X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194102408002

Well Details

Well ID: 0194102408002
Loading map...
Location: 00/08-24-019-10W4/2
Location Alias: 00/08-24-19-10 W4M
Location Alias 2: 00/08-24-019-10 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 10
Section: 24
County/Municipality: Cypress County
Well Name: IMAGINEA PRIN 8-24-19-10
Operator Name: Cor4 Oil Corp.
License Number: 0097086
License Date: 1982-08-19
License Status: Issued
Spud Date: 1982-08-19
Final Drill Date: 1982-08-22
Well Total Depth: 1059.00 m
Surface Hole Latitude: 50.620261
Surface Hole Longitude: -111.255183

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-19 Obtained License
1982-08-22 Finished Drilling
1982-08-22 Well Mode changed to Drilled and Cased
1982-08-23 Drill Stem Test Performed
1982-08-23 Well Log Performed
1982-08-24 Drill Stem Test Performed
1982-08-25 Drill Stem Test Performed
1982-08-25 Production Casing Operation Performed
1982-09-02 Perforation Treatment Performed - Jet Perforation
1982-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-03 Perforation Treatment Performed - Cement Squeeze
1982-09-04 Perforation Treatment Performed - Jet Perforation
1983-06-01 Perforation Treatment Performed - Jet Perforation
1983-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-04 Perforation Treatment Performed - Cement Squeeze
1983-06-07 Well Began Production
1983-06-07 Well Fluid changed to Crude Oil
1983-06-07 Well Mode changed to Pumping
1983-12-22 Perforation Treatment Performed - Visqueeze
1984-01-03 Perforation Treatment Performed - Jet Perforation
1984-04-30 Well Fluid changed to Crude Oil
1984-04-30 Well Mode changed to Suspended
1985-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-17 Plug Back Performed
1985-03-17 Well Fluid changed to Crude Oil
1985-03-17 Well Mode changed to Abandoned Zone
1985-03-18 Perforation Treatment Performed - Jet Perforation
1985-03-19 Perforation Treatment Performed - Fractured
1985-03-20 Perforation Treatment Performed - Fractured
1985-03-20 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-02 Perforation 1033.20 1034.20 13
1984-01-03 Perforation 1013.00 1013.50 13
1985-03-17 Packing Device Capped w/Cement 1002.50 1010.50 0
1985-03-18 Perforation 484.00 487.00 7
1985-03-18 Perforation 502.00 504.00 7
1985-03-18 Perforation 511.50 512.50 7
1985-03-18 Perforation 515.00 517.00 7
1985-03-18 Perforation 521.00 532.50 7
1985-03-19 Fracture 484.00 532.50 0
1985-03-20 Perforation 400.50 401.50 7
1985-03-20 Perforation 407.00 408.00 7
1982-09-03 Acid Treatment 1033.20 1034.20 0
1985-03-20 Perforation 408.50 410.50 7
1985-03-20 Perforation 421.00 423.00 7
1985-03-20 Perforation 424.50 426.00 7
1985-03-20 Fracture 400.50 426.00 0
1982-09-03 Cement Squeeze 1033.20 1034.20 0
1982-09-04 Perforation 1026.00 1029.00 6
1982-09-04 Perforation 1019.00 1024.50 6
1983-06-01 Perforation 1013.00 1015.00 7
1983-06-02 Acid Treatment 1013.00 1015.00 0
1983-06-04 Cement Squeeze 1019.00 1029.00 0
1983-12-22 Visqueeze 1013.00 1015.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 202 0.0 0.0 0.0
1984 973 0.0 0.0 0.0

For data sources see[5]

References