60 1632.50 0
1952-12-22 Acid Treatment 1627.60 1632.50 0
1952-10-28 Packing Device Capped w/Cement 2467.40 2467.40 0
1953-01-14 Fracture 1627.60 1632.50 0
2001-02-08 Packing Device Capped w/Cement 1627.60 1632.50 0
2001-02-08 Perforation 280.00 280.50 16
2001-02-09 Remedial Casing Cementing 280.00 280.50 0
1952-10-28 Bullet Perforation 2433.80 2436.90 13
1952-10-29 Cement Squeeze 2433.80 2436.90 0
1952-10-29 Bullet Perforation 2420.10 2426.20 13
1952-10-29 Acid Treatment 2420.10 2426.20 0
1952-10-29 Packing Device Capped w/Cement 2407.90 2407.90 0
1952-11-04 Bullet Perforation 2388.10 2394.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8015 0.0 0.0 0.0
1973 7296 0.0 0.0 0.0
1974 1608 0.0 0.0 0.0
1975 144 0.0 0.0 0.0
1976 1042 0.0 0.0 0.0
1977 1824 0.0 0.0 0.0
1978 3344 0.0 0.0 0.0
1979 6714 0.0 0.0 0.0
1980 3629 0.0 0.0 0.0
1981 3866 0.0 0.0 0.0
1982 7503 0.0 0.0 0.0
1983 7052 0.0 0.0 0.0
1984 6869 0.0 0.0 0.0
1985 8700 0.0 0.0 0.0
1986 8517 0.0 0.0 0.0
1987 4483 0.0 0.0 0.0
1988 676 0.0 0.0 0.0
1990 1314 0.0 0.0 0.0
1991 695 0.0 0.0 0.0
1993 6192 0.0 0.0 0.0
1994 492 0.0 0.0 0.0
1996 80 0.0 0.0 0.0

For data sources see[5]

References